Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Poland

Poland, Pomerania - pl/27

Road

The consortium consisting of Porr, Gulermak and Energopol-Szczecin signed the EUR150.31million contract for the design and construction of the Świnoujście tunnel . Once the tunnel is completed in the autumn of 2022 it will provide a direct connection between Uznam and the Polish mainland.

The total length of the project is approximately 3.2 km. This includes a 1.44 km TBM-excavation using the slurry shield procedure. The breakout diameter of the tunnel will be 13.5 m. A two-way roadway will be constructed with traffic lanes with a width of 3.5 m and evacuation niches will be built using ground freezing. Visit https://porr-group.com/en/press/press-release/news/porr-konsortium-baut-tunnel-in-swinemuende-1/. 38/18.




Permalink

Astaldi Group (99,9%) and Ghella (0,01%) have been awarded the EUR 139 million contract for the construction design and building by TBM of  a 1.5 km tunnel, under the River  to link road to the islands of Uznam and Wolin to Swinoujscie. The contract includes the construction of a 860 m cut-and-cover tunnel, the installation of all E&M systems and related works. The works will be financed using European Union and state funding for the Municipality of Swinoujscie. The planned duration of works is 48 months. Visit http://www.astaldi.com/en/press-releases/astaldi-new-construction-orders-eur-243-million.

25/18.




Permalink

SWS has been awarded the €150 million contract for the final and detailed design of the road tunnel under the Swina river between the islands of Uznam and Wolin in Swinoujscie (Poland), near the German border, this is a project co-funded by the EU. SWS's client is the Consortium composed of Porr, Gulermak and Energopol-Szczecin. The contract will be implemented as a Design & Build. The 1.44 km tunnel will be excavated with a 13.5 m diameter Slurry TBM. All activities will be carried out in a BIM environment. For further information please visit http://www.swsglobal.com/2018/11/19/sws-awards-a-new-contract/ . 47/18.




Permalink


Open invitation to tender, deadline 23/02/2023, for the design, delivery, assembly, installation and servicing of a stationary device recording the average speed in the tunnel under Swina river in Swinoujscie on the DK 93 road. Click here for bid/tender documents and where tenders must be sent. Duration of contract is 182 days. Contact Gmina Miasto Swinoujscie, attn Ewa Bimkiewicz, Swinoujscie, tel +48 913212425 , email bzp@um.swinoujscie.pl. Visit https://ted.europa.eu/en/notice/-/detail/44564-2023. Ref.n. BZP.271.1.46.2022. 04/23.




Permalink

Sprint SA from Olsztyn has been awarded the EUR240,925 (PLN1.05 million) contract, excluding VAT, for the design, delivery, assembly, installation and servicing of a stationary device recording the average speed in the tunnel under Swina river in Swinoujscie on the DK 93 road. Contact Gmina Miasto Swinoujscie, attn Ewa Bimkiewicz, Swinoujscie, tel +48 913212425 , email bzp@um.swinoujscie.pl. Visit https://ted.europa.eu/en/notice/-/detail/46749-2024. Ref.n. BZP.271.1.46.2022. 04/24.






Permalink