Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Denmark

Denmark, South Zealand - dk/14

Railway

Decision expected in Spring, 2000 concerning options for construction of a fixed link across the Fehmarn Strait between Denmark and Germany. Proposals range over a variety of bridges and bored and immersed tubes for road and rail. 19.9 km-long twin-tube bored railway tunnel costing $3.35bn most likely, with a construction time of 7 years. November 1999.Restricted invitation to tender, deadline 1st July, 2008 for tunnel design as part of the Fehmarnbelt fixed link between Denmark and Germany. Click here to read the Memorandum of Understanding that Germany and Denmark signed in June 2007, which explains why a tender procedure is run in parallel for both a bridge and a tunnel solution. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=101523-2008, OJ S 75, or contact Femern Baelt, Copenhagen, tel. +45 33416300. E-mail fen@femernbaelt.dk. Visit www.fehmarnlink.com and www.femerbaelt.dk 20/08.



Permalink

Invitation to tender by restricted procedure, deadline 12.06.2009, for 9-year framework agreement, estimated value between EUR100,000 and EUR800,000, excluding VAT. Contract requires detailed design and production of concrete blocks for field exposure at a site in Rodbyhavn; design and execution of a test and monitoring programme; and evaluation of self compacting concrete quality requirements for proposed 20 km-long fixed link which will connect the islands of Lolland in Denmark and Fehmarn in Germany.The link will carry a four-lane motorway and two-track railway. Further information, specs and docs from Ulf Jonsson at Femern Baelt A/S in Copenhagen, tel +45 33416-300, fax -301, e-mail ujo@femernbaelt.dk, to whom tenders or requests to participate should be sent. More from www.fehmarnlink.com. http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=131410-2009 20/09.



Permalink

Major Fehmarnbelt immersed tunnel design contract, value EUR20 million excluding VAT, awarded to Ramboll-Arup-TEC joint venture of Virum, tel +45 45986-000, fax -700, e-mail ramboll@ramboll.dk. More from Steen Lykke at Femern Baelt A/S in Copenhagen, tel +45 33416-300, fax -301, e-mail sly@femernbaelt.dk. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=135930-2009. 21/09.



Permalink

Restricted invitation to tender for railway design for 250 km/h 19 km-long coast-to-coast fixed link, which may be on bridge or in tunnel built by others. Contract starts 04.12.2009 for completion 31.12.2019. Value EUR2.5-5 million for period until end-2012, excluding VAT, increasing thereafter. Further information, specs and docs from Jan Schneider-Tilli at Femern Baelt A/S in Copenhagen, tel +45 334163-00, fax -01, e-mail jst@femern.dk to whom tenders or requests to participate must be sent. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=228125-2009 34/09.



Permalink

Restricted invitation to tender for safety planning and risk management for 250 km/h railway part of 19 km-long coast-to-coast fixed link, which may be on bridge or in tunnel built by others. Contract starts 04.12.2009 for completion 31.12.2019. Value EUR250,000-EUR500,000 for period until end-2012, excluding VAT, increasing thereafter. Further information, specs and docs from Jan Schneider-Tilli at Femern Baelt A/S in Copenhagen, tel +45 334163-00, fax -01, e-mail jst@femern.dk to whom tenders or requests to participate must be sent. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=229454-2009 34/09.



Permalink

Open invitation to tender, deadline 30.10.2009, for Chartered Surveyor services in connection with Fehmarnbelt fixed link project. Framework agreement duration 120 months. Estimated value, excluding VAT, EUR600,000 - EUR1.35 million. Time limit for receipt of requests for documents or for accessing documents 09.10.2009 at 14.00h. Further information, specs and docs from Claus Dynesen at Femern Baelt A/S in Copenhagen, tel +45 33416-300, fax -301, e-mail cdy@femern.dk to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=257240-2009. 38/09.



Permalink

Contract for Lot 1 consultative engineering in railway safety planning and risk management for Fehmarnbelt fixed link, value EUR315,000 excluding VAT, awarded to Atkins Danmark A/S of Copenhagen, tel +45 823390-00, fax -01, e-mail info-dk@atkinsglobal.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=345928-2009. 51/09.Contract for Lot 1 railway design for Fehmarnbelt fixed link, value EUR2,076,000 excluding VAT, awarded to Voessing GmbH of Duesseldorf, tel +49 211905-45, fax -4619, e-mail rudolf.vienenkoetter@voessing.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=345926-2009. 51/09.



Permalink

Femern A/S has recommended straight 18 km-long, 41.2 m-wide x 8.9 m-high reinforced concrete five-compartment immersed road/rail tunnel proposal designed by Ramboll-Arup-TEC consortium of Virum, tel +45 45986-000, fax -700, e-mail ramboll@ramboll.dk for decision by Ministry of Transport early-2011 subject to acceptable EIA report. Visit www.femern.com for full press release dated 30.11.2010. For 10-year project history visit tunnelbuilder archive dk/14. 48/10.



Permalink

Invitation to tender using restricted procedure, deadline 09.08.2011, for E&M engineering design services in connection with Fehmarnbelt fixed link project. Framework agreement duration 36 months. Estimated value, excluding VAT, EUR6 million. Further information, specs and docs from Steen Lykke at Femern Baelt A/S in Copenhagen, tel +45 33416-300, fax –301, e-mail sly@femern.dk to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=202627-2011. 26/11.



Permalink

Femern A/S has prequalified five entities to participate in the bidding for a consultancy contract on E&M systems in the Fehmarnbelt tunnel. The prequalified entities are as follows: JV í…F Hansen & Henneberg/Poyry Infra GmbH; Mott MacDonald Ltd; JV Ramboll/Arup/TEC; COWI A/S in collaboration with HBI Haerter AG, M&E Engineering, GBI Gackstatter Beratende Ingenieure GmbH, Barbara Consult and HOJ Consulting GmbH; JV Grontmij A/S/Capita Symonds Ltd. Closing date for delivering bids to Femern A/S is 28.11.2011. Click here. Visit www.femern.com. 44/11.



Permalink

Award of contract value EUR4.26 million excluding VAT to FEM Consult JV of Herlev, Denmark for E&M engineering design services in connection with Fehmarnbelt fixed link project. Framework agreement covers design and E&M, duration 36 months from 12.01.2012. Further information from FEM, tel +45 38165000, e-mail mail@afhh.dk. Client contact Peter Tracy at Femern A/S in Copenhagen, tel +45 33416-300, fax –301, e-mail ptr@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028333-2012. 05/12.



Permalink

Prior information notice of intended start of award procedures for Fehmarnbelt fixed link project tunnel South contract. Scheduled start of works 01.07.2014, completion 01.07.2020. Contact Femern A/S, attn Kim Smedegaard Andersen, Kobenhavn V, e-mail ksa@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=038871-2012. 06/12.

Prior information notice of intended start of award procedures for Fehmarnbelt fixed link project Dredging and Reclamation Contract. Scheduled start of works 01.07.2014, completion 01.07.2020. Contact Femern A/S, attn Joergen Andersen,Kobenhavn V, e-mail jan@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=038870-2012. 06/12.



Permalink

Prior information notice of intended start of award procedures for Fehmarnbelt fixed link project tunnel North contract DK02. Scheduled start of works 01.07.2014, completion 01.07.2020. Contact Femern A/S, attn Kim Smedegaard Andersen, Kobenhavn V, e-mail ksa@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=040282-2012. 06/12.

Prior information notice of intended start of award procedures for Fehmarnbelt fixed link project Portals Ramps and Landworks contract. Scheduled start of works 01.07.2014, completion 01.07.2020. Contact Femern A/S, attn Henrik Christensen,

Kobenhavn V, e-mail hch@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=040283-2012. 06/12.



Permalink

Invitation to tender by restricted procedure, deadline 03.08.2012, for 9-year framework agreement, value EUR1.34 million, for assessment body and notified body services covering fixed link railway infrastructures. Further information, specs and docs from Johnny Restrup-Soerensen at Femern Baelt A/S in Copenhagen, tel +45 33416-300, fax –301, e-mail jrs@femernbaelt.dk, to whom tenders or requests to participate should be sent. More from www.fehmarnlink.com. Visit tunnelbuilder archive dk/14 for project history, and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=214427-2012. 28/12.



Permalink

Invitation to tender using competitive dialogue, deadline 18.01.2013, for construction of Fehmarnbelt fixed link project tunnel North. Scheduled start of works 01.07.2014, completion 01.07.2020, duration 68 months. Contact Femern A/S, attn Kim Smedegaard Andersen, Kobenhavn V, e-mail support@femern.dk. Tenders or requests to participate must be made electronically at www.femern.dk, contract DK02.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=315514-2012. 40/12.

Invitation to tender using competitive dialogue, deadline 18.01.2013, for construction of Fehmarnbelt fixed link project tunnel South contract. Scheduled start of works 01.07.2014, completion 01.07.2020, duration 68 months. Contact Femern A/S, attn Kim Smedegaard Andersen, Kobenhavn V, e-mail support@femern.dk. Tenders or requests to participate must be made electronically at www.femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=315515-2012. 40/12.

Invitation to tender using competitive dialogue, deadline 18.01.2013, for construction of Fehmarnbelt fixed link project Portals Ramps and Landworks contract. Scheduled start of works 01.07.2014, completion 01.07.2020, duration 78 months. Contact Femern A/S, attn Henrik Christensen, Kobenhavn V, e-mail support@femern.dk. Tenders or request to participate must be made electronically at www.femern.dk.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=315516-2012. 40/12.



Permalink

Invitation to tender using competitive dialogue, deadline 18.01.2013, for Dredging and Reclamation Contract of Fehmarnbelt fixed link project. Duration contract 78 months after award. Contact Femern A/S, attn Joergen Andersen,Kobenhavn V, e-mail support@femern.dk. For electronic access to information and submission of tenders and requests to participate http://femern.dk/default.aspx?ObjectId=CC2DC215-CA78-47A5-9139-3E194525854F&ObjectVersion=1. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=317160-2012. 41/12.



Permalink

Femern A/S has signed contracts with the consortium RINA Services SpA and SINTEF for assessing and verifying the rail project between Rodby and Puttgarden until the fixed link opens. The consortium will examine and assess the design and planning of the tunnel’s rail system as well as the entire Femern A/S rail safety and risk management. Further information from Johnny Restrup-Sorensen, Director of the Rail Department at Femern A/S, tel + 45 33 41 63 00, e-mail jrs@femern.dk. Visit www.femern.com. 05/13.



Permalink

Femern A/S has prequalified nine large contractor consortia to submit tenders for the four major construction contracts for the fixed link across the Fehmarnbelt. The four contracts are: 1) tunnel north, 2) tunnel south, 3) portals and ramps, and 4) dredging and land reclamation. Between three and five consortia are prequalified to tender for each of the four contracts.    

Femern A/S expects to have the final bids and prices in time for inclusion in the Danish parliament’s work on the Construction Act, which is expected to be to be discussed towards the end of 2014.  

The firms in the nine contracting consortia come from Denmark, Germany, Italy, Spain, the Netherlands, Belgium, France and South Korea. Firms from the UK and the USA are also linked to some of the nine groups.    

The following consortia are prequalified to bid for one or more or the four construction contracts:  

Tunnel north:

Fehmarn Belt Contractors (Germany); Femern Link Contractors (France); JV Salini-Impregilo-Samsung-Bunte (Italy); OHL-Daewoo-Daelim JV (Spain); Immersia (Spain).  

Tunnel south:

Fehmarn Belt Contractors (Germany); Femern Link Contractors (France); JV Salini-Impregilo-Samsung-Bunte (Italy); OHL-Daewoo-Daelim JV (Spain); Immersia (Spain).  

Portals and ramps:

Fehmarn Belt Contractors (Germany); Femern Link Contractors (Denmark) – another company in the group will be the lead partner of the consortium; JV Salini-Impregilo-Samsung-Bunte (Italy); OHL-Daewoo-Daelim JV (Spain).  

Tunnel dredging and land reclamation

Fehmarn Belt Contractors (Netherlands) – another company in the group will be the lead partner of the consortium; Femern Link Contractors (Belgium) – the group has a different composition compared to the other contracts; Jan De Nul NV (Belgium).

For the prequalified consortia details, click here. The leading company is listed first in each consortium. For further details, please contact Technical Director Steen Lykke on tel +45 33 41 63 00 or Press Officer Karsten Holmegaard on tel. +45 40 10 42 50. Visit www.femern.dk. 22/13.  



Permalink

The Environmental Impact Assessment (EIA) report for the fixed link across the Fehmarnbelt is ready to be considered by the Danish authorities and citizens. Throughout the consultation period for the project, started on 28.06.2013, the public – citizens, the authorities, NGOs and businesses – will have the opportunity to come up with ideas, suggestions and comments.  A public meeting is scheduled on Thursday 29.08.2013 from 17.00 to 20.00 in Lalandia, Rodby, where everyone will have the opportunity to ask questions and express their views. The objective is for the tunnel between Rodbyhavn and Puttgarden to be open by the end of 2021. Visit www.femern.com. 27/13.



Permalink

The public consultation on the fixed link across the Fehmarnbelt is concluded. In total, 41 responses were submitted from Danish authorities, stakeholders, companies and private citizens in the period from 28.06.2013 – 20.10.2013. In collaboration with the relevant authorities and Femern A/S, the Transport Minister will respond to all incoming proposals and comments to the project in a consultation report, which is expected to take three months. Based on the consultation report and the EIA, a proposal for a Construction Act will be drawn up, which is scheduled to be put before the Danish parliament at the end of 2014. Visit http://www.femern.com. 39/13.



Permalink

Prior Information Notice for design, procurement and installation of the Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) system for the tunnel of Fehmarnbelt Fixed Link Project. Range value of contract EUR400-700 million, excluding VAT, duration 01.10.2015 to 31.12.2021. Start of awarding procedure: 31.08.2015. Femern A/S will hold an industry day to provide interested parties with more information on the project on 21.01.2014 at IDA Modecenter A/S, Copenhagen V. Contact Femern A/S, att.n Peter Tracy, Copenhagen V, e-mail support@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=413023-2013. 50/13.



Permalink

Periodic indicative notice without call for competition for the tunnel power supply (TPS) contract for Fehmarnbelt fixed link project. The contract includes the design, construction and maintenance of the secondary system and the ancillary civil works to prepare the site for the TPS station, located at Rodby on Lolland. Contact Femern A/S, att.n Johnny Restrup-Sorensen, Copenhagen V. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=425459-2013. 51/13.



Permalink

Periodic indicative notice without call for competition for the tunnel catenary and track (TCT) contract for Fehmarnbelt fixed link project. Contact Femern A/S, att.n Johnny Restrup-Sorensen, Copenhagen V. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=425404-2013. 51/13.



Permalink

Invitation to tender using negotiated procedure, deadline 28.04.2014, for the Tunnel Power Supply (TPS) contract for Fehmarnbelt fixed link project. The contract includes the design, construction and maintenance of the secondary system and the ancillary civil works to prepare the site for the TPS station, located at Rodby on Lolland. Range value of contract EUR40-60 million, excluding VAT, duration from 31.08.2015 to 31.08.2025. Contact Femern A/S, att.n Johnny Restrup-Sorensen, Copenhagen V, email info@femern.dk.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=043785-2014. 07/14.



Permalink

Invitation to tender using negotiated procedure, deadline 12.05.2014, for the tunnel electrical and mechanical contract under which MEICA systems will be designed, procured and installed for Fehmarnbelt fixed link project. Range value of contract EUR400-700 million, excluding VAT, duration from 01.10.2015 to 30.06.2024. Further information, specs and docs from Femern A/S, att.n Peter Tracy, Copenhagen V, e-mail info@femern.dk, to whom tenders or requests to participate must be sent.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=042236-2014. 07/14.



Permalink

Invitation to tender by restricted procedure, deadline 25.03.2014, for supply and installation of pumps for new pumping station Strandholm at Rodbyhavn. Contact Femern A/S, att.n Carsten Faber Henriksen, Copenhagen V, tel +45 51616209, fax +45 33416301, e-mail cafh@ramboll.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=065831-2014. 11/14.



Permalink

Postponed from 12.05.2014 to 21.05.2014 the deadline for the invitation to tender using negotiated procedure for the tunnel electrical and mechanical contract under which MEICA systems will be designed, procured and installed for Fehmarnbelt fixed link project. Range value of contract EUR400-700 million, excluding VAT, duration from 01.10.2015 to 30.06.2024. Further information, specs and docs from Femern A/S, att.n Peter Tracy, Copenhagen V, e-mail info@femern.dk, to whom tenders or requests to participate must be sent.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=151927-2014. 19/14.



Permalink

Femarn A/S has selected the firms and consortia that are pre-qualified for the contracts for the Fehmarnbelt tunnel electrical and mechanical installations as well the establishment of the sub-station which will supply the tunnel and electric trains with power. Strabag/Bravida Consortium, Tema Consortium, Alstom Transporte and Femern Electrical and Mechanical Contractors are pre-qualified for electrical and mechanical installations; Bravida Danmark A/S, Cegelec Mobility-Siemens A/S Consortium, Elektrobudowa SA are pre-qualified for the sub-station. Final bids at the end of 2015. Contracts are expected to be signed in 2016. Visit www.femern.com/service-menu/press--document/press-releases/femern-pre-qualifies-for-multi-million-contracts. 37/14.



Permalink

Invitation to tender by restricted procedure, deadline 08.06.2015, for framework agreement with one supplier regarding laboratory research, design, testing and monitoring of concrete blocks during the construction period of the Fehmarnbelt Fixed Link. Duration of contract 6 years. Range value contract EUR600,000-2,000,000, excluding VAT. For electronic access to information http://www.femern.com/concrete-investigations. Contact Femern Baelt A/S, att.n Sabine Olesen, Copenhagen V, tel +45 33416300, fax +45 33416301, e-mail sol@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=160296-2015. 19/15.

 



Permalink

Invitation to tender by restricted procedure, deadline 30.06.2015, for a framework agreement for consultancy services to Fehmarn A/S technical departments of design- and risk-related issues during the construction period of the Fehmarnbelt Fixed Link. Duration of contract eight years. For electronic access to information http://www.femern.dk/konsulentbistand. Contact Femern Baelt A/S, att.n Sabine Olesen, Copenhagen V, tel +45 33416300, fax +45 33416301, e-mail sol@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=170290-2015. 21/15



Permalink


Danish Technological Institute from  Taastrup secured the EUR1,433,200 contract, excluding VAT, for a framework agreement with one supplier regarding laboratory research, design, testing and monitoring of concrete blocks during the construction period of the Fehmarnbelt Fixed Link. Contact Femern Baelt A/S, att.n Sabine Olesen, Copenhagen V, tel +45 33416300, fax +45 33416301, e-mail sol@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=5611-2016. 02/16.




Permalink


On the 04.03.2016 Femern A/S announced that the Danish political parties behind the Fehmarnbelt link mandated Femern A/S are to choose the preferred bidders for the main tunnel contracts with the aim of entering conditional contracts no later than mid-May 2016. Conditional contracts mean that final and binding contracts will be signed with the successful contractors, but that construction work will be postponed until the German construction permit is in place. The contracts are valid until the end of 2019 with the option to renegotiate at that time.

Once the final conditions for conditional contracts are settled satisfactorily between Femern A/S and the winning contractors, the company will present the results to the Minister of Transport before the contracts are signed in May 2016. Visit http://femern.com/en/News-and-press/2016/March/Fehmarnbelt-tunnel-contractors-appointed. 09/16.




Permalink


The group Femern Link Contractors from Copenhagen secured the EUR1.37 billion contract, excluding VAT, for the construction of the Fehmarnbelt fixed link project tunnel South. For further information contact Femern A/S, attn Kim Smedegaard Andersen, Copenhagen, e-mail support@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=79339-2016. 10/16.




Permalink


The group Femern Link Contractors from Copenhagen secured the EUR1.37 billion contract, excluding VAT, for the construction of the Fehmarnbelt fixed link project tunnel North. For further information contact Femern A/S, attn Kim Smedegaard Andersen, Copenhagen, e-mail support@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=79336-2016. 10/16.




Permalink


The Group Fehmarn Belt Contractors from Papendrecht secured the EUR 560.92 million contract, excluding VAT, for Dredging and Reclamation for the Fehmarnbelt fixed link project. Contact Femern A/S, attn Joergen Andersen, Copenhagen, e-mail support@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=79338-2016. 10/16.




Permalink


The group Femern Link Contractors from Copenhagen secured the EUR519.74 million contract, excluding VAT, for construction of the Fehmarnbelt fixed link project portals, ramps and landworks. For further information contact Femern A/S, attn Henrik Christensen, Copenhagen, e-mail support@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=79337-2016. 10/16.




Permalink

Femern A/S has prequalified the following companies to submit tenders for two framework agreements on client consulting services and technical in-house consulting services, respectively.

Companies prequalified for client consulting services are:

  • CH2M HILL United Kingdom (UK), with NIRAS A/S (Denmark),Dr. tech. Olav Olsen AS (Norway) and Sellhorn Ingenieurgesellschaft mbh (Germany) as Sub-consultants;
  • Rambøll-Arup-TEC Joint Venture (Denmark, UK, Netherlands) with WTM Engineers GmbH (Germany) and Schønherr A/S (Denmark) as Sub-consultants;
  • Sweco Danmark A/S (Denmark) with Sweco Nederland B.V. (Netherlands) and Mott MacDonald Ltd. (UK) as Sub-consultants; 
  • ÅF Infrastructure AB (Sweden).

 

Companies prequalified for technical in-house consulting services:

  • CH2M HILL United Kingdom (UK), with NIRAS A/S (Denmark),Dr. tech. Olav Olsen AS (Norway) and Sellhorn Ingenieurgesellschaft mbh (Germany) as Sub-consultants;
  • EKJ-ILF-GEO (Denmark, Austria);
  • Rambøll-Arup-TEC Joint Venture (Denmark, UK, Netherlands) with WTM Engineers GmbH (Germany) as Sub-consultants;
  • Sweco Danmark A/S (Denmark);
  • ÅF – Hansen & Henneberg A/S (Denmark) with ÅF Infrastructure AB (Sweden) as Sub-consultants.

 

Click dk/14 for tunnelbuilder archive. Contact Femern A/S, attn Jens Villemoes, Press Manager, tel +45 33 41 44 27, e-mail jvi@femern.dk. Visit http://femern.com/en/News-and-press/2016/October/Femern-AS-prakvalificerer-til-bygherreraadgivning. 44/16



Permalink

Femern A/S has been awarded to Ramboll-Arup-TEC a joint venture  (UK, Denmark, and Holland). Also includes WTM Engineers GmbH (Germany) and Schønherr A/S (Denmark) as Sub-consultants, the EUR115 million contract for the framework agreement for client consultancy services in technical areas for the Fehmarnbelt fixed link project tunnel. Please contact Femern A/S, att.n Anne Bogh Johansen, tel +45 33414449, fax +45 33416301, email ajo@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=108286-2017 and http://femern.com/en/News-and-press/2017/March/Femern-AS-underskriver-kontrakter-med-tekniske-raadgivere. 22/17.



Permalink

Femern A/S signed the EUR35 million contract, excluding VAT, with AF – Hansen & Henneberg A/S (Denmark), with Atkins Danmark A/S (Denmark), Obermeyer Planen + Beraten GmbH (Germany) and ÅF Infrastructure AB (Sweden) as sub-consultants, for a framework agreement on in-house consultancy services in the technical area for Fehmarnbelt fixed link project tunnel. Contact Femern A/S, att.n Anne Bogh Johansen, tel +45 33414449, fax +45 33416301, email ajo@femern.dk. Visit http://femern.com/en/News-and-press/2017/March/Femern-AS-underskriver-kontrakter-med-tekniske-raadgivere. 22/17.



Permalink

Landinspektorfirmaet LE34 A/S from Ballerup secured the EUR1.34 million contract, excluding VAT, for Land Inspector consultancy services for the Fehmarnbelt fixed link project tunnel. Please contact Femern A/S, att.n Anne Bogh Johansen, tel +45 33414449, fax +45 33416301, email ajo@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=383311-2017. 41/17.



Permalink

Dredging International NV from Zwijndrecht (Belgium) became part of the consortium Femern Link Contractors, composed of VINCI Construction Grands Projets Sas, Per Aarsleff Holding A/S, CFE SA, Soletanche Bachy International Sas, BAM Infra BV, BAM International BV, Wayss & Freytag Ingenieurbau AG and Max Bögl Stiftung & Co. KG., this will  be for the construction of the Fehmarnbelt fixed link project tunnel South. For further information contact Femern A/S, attn Chefjurist Casper Schmidt, Copenhagen, tel +45 33414414, fax +45 33416301, email csc@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=151966-2018.

15/18.



Permalink

M.J. Eriksson A/S from Brøndby Strand secured the EUR906.009 contract, excluding VAT, for drainage works that enable archaeological studies to be carried out in the emptied and dried-out Strandholm Lake at Rødbyhavn in Lolland municipality for the Fehmarnbelt fixed link project tunnel.

Please contact Femern A/S, att.n Anne Bogh Johansen, tel +45 33414449, email ajo@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=483903-2018.

45/18.



Permalink

Invitation to tender by restricted procedure, deadline 24.06.2019, for a Framework Agreement for Railway Technical Consultancy Services. The Framework Agreement shall cover railway consultancy services throughout the remaining part of the Fehmarnbelt Fixed Link project as well as in connection with the transition from construction phase to operational phase and in the beginning of the operational phase. Value of the contract is EUR18 million, excluding VAT. Duration of contract 96 months. For bid documents:

http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=240181&B=KA where offers must be sent. Contact Femern Baelt A/S, att.n Anne Bogh Johansen, Copenhagen V, tel +45 33414449, email ajo@femern.dk. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=281056-2019

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=233061-2019.

25/19.



Permalink

Invitation to tender by restricted procedure, deadline 24.06.2019, for a Framework Agreement for Railway Safety Consultancy Services throughout the remaining part of the Fehmarnbelt Fixed Link project as well as the beginning of the operational phase. Value of the contract is EUR4 million, excluding VAT. Duration of contract 96 months. For bid documents:

http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=240125&B=KA where offers must be sent. Contact Femern Baelt A/S, att.n Anne Bogh Johansen, Copenhagen V, tel +45 33414449, email ajo@femern.dk. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=281055-2019

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=233073-2019.

25/19.



Permalink

Negotiated invitation to tender, deadline 13/12/2019, for a Requirement Management Software to be used during the design, build and operation phases of the fixed link across Femern Belt for managing a large amount of requirements. Value of the contract is EUR610,000, excluding VAT. Duration of the contract is 120 months. For tender documents please click here and here where offers must be sent. Contact Femern A/S, attn Mr Mikkel Molgaard, Copenhagen V, tel +45 33416396, email mmd@femern.dk. 49/19.



Permalink

Periodic indicative notice without call for competition for the TPS (Tunnel Power Supply) contract for Fehmarnbelt Fixed Link Project. The contract relates to the design, manufacture, installation and maintenance of the sub-systems to provide a power supply to the Fehmarn Railway System and a power supply to the Tunneland its ancillary facilities. Value of the contract is EUR70 million, excluding VAT. Estimated date of publication of contract notice 31/03/2020. Contact Femern A/S, attn Jonathan Jacobson, Copenhagen V, email jja@femern.dk.  For tender documents please click here 49/19.



Permalink

Prior information notice without call for competition for the TEM (Tunnel Electrical and Mechanical) contract for Fehmarnbelt Fixed Link Project.

The contract relates design, procurement and building/installation of a MEICA (Mechanical, Electrical, Instrumentation, Control and Automation) system for the tunnel. Value of the contract is EUR700 million, excluding VAT.

Estimated date of publication of contract notice 31/03/2020.  Contact Femern A/S, attn Jonathan Jacobson, Copenhagen V, email jja@femern.dk.

For tender documents please click here. 49/19.



Permalink

The negotiated procedure, deadline 28.04.2014, for the Tunnel Power Supply (TPS) contract for Fehmarnbelt fixed link project has been  discontinued.

Femern A/S decided to terminate the procurement process in order to make a new call for competition during 2020. Contact Femern A/S, Copenhagen V, email info@femern.dk .  For tender documents please click here

05/20.



Permalink

The invitation to tender using negotiated procedure, deadline 12.05.2014, for the TEM (Tunnel Electrical and Mechanical) contract under which MEICA systems will be designed, procured and installed for Fehmarnbelt fixed link project has been  discontinued. Femern A/S decided to terminate the procurement process in order to make a new call for competition during 2020.  Contact Femern A/S, att.n Jonathan Jacobson, Copenhagen V, email jja@femern.dk.  For tender documents please click here 05/20.



Permalink


Prior information notice without call for a Tunnel Electrical and Mechanical Contract for the Fehmarnbelt Fixed Link Project. The contract relates to design, procurement and building/installation of a MEICA (Mechanical, Electrical, Instrumentation, Control and Automation) system for the tunnel. Value of the contract is EUR700 million, excluding VAT.

Estimated date of publication of contract notice 30/11/2020.  Contact Femern A/S, attn Jonathan Jacobson, Copenhagen V, email jja@femern.dk. For tender documents please click here and here. 30/20.





Permalink


Periodic indicative notice without call for competition for the TPS (Tunnel Power Supply) contract for the  Fehmarnbelt Fixed Link Project. The contract relates to the design, construction and maintenance of the secondary system and the ancillary civil work. Value of the contract is EUR70 million, excluding VAT. Estimated date of publication of the contract notice 01/02/2021. Contact Femern A/S, attn Jonathan Jacobson, Copenhagen V, email jja@femern.dk.  For tender documents please click here.  30/20.





Permalink


Negotiated invitation to tender, deadline 09/03/2021, for the TEM (Tunnel Electrical and Mechanical) contract for Fehmarnbelt Fixed Link Project. The contract relates design, procurement and building/installation of a MEICA (Mechanical, Electrical, Instrumentation, Control and Automation) system for the tunnel. For tender documents please click here, where tenders must be sent. Value of the contract is EUR750 million, excluding VAT. Duration of the contract is 108 months. Contact Femern A/S, attn Jonathan Jacobson, Copenhagen V, tel +45 33414453, email info@femern.dk.  For tender documents please click here.  05/21. 

 




Permalink


Additional information on the negotiated invitation to tender, deadline 09/03/2021, for the TEM (Tunnel Electrical and Mechanical) contract for the Fehmarnbelt Fixed Link Project. The contract relates to design, procurement and building/installation of a MEICA (Mechanical, Electrical, Instrumentation, Control and Automation) system for the tunnel. For tender documents please click here, where tenders must be sent. Value of the contract is EUR750 million, excluding VAT. Duration of the contract is 108 months. Contact Femern A/S, attn Jonathan Jacobson, Copenhagen V, tel +45 33414453, email info@femern.dk.  For tender documents please click here.  06/21.  

 




Permalink


Invitation to tender by restricted procedure, deadline 09/03/2021, for a Framework Agreement for in-house consultancy services to Femern A/S technical division. Value of the contract is EUR10 million, excluding VAT. Duration of contract 48 months. For tender documents click here, where offers must be sent. Contact Femern Baelt A/S, att.n Anne Bogh Johansen, Copenhagen V, tel +45 33414449, email ajo@femern.dk.  For further on the tender, please click here.  06/21. 

 




Permalink


 

Periodic indicative notice without call for competition, deadline 17/05/2021, for the TPS (Tunnel Power Supply) contract for the Fehmarnbelt Fixed Link Project. The contract relates to the design, construction and maintenance of the secondary system and the ancillary civil work. For tender documents click here, where tenders must be sent. Value of the contract is EUR 70 million, excluding VAT. Duration of the contract is 125 months. Contact Femern A/S, attn Kirsten Margrethe Christensen, Copenhagen V, tel +45 33414453, email kmc@femern.dk.  For further on TED tender, please click here.  15/21. 

 




Permalink


Femern A / S has pre-qualified the following three consortia 

  • Bravida-Efacec-GE-Consortium: Bravida Danmark A/S (Denmark), EFACEC Engenharia e Sistemas SA (Portugal) and GE Energy Power Conversion GmbH (Germany); 
  • Elecnor SA (Spain); 
  • Siemens-Aarsleff: Siemens Mobility A/S (Denmark) and Aarsleff Rail A/S (Denmark); 

to compete for the task of establishing a large transformer station that will supply the Fehmarn tunnel and the railway between Denmark and Germany with green electricity. 

Femern A / S expects to receive an initial offer from the bidders before the end of 2021 and a final offer in the middle of 2022. Awarding of the contract can then take place in the autumn of 2022 with the start of the contract at the beginning of 2023. Contact Femern A / S, attn Morten Kramer Nielsen email mkn@femern.dk. For further on the shortlisted, please click here. 26/21. 

 




Permalink


Trelleborg Marine & Infrastructure has been awarded the contract to supply its tunnel seals - Gina gaskets, Omega seals, Waterstop seals and clamping systems - to Femern Link Contractors (FLC) for the construction of the 18-km long Fehmarnbelt tunnel, connecting Rodbyhavn in Denmark and Puttgarden in Germany. Constructed from 79 large tunnel elements, each 217 m long, and 10 special elements, the Fehmarnbelt immersed tunnel will comprise a four-lane motorway and two electrified rail tracks. Component supply will begin in 2022 and final deliveries scheduled for end of 2026. Trelleborg’s sealing systems promise a product life expectancy of up to 120 years with little-to-no maintenance. Visit  https://www.trelleborg.com. 39/21.  



Permalink


Periodic indicative notice for a Tunnel Track & Catenary Contract for the Fehmarnbelt Fixed Link Project. The contract relates to design, build (installation), testing and commissioning of the Tunnel Track & Catenary (TTC) systems for the tunnel. Value of the contract is EUR 150 million, excluding VAT. Estimated date of publication of contract notice 14/03/2023.  Contact Femern A/S, attn Jimmie Bollingtoft, Copenhagen, email jbo@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=125518-2022. 11/22. 

Denmark-Copenhagen: Railway construction works

2022/S 048-125518

Periodic indicative notice – utilities

This notice is a periodic indicative notice only

Works

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: Femern A/S
National registration number: 28986564
Postal address: Vester Søgade 10
Town: Copenhagen
NUTS code: DK011 Byen København
Postal code: 1601
Country: Denmark
Contact person: Jimmie Bøllingtoft
E-mail: jbo@femern.dk
Internet address(es):
Main address: www.femern.dk
I.3)Communication
Additional information can be obtained from the abovementioned address
I.6)Main activity
Other activity: Femern A/S' sole activity is the procurement, construction and operation of the fixed link across the Fehmarnbelt and any ancillary activities related to this

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Fehmarnbelt Fixed Link Project: Tunnel Track & Catenary Contract

II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.4)Short description:

The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. This will be an immersed tunnel containing two dual carriageways and a twin-track railway. It will traverse the 19 km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany.

Femern A/S requires design, build (installation), testing and commissioning of the Tunnel Track & Catenary (TTC) systems described in section II.2.4). Further, Femern A/S requires maintenance of the systems for a defined period.

II.1.5)Estimated total value
Value excluding VAT: 150 000 000.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.2)Additional CPV code(s)
31214000 Switchgear
34632300 Electrical installations for railways
34940000 Railway equipment
34946000 Railway-track construction materials and supplies
34946100 Railway-track construction materials
34946110 Rails
34946120 Railway materials
34946200 Railway-track construction supplies
45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45234000 Construction work for railways and cable transport systems
45234116 Track construction works
45234160 Catenary's construction works
50000000 Repair and maintenance services
50220000 Repair, maintenance and associated services related to railways and other equipment
50225000 Railway-track maintenance services
71311230 Railway engineering services
71541000 Construction project management services
45221242 Railway tunnel construction work
II.2.3)Place of performance
NUTS code: DEF0 Schleswig-Holstein
NUTS code: DK02 Sjælland
II.2.4)Description of the procurement:

The track works under the TTC Contract is expected to cover:

• slab track in the tunnel and ramps (approximately 2 x 19.7 km)

• ballast (or slab) track from the end of the ramps on the approaches on the Danish and German sides (approximately 2 x 3.5 km on the Danish side and 2 x 2.2 km on the German side)

• crossovers on the Danish side (4 no.) and on the German side (4 no.) including point trace heating system

The overhead catenary system works under the TTC Contract is expected to cover:

• overhead catenary system (conductor rail) in the tunnel (approximately 2 x 18.4 km)

• overhead catenary system on the ramps and approaches on the Danish and German sides (approximately 2 x 4 km on the Danish side and 2 x 3 km om the German side)

• connection to the traction power substation on Lolland

• return current and earthing and bonding systems

• overhead line section panels (OberLeitungsSpannungsPrüfeinrichtung) installed in the rail tubes

• system separations

• switchgear installed in the special elements

• uninterrupted power supply system for OLSPs and SCADA type-systems

• fibre cable

Please note that the description of works mentioned above reflect the Contracting Entity’s current understanding of the available solutions and the Contracting Entity is interested in hearing from potential tenderers whether other technical solutions would be suitable as further laid out in the below mentioned document.

In order for entities to consider whether they could in fact be potential tenderers and in order for such potential tenderers to provide relevant input Femern A/S has prepared a document setting out an invitation to a preliminary market consultation. This document further details the specifics of the contract as well as the input requested and the process that will take place. The document can be found at https://docsend.com/view/xq9f5xh2ndn5u88p (password: Fehmarn8459!belt).

Femern A/S expects potential tenderers to prepare written responses to the questions raised in the invitation prior to the deadline set out therein. Following this Femern A/S will arrange bilateral meetings to discuss the responses to the questions and any further input provided by the potential tenderer. Femern A/S expects to be able to offer such meetings to all genuine potential tenderers, however, Femern A/S respectfully reserves the right to limit participation at its sole discretion in the circumstance where Femern A/S receives more than 8 responses. Femern A/S expects to take into account factors such as the quality of the response and the diversity of the participants when limiting the participation. Femern A/S does not intend to include entities which are not potential tenderers and reserves the right to require evidence of the capability to perform works of the nature required.

Please note that Femern A/S will take responses into consideration even if the potential tenderer is unable to partake in a meeting with Femern A/S (either as a result of Femern A/S limiting participation or as a result of the potential tenderer indicating that it is unable to partake in a meeting).

II.2.14)Additional information

Please note that the date indicated in section II.3 below is only indicative of the earliest possible time a publication of a contract notice could occur.

II.3)Estimated date of publication of contract notice:
14/03/2023

Section IV: Procedure

IV.1)Description
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: yes
IV.2)Administrative information

Section VI: Complementary information

VI.3)Additional information:

The construction of the fixed link across the Fehmarn Belt receives EU funding from the CEF programme under project code 2014-EU-TM-0221-W.

VI.5)Date of dispatch of this notice:



Permalink


The international SICE-Cobra consortium, comprising SICE SA - Sociedad Iberica de Construcciones Electricas (Spain), SICE Tecnologia y Sistemas SA (Spain), Cobra Instalaciones y Servicios SA (Spain) and Moncobra SA (Spain), have secured the around EUR 539.56 million (DKK 4 billion) contract for the Fehmarnbelt tunnel’s electrical and mechanical installations The assignment covers ventilation, lighting and safety systems, and was advertised as a design and build contract. Visit https://femern.com. 12/22. 



Permalink


The Consortium FEMO, including DHI from Hørsholm, BioConsult SH GmbH & Co. KG from Husum, Marilim Gesellschaft fur Gewasseruntersuchung mbH from Schoenkirchen and Orbicon A/S from Høje Taastrup have secured the EUR70.59 million (DKK525 million) contract, excluding VAT, for the extension until 31 December 2029 of the existing framework agreement with Femern A/S on Environmental Advisor. Contact Femern A/S, attn Anne Bøgh Johansen, Copenhagen, email ajo@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=178300-2022. 14/22. 



Permalink

The Joint Venture Sociedad Ibérica de Construccines Eléctricas S.A. from Alcobendas, SICE Tecnología Y Sistemas S.A. from Alcobendas, Cobra Instalaciones Y Servicios S.A. from Madrid and Moncobra S.A. from Madrid have secured the EUR579-03 million TEM (Tunnel Electrical and Mechanical) contract, excluding VAT, for the Fehmarnbelt Fixed Link Project. The contract relates to design, procurement and building/installation of a MEICA (Mechanical, Electrical, Instrumentation, Control and Automation) system for the tunnel. Contact Femern A/S, attn Jonathan Jacobson, Copenhagen V, tel +45 33414453, email info@femern.dk.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=295409-2022.  23/22. 



Permalink

 

Periodic indicative notice for a Tunnel Track & Catenary Contract for the Fehmarnbelt Fixed Link Project. The contract relates to design, build (installation), testing and commissioning of the Tunnel Track & Catenary (TTC) systems for the tunnel. Value of the contract is EUR 200 million, excluding VAT. Estimated date of publication of contract notice 14/03/2023.  Contact Femern A/S, attn Jimmie Bollingtoft, Copenhagen, email jbo@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=632847-2022. 46/22. 

Denmark-Copenhagen: Railway construction works

2022/S 220-632847

Periodic indicative notice – utilities

This notice is a periodic indicative notice only

Works

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: Femern A/S
Postal address: Vester Søgade 10
Town: Copenhagen
NUTS code: DK011 Byen København
Postal code: 1601
Country: Denmark
Contact person: Jimmie Bøllingtoft
E-mail: jbo@femern.dk
Internet address(es):
Main address: www.femern.dk
I.3)Communication
Additional information can be obtained from the abovementioned address
I.6)Main activity
Other activity: Femern A/S' sole activity is the procurement, construction and operation of the fixed link across the Fehmarnbelt and any ancillary activities related to this

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Fehmarnbelt Fixed Link Project: Tunnel Track & Catenary Contract

II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.4)Short description:

The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway. It will traverse the 19 km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany.

Femern A/S requires design, build (installation), testing and commissioning of the Tunnel Track & Catenary (TTC) systems described in section II.2.4). Further, Femern A/S requires maintenance of the systems for a defined period.

II.1.5)Estimated total value
Value excluding VAT: 200 000 000.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.2)Additional CPV code(s)
31214000 Switchgear
34632300 Electrical installations for railways
34940000 Railway equipment
34946000 Railway-track construction materials and supplies
34946100 Railway-track construction materials
34946110 Rails
34946120 Railway materials
34946200 Railway-track construction supplies
45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45234000 Construction work for railways and cable transport systems
45234116 Track construction works
45234160 Catenary's construction works
50000000 Repair and maintenance services
50220000 Repair, maintenance and associated services related to railways and other equipment
50225000 Railway-track maintenance services
71311230 Railway engineering services
71541000 Construction project management services
45221242 Railway tunnel construction work
II.2.3)Place of performance
NUTS code: DEF0 Schleswig-Holstein
NUTS code: DK02 Sjælland
II.2.4)Description of the procurement:

Femern A/S is in the process of preparing the tender material for the Tunnel Track and Catenary (TTC) contract. Previously Femern A/S consulted the market in this regard in a notice (2022/S 048-125518).

This notice serves to:

1) create awareness about the upcoming tender;

2) allow further preparations by interested economic operators; and

3) inform the market about developments made since the previous notice.

The TTC contractor will be responsible for the design, build (installation), testing and commissioning of the TTC systems described below. The TTC contractor will also be responsible for the maintenance of the systems for a defined period.

The track works under the TTC contract is expected to cover track 1) in the tunnel and on the ramps (approx. 2 x 19.7 km), 2) from the end of the ramps on the approaches on the Danish and German sides (approx. 2 x 3.5 km and 2 x 2.2 km) and 3) crossovers on the Danish (4 no.) and German (4 no.) sides including point trace heating system.

The overhead catenary system works under the TTC contract is expected to cover the overhead catenary system 1) in the tunnel (approx. 2 x 18.4 km), 2) on the ramps and approaches on the Danish side (approx. 2 x 4 km) and German side (approx. 2 x 3 km), 3) connection to the traction power substation on Lolland, 4) return current and earthing and bonding systems, 5) overhead line section panels installed in the rail tubes, 6) system separations, 7) switchgear installed in the special elements, 8) uninterrupted power supply system for OLSPs and SCADA type-systems and 9) fibre cable.

The design speed for the railway is 200 km/h.

For the area outside the tunnel Femern A/S is currently preparing to require a ballast track solution but does not expect to be prescriptive about the catenary system outside the tunnel. Femern A/S expects to require that the solution for these two are based on technical solutions already in use (on a TSI approved section) at the time of tender to a speed of at least 200 km/h.

Further, Femern A/S is preparing to require a slab track solution inside the tunnel. Similarly, Femern A/S would require such a solution to be based on a technical solution already in use (on a TSI approved section) at the time of tender (possibly also to a speed of at least 200 km/h). Finally, Femern A/S does not expect to be prescriptive about the type of catenary system inside the tunnel and would not require that the catenary system is based on a technical solution already in use (on a TSI approved section) at the time of tender.

In order to further facilitate the preparations of the interested economic operators Femern A/S can inform that it expects the tender to be executed as a competitive procedure with negotiation with a limited number of prequalified participants. Femern A/S expects that the economic and financial standing that will be required of the applicant over the past 3 financial years will be:

(a) a yearly turnover equivalent to the estimated total value (around EUR 200 million); and

(b) an equity ratio (total equity/total assets) of not less than 15 %.

Femern A/S further expects that there will be requirements regarding technical and professional ability in the form of a portfolio of references related to works completed and handed-over to the customer within the latest 5 years that demonstrates:

(a) experience with construction of a track system in a tunnel of approximately 3 km

(b) experience with construction of a slab track system

Please note that the description above reflects Femern A/S’ current expectations to the future tender procedure, but as Femern A/S is still in the preparation phase, the requirements may be different in the contract notice.

II.2.14)Additional information

The estimated total value stated in section II.1.5) is an overall estimate and could be subject to adjustment prior to release of the contract notice.

Please note that the date indicated in section II.3 below is only indicative of when the publication of a contract notice could occur.

II.3)Estimated date of publication of contract notice:
14/03/2023

Section IV: Procedure

IV.1)Description
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: yes
IV.2)Administrative information

Section VI: Complementary information

VI.3)Additional information:

The construction of the fixed link across the Fehmarn Belt receives EU funding from the CEF programme under project code 2014-EU-TM-0221-W.

VI.5)Date of dispatch of this notice:
10/11/2022



Permalink


Elecnor Servicios Y Proyectos SAU from Madrid secured the EUR 41.74 million TPS (Tunnel Power Supply) contract for the Fehmarnbelt Fixed Link Project. The contract relates to the design, construction and maintenance of the secondary system and the ancillary civil work. Contact Femern A/S, attn Kirsten Margrethe Christensen, Copenhagen V, tel +45 33414453, email kmc@femern.dk.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=727000-2022.  01/23. 



Permalink


Negotiated procedure with prior call for competition, deadline  28/04/2023, for a Tunnel Track & Catenary Contract for the Fehmarnbelt Fixed Link Project. The contract relates to design, build (installation), testing and commissioning of the Tunnel Track & Catenary (TTC) systems for the tunnel. Click here for tender documents and where tenders must be sent.  Value of the contract is EUR 200 million, excluding VAT.  Duration of contract will be 108 months. Contact Femern A/S, attn Kirsten Margrethe Christensen, Copenhagen, tel +45 33414453, email info@femern.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=162771-2023. 12/23. 

 




Permalink