Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Spain

Spain, Valencia - es/105

Tramway

Typsa has been appointed designer of the first phase of Line T2 for €2.9 million, section Xí tiva-Line T4. Line T2 will connect Torrefiel and Orriols, north of Valencia, to the Museum of Sciences and Nazaret in the south, entering a north-south tunnel at Pont de Fusta. Underground stops in the city centre at Torres de Serranos, Plaza Míºsico Lí³pez Chí¡varri and Mercado Central. This stretch will be TBM-driven. Then, the line will carry on until the City Hall in cut-and-cover before reaching Xí tiva. Visit www.typsa.es 33/03.Open call for bids, deadline 23rd September, 2003 for design engineering for 4.3 km-long second phase of Line T2, section Xí tiva-Nazaret. The line will intersect the future central station in Germaní­as and Lines 3/5 in Bailén. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=134832-2003, OJ S 148, or contact Generalitat Valenciana, Valencia, fax +34 963866404. More details in E-News Weekly 19/2003. 33/03.Gestec has secured a EUR1.8 million contract for design engineering for the 4.3 km second phase of Line T2, section Xativa-Nazaret. This section runs underground and at grade and will intersect the future central station in Germanias and Lines 3/5 in Bailen. 19/04.Open call for bids, deadline 6th April, 2006 for construction of section Alicante Street-Ruzafa on tram line T2 South. This section includes a 1.1 km-long 5 m-wide cut-and-cover tunnel, carrying two tracks stacked one over one and built at a depth of -17 metres. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=241783-2005, OJ S 245, or contact with Gestor de la Red de Transporte y de Puertos de la Generalitat (GTP), Valencia, fax +34 963976465 or 963976710. E-mail caraval_jua@gva.es 10/06.Open call for bids, deadline 17th March, 2006 for construction management of section Alicante Street-Ruzafa on tram line T2 South. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=024570-2006, OJ S 22, or contact Gestor de la Red de Transporte y de Puertos de la Generalitat (GTP), Valencia, fax +34 963976710. E-mail caraval_jua@gva.es 10/06.Open call for bids, deadline 10th April, 2006 for construction of section Ruzafa-Hermanos Maristas Avenue on tram line T2 South. This section includes a 1.1 km-long 9 m-wide cut-and-cover tunnel, carrying two parallel tracks and built at a depth of -10 metres. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=04044-2006, OJ S 3, or contact Gestor de la Red de Transporte y de Puertos de la Generalitat (GTP), Valencia, fax +34 963976465 or 963976710. E-mail caraval_jua@gva.es 10/06.Open call for bids, deadline 17th March, 2006 for construction management of section Ruzafa-Hermanos Maristas Avenue on tram line T2 South. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=024567-2006, OJ S 22, or contact Gestor de la Red de Transporte y de Puertos de la Generalitat (GTP), Valencia, fax +34 963976710. E-mail caraval_jua@gva.es 10/06.Tram line T2 South is 5,117 metres in length, whereof 2,222 metres below ground, three underground stations and six stops at grade. Read E-News Weekly 12/2005. 10/06.Ferrovial Agromí¡n and Rover Alcisa bagged a EUR36.6 million contract to build section Alicante Street-Ruzafa on tram line T2 South. This section includes a 1.1 km-long 5 m-wide cut-and-cover tunnel, carrying two tracks stacked one over one and built at a depth of -17 metres. Visit www.ferrovial.es and www.roveralcisa.com 22/06.Acciona Infraestructuras and Torrescamara pocketed a EUR24.2 million contract to build section Ruzafa-Hermanos Maristas Avenue on tram line T2 South. This section includes a 1.1 km-long 9 m-wide cut-and-cover tunnel, carrying two parallel tracks and built at a depth of -10 metres. Visit www.acciona-infraestructuras.es 22/06.Initec Infraestructuras and Comaypa have signed a EUR1 million deal for construction management of section Ruzafa-Hermanos Maristas Avenue on tram line T2 South. Read E-News Weekly 12/2005. Visit www.initec.es 42/06.Agrupacion Mediterranea de Ingenieria and Prointec have concluded a EUR1.2 million contract for construction management of section Alicante Street-Ruzafa on tram line T2 South. Read E-News Weekly 12/2005. Visit www.aminsa.com and www.prointec.es 42/06.



Permalink


Open invitation to tender, deadline 09/06/2023, for Phase 1 of renovation works and expansion of railway infrastructures of the Metrovalencia network. The Metrovalencia (F.G.V.) network is made up of 10 lines, 4 of which 4 are surface tramways throughout their entire route (lines 4, 6, 8 and 10) and 6 partially underground (lines 1, 2, 3, 5, 7 and 9). The set of underground routes has a total length of approximately 27 km.  

The contract involves Phase 1 (Sections 3 and 4) and it’s composed by 2 lots. 

  • Lot 1: Lines 5 and 7 between Alameda and Marítim Stations, corresponding to Section 3 of the Contract "Renovation and Expansion of Railway Infrastructures of the Metrovalencia Network and Railway Assets . Lot 1 affects the tunnel sections between the stations of Alameda, Aragon, Amistat, Ayora and Marítim, about 2.7 km long. 
  • Lot 2: Lines 3 and 9  between Airport Station and Alboraia Peris Arago, corresponding to Section 4 of the "Renovation" Contract and Expansion of Railway Infrastructures of the Metrovalencia network and Railway Assets. Lot 2 affects the tunnel sections between the stations of Alboraia Peris Arago, Alboraia Palmaret, Machado, Benimaclet, Facultats Manuel Broseta, Alameda, Colon, Xativa, Angel Gimera, Avinguda del Cid, Nou d'Octubre, Mislata, Mislata Almassil, Faitanar, Quart de Poblet, Salt de l'Aigua, Manises, Roses and Airport, almost 15 km long. 

For tender documents click here. Value of contract is EUR27.02 million, excluding VAT. Duration of the contract 14 months. Contact Gerencia de Ferrocarrils de la Generalitat Valenciana, Valencia, tel +034 961924137, fax +034 961924143, email contratacion@fgv.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=284429-2023. Ref.n. 23/022. 20/23. 

 




Permalink

Spain, Madrid - es/104

M-30 Highway Upgrading

Extensive tunnelling (26 km) is planned to ease congestion on M-30 ring road in Madrid. A total of seven EPB shields will be needed. Six of these would be 15 to 16 m-diameter machines to drive three-lane tunnels namely the east and west tunnels, 3.5 km each, near the Manzanares river; the north and south tunnels, 4 km each, to bypass Avenida de la Ilustracií³n; and the north and south tunnels to bypass the south of the city, 3 km each. The seventh EPB shield would be a around 11 to 12 m in diameter to drive a two-lane 5 km tunnel to connect Avenida de la Ilustracií³n to N-I. Read E-News Weekly 23/2003. 32/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the undergrounding of road N-V, section between the N-V interchange and M-30 in Sepulveda Street. Tender budget: €1.1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=139594-2003, OJ S 153, or contact Ayuntamiento de Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the undergrounding of the M-30 highway and N-V trunk road in Madrid. Tender value: €1.55 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140603-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the right carriageway on the connection between Paseo Santa Marí­a de la Cabeza and trunk road N-III in Madrid on the M-30 south bypass. Tender value: €997,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140539-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the left carriageway on the connection between Paseo Santa Marí­a de la Cabeza and trunk road N-III in Madrid on the M-30 south bypass. Tender budget: €997,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140546-2003, OJ S 154, or contact Ayuntamiento de Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the upgrading of the M-30, section from N-V to Castilla Road, west tunnel. Tender budget: €946,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140547-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing designing the upgrading of the M-30, section from N-V to Castilla Road, east tunnel. Tender budget: €976,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140619-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the new tunel in Pí­o XII Avenue. Tender budget: €1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140544-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the Ilustracií³n Avenue bypass, south tunnel. Tender budget: €1.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140543-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the Ilustracií³n Avenue bypass, north tunnel. Tender budget: €1.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140538-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the undergrounding of section from Portugal Avenue to San Vicente roundabout. Tender budget: €1.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=140535-2003, OJ S 154, or contact City Hall, Madrid, tel. +34 915883570. 37/03.Open call for bids, deadline 24th September, 2003 for consulting and technical assistance for designing the extension to the O'Donnell Street tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=143623-2003, OJ S 157, or contact City Hall, Madrid, tel. +34 915883570. More information in E-News Weekly 23/2003. 37/03.Open invitation to tender, deadline 12th November, 2003, for design of specifications, tender documents, work supervision and supply of TBMs to be used for the modernisation of the M-30 motorway in Madrid. Six EPB shield machines will be necessary. Tender value: €241.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=168631-2003, OJ S 187, or contact City of Madrid, tel. +34 915883570. 41/03.Open call for bids, deadline 12th November, 2003 for design of the connection between Avenida de la Ilustracií³n and Avenida de Ventisquero de la Condesa, with a tunnel under Cardenal Herrera Oria and Fermí­n Caballero avenues. This is part of the upgrading of the M-30. Tender budget: €553,450. Contact http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=168628-2003, OJ S 187, or contact City of Madrid, tel. 34 915883570. 42/03.Open call for bids, deadline 12th November, 2003 for design of connection between the M-30 and N-III (motorway to Valencia). The project will consist in the building of two tunnels, one northbound to connect the Valencia motorway with the M-30 and one southbound. The tunnel will cross Plaza de Conde de Casal and Hermanos Ferní¡ndez Shaw street, which will reduce traffic jams in the area. Tender budget: €837,930. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=168576-2003, OJ S 187, or contact City of Madrid, tel. 34 915883570. 42/03.Two preinformation notices for construction of two tunnels (2,700 m and 2,800 m), and their cross passages, between Praga Bridge and the N-III connection to Valencia. Each tunnel with three 3.5 m-wide lanes plus pavements. Excavation with EPB shields, 15.2 m in diameter. Total thrust: 30,000 tons (300,000 kN). Cutterhead torque: 12,500 mt (125,000 kNm) and minimum installed power of 10,000 kW. Machine with one or two screw conveyors. Double segment erector capable to install the ring in 15 minutes. Estimated cost: €120 to €170 million for each tunnel. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=193992-2003, OJ S 216, and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194804-2003, OJ S 217, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Preinformation notice for construction of a 3.5 km tunnel for two carriageways, three 3.5 m-wide lanes for each carriageway, for putting underground the N-V between Aluche and Sepulveda Street. Cut-and-cover method. Estimated cost: €212 to €250 million. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194805-2003, OJ S 217, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Two preinformation notices for construction of two tunnels, 4.5 km each, and their cross passages, to link Maella Roundabout and La Paloma Interchange. Each tunnel with three 3.5 m-wide lanes plus pavements. Excavation with EPB shields, 15.2 m in diameter. Total thrust: 30,000 tons (300,000 kN). Cutterhead torque: 12,500 mt (125,000 kNm) and minimum installed power of 10,000 kW. Machine with one or two screw conveyors. Double segment erector capable to install the ring in 15 minutes. Estimated cost: €210 to €270 million for each tunnel. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=193995-2003 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=193997-2003, OJ S 216, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Preinformation notice for construction of a 3 km tunnel for two carriageways, five 3.5 m-wide lanes for each carriageway, for putting underground the M-30 between Toledo Bridge and the South Interchange. Cut-and-cover method. Estimated cost: €325 to €350 million. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=193996-2003, OJ S 216, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Preinformation notice for construction of a 1.5 km tunnel for two carriageways, three 3.5 m-wide lanes for each carriageway, for putting underground the N-V between Sepulveda Street and Toledo Bridge. Cut-and-cover method. Estimated cost: €225 to €260 million. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194005-2003, OJ S 216, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Preinformation notice for construction of two tunnels, 3.4 km each, for putting underground the M-30 between El Rey Bridge and Toledo Bridge. Carriageway to accomodate five 3.5 m-wide lanes. Estimated cost: €300 to €350 million. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194010-2003, OJ S 216, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Preinformation notice for construction of two tunnels, 2.5 km each, and their cross passages, to connect Ilustracií³n Avenue with the N-I. Each tunnel with three 3.5 m-wide lanes plus pavements. Excavation with EPB shields, 15.2 m in diameter. Total thrust: 30,000 tons (300,000 kN). Cutterhead torque: 12,500 mt (125,000 kNm) and minimum installed power of 10,000 kW. Machine with one or two screw conveyors. Double segment erector capable to install the ring in 15 minutes. Estimated cost: €200 to €250 million. Work start in June 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194011-2003, OJ S 216, or contact City of Madrid, tel. +34 915883439 or 3396. 47/03.Preinformation notice for 800 m extension to the O'Donnell tunnel in Madrid under Doctor Esquerdo Street, with two 3 m-wide lanes plus pavements. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220541-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for sinking underground Avenida de Portugal up to San Vicente Roundabout (1,750 m). This will ease connection between Casa de Campo and Distrito de Latina. Access to the San Vicente Roundabout will be in tunnel and tunnels will also allow for coaches to access to the Prí­ncipe Pí­o Interchange. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220556-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for upgrading the connection between the M-30 (La Paloma Interchange) and Pí­o XII Street and Avenida de Burgos. A 800 m tunnel will be constructed to link up Paseo de la Castellana - Chamartí­n to M-30 and slip roads to Avenida de Burgos - Pí­o XII. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220559-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for construction of a 1,100 m two-way cut-and-cover tunnel beneath San Aquilino Street up to the vicinity of the Ciudad Deportiva del Real Madrid. From there, the tunnel will separate in two branches (one for each direction) to connect with the bus lane of Colmenar Road and N-I. The tunnel of each branch will be TBM-driven and cross-connected. Their cross section will be sufficient to permit traffic of two coaches thereby avoiding traffic interruption in case of breakdown in one of them. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220586-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for upgrading the interchange between N-100 - O'Donnell and M-30. Two underpasses will be constructed, the first being 720 m in length under the M-30 north and the second, 920 m in length, under the M-30 south. Each will accomodate two 3.5 m-wide lanes plus pavements. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220588-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for upgrading the interchange between M-30 and Avenida de América / N-II. Two underpasses will be constructed to connect N-II / M-30 south and M-30 north / N-II. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220589-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for construction of an underpass under Plaza José Marí­a Soler to channel traffic from M-30 north, M-30 south, Gran Ví­a de Hortaleza and Costa Rica. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220590-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for construction of a new 900 m-long three-lane cut-and-cover tunnel to connect Paseo de la Castellana with Pí­o XII Street. The existing tunnel will be renovated for one-way traffic. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220592-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for construction of a subterranean distributor at Ciudad Deportiva del Real Madrid. Cut-and-cover method. There will be two traffic levels and four lanes. Length: 1.2 km, depth: 20 m. The new distributor will connect with the existing roadway and the new one, making possible access by public transport and improving north/south and east/west traffic. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220593-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for connecting Avenida de la Ilustracií³n with Ventisquero de la Condesa Street. The project requires the construction of a connection between El Pilar and M-40 through Ventisquero de la Condesa Street, by means of a 600 m tunnel beneath Avenida del Cardenal Herrera Oria. Three underground car parks will also be built to replace the existing ones that will be affected by the works. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220594-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Preinformation notice for construction of two underpasses under the M-30 to connect directly M-30 north with N-III and N-III with M-30 south. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220595-2003, OJ S 248, or contact City of Madrid, fax +34 915883396. 02/04.Open invitation to tender, deadline 19th July, 2004 for extension of the O'Donnell tunnel. The extension of the O'Donnell tunnel will span 783 m. From late 2005 or early 2006, the lengthened tunnel will start from Menendez Pelayo street, while it now starts in Puerta de la Maternidad, to cross under Doctor Esquerdo up to Piruli. Tender budget: EUR21.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=100261-2004, OJ S 119, or contact City Hall, Madrid, fax +34 915883571 or tel. +34 915883570. Subscribe to E-News Weekly 26/2004. 27/04.Open invitation to tender, deadline 30th July, 2004 for work inspection, monitoring and health and safety coordination as part of the O'Donnell tunnel extension. Tender budget: EUR25,400. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=096846-2004, OJ S 115, or contact City Hall, Madrid, tel. +34 915883475 or 915883570. Subscribe to E-News Weekly 26/2004. 27/04.Open invitation to tender, deadline 19th July, 2004 for construction of a new tunnel in Pio XII Avenue. The new 823 m-long three-lane tunnel will run parallel to the existing Pio XII tunnel. Its cost amounts to EUR37 million. Time frame for construction: 30 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=100267-2004, OJ S 119, or contact City Hall, Madrid, fax +34 915883571 or tel. +34 915883653. Subscribe to E-News Weekly 26/2004. 27/04.Open call for bids, deadline 23rd July, 2004 for construction of the right carriageway on the Paseo de Santa Maria de la Cabeza / N-III connection, corresponding to the south tunnel of the M-30 south bypass. This 8,344 m section requires 7,212 m of three-lane bored tunnel and 632 m of cut-and-cover tunnel. Tender value: EUR370 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=103872-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 23rd July, 2004 for construction of the left carriageway on the Paseo de Santa Maria de la Cabeza / N-III connection, corresponding to the north tunnel of the M-30 south bypass. This 8,344 m section requires 7,212 m of three-lane bored tunnel and 632 m of cut-and-cover tunnel. Tender value: EUR292.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=103849-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 12th August, 2004 for quality control during construction of the left carriageway on the Paseo de Santa Maria de la Cabeza / N-III connection, corresponding to the north tunnel of the M-30 south bypass. Tender value: EUR2.9 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=104964-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 23rd July, 2004 for construction of an interchange between La Paloma and Pio XII Street / Avenida de Burgos. This 5,508 m section requires a 1,546 m cut-and-cover tunnel and 175 m with conventional means. Tender value: EUR47.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=103855-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 12th August, 2004 for quality control throughout construction of an interchange between La Paloma and Pio XII Street / Avenida de Burgos. Tender value: EUR478,450. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=104988-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 23rd July, 2004 for upgrading of the interchange between the M-30 and N-III. This 4.8 km section requires a 1.4 km cut-and-cover tunnel and 430 m with conventional means. Tender value: EUR161.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=103833-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 12th August, 2004 for quality control during upgrading of the interchange between the M-30 and N-III. Tender value: EUR1.6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=104963-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 23rd July, 2004 for upgrading of the interchange between Costa Rica Street and Plaza Jose Maria Soler and the slip roads to the M-30. This 2,078 m section requires 892 m of cut-and-cover tunnel. Tender value: EUR23.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=103850-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.Open call for bids, deadline 12th August, 2004 for quality control throughout the upgrading works of the Costa Rica Street and Plaza Jose Maria Soler and the slip roads to the M-30. Tender value: EUR232,750. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=105021-2004, OJ S 123, or contact Empresa Municipal Madrid Calle 30, Madrid, fax +34 91 5883139. 28/04.More tenders in E-News Weekly 28/2004. Also read E-News Weekly 23/2003. 28/04.Open invitation to tender, deadline 17th August, 2004 for inspection, monitoring and health and safety coordination during construction of the interchanges between M-30 and Avenida de América / A-2 and between N-100-O'Donnell and M-30. Two underpasses will be constructed to connect N-II / M-30 south and M-30 north / N-II. The interchange between N-100-O'Donnell and M-30 requires two underpasses, 720 m under the M-30 north and 920 m under the M-30 south, each accomodating two 3.5 m-wide lanes. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107776-2004, OJ S 127, or contact Madrid Calle 30, Madrid, fax +34 915883139. 29/04.Open call for bids, deadline 17th August, 2004 for inspection, monitoring and health and safety coordination during construction of the left carriageway on the Paseo de Santa Maria de la Cabeza / M-30 connection, corresponding to the north tunnel of the south bypass. This 8,344 m section requires 7,212 m of three-lane bored tunnel and 632 m of cut-and-cover tunnel, divided in two separate tubes. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107697-2004, OJ S 127, or contact Madrid Calle 30, Madrid, fax +34 91 5883139. 29/04.Open call for bids, deadline 17th August, 2004 for inspection, monitoring and health and safety coordination during construction of the interchange between the M-30 and N-III. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107672-2004, OJ S 127, or contact Madrid Calle 30, Madrid, fax +34 91 5883139. 29/04.Open call for bids, deadline 17th August, 2004 for inspection, monitoring and health and safety coordination during construction of an interchange between La Paloma and Pio XII Street / Avenida de Burgos and upgrading of the interchange between Costa Rica Street and Plaza Jose Maria Soler and the slip roads to the M-30. The first scheme is 5,508 m in length and requires a 1,546 m cut-and-cover tunnel and 175 m with conventional means. The second is a 2,078 m section including a 892 m of cut-and-cover tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107788-2004, OJ S 127, or contact Madrid Calle 30, Madrid, fax +34 91 5883139. 29/04.Open call for bids, deadline 12th August, 2004 for quality control during construction of the right carriageway on the Paseo de Santa Maria de la Cabeza / N-III connection, corresponding to the south tunnel of the M-30 south bypass. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=108659-2004, OJ S 128, or contact Madrid Calle 30, Madrid, fax +34 91 5883139. 29/04.Open call for bids, deadline 17th August, 2004 for inspection, monitoring and health and safety coordination during construction of the right carriageway on the Paseo de Santa Maria de la Cabeza / M-30 connection, corresponding to the south tunnel of the south bypass. This 8,344 m section requires 7,212 m of three-lane bored tunnel and 632 m of cut-and-cover tunnel, divided in two separate tubes. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=117419-2004, OJ S 137, or contact Madrid Calle 30, Madrid, fax +34 915883139. 31-32/04.Open call for bids, deadline 20th September, 2004 for inspection, monitoring and health and safety coordination during construction of the connection between Tetuan district and the M-30, section Sor Angela de la Cruz-Marques de Viana, including a 1.284 m tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=131107-2004, OJ S 151, or contact City of Madrid, Madrid, tel. +34 915883475 or 3653. 35/04.Open call for bids, deadline 20th September, 2004 for inspection, monitoring and health and safety coordination during construction of a new 823 m tunnel in Pio XII Avenue. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=131101-2004, OJ S 151, or contact City of Madrid, Madrid, tel. +34 915883475 or 3653. 35/04.Municipal agency Madrid Calle 30 has awarded to Necso and Ferrovial Agroman the construction of the north tunnel on the south bypass. The contract is worth EUR331.4 million. Visit www.necso.es and www.ferrovial.es 37/04.The south tunnel on the south bypass will be constructed by a JV beween FCC and ACS Dragados for EUR410.3 million. Visit www.fcc.es and www.grupoacs.com 37/04.The south bypass is a three-lane infrastructure totalling 8,344 m divided in two tunnels, of which 7,212 m to be built by 15 m-diameter TBMs and 632 m in cut-and-cover. Sinking of the shafts for the TBMs starts immediately. Construction will last 30 months. Both tunnels, one in each direction, of the so-called south bypass, will allow drivers to avoid the A-3 connection. 37/04.Sacyr Vallehermoso will build for EUR170.7 million and in 24 months the improvements of the connection to the A-3. This is a 4.8 km section, whereof 1.4 km in cut-and-cover and 430 m using conventional means. Visit www.gruposyv.com 37/04.Corsan-Corviam is to improve for EUR50 million La Paloma Interchange. The 5,508 m section requires to excavate 1,546 m in cut-and-cover and 175 m using conventional means. Visit www.corsan-corviam.es 37/04.Another JV set up by Construcciones Sando and Ploder will build the connections to Costa Rica and Jose Maria Soler in 14 months at a cost of EUR24.3 million. This section is 2,078 m in length and includes 892 m of cut-and-cover tunnel. Visit www.sando.net and www.ploder.es 37/04.Aldesa Construcciones has been selected to modernise in 14.5 months the connection with Avenida de América for EUR23 million. Two underpasses are needed to link up the N-II with the M-30 south and the M-30 north with the N-II. Visit www.aldesaconstrucciones.es 37/04.Construction is to start simultaneously on all the sections from September 2004 to conclude between November 2005 and spring 2007. Visit www.urbanismo.munimadrid.es/ 37/04.Comsa will build the extension of the O'Donnell tunnel in Madrid, for EUR25.3 million and a time frame of 18 months. The existing O'Donnell avoids to cross at grade Doctor Esquerdo street and is one of the main ways to get out of Madrid. The existing tunnel, 500 m in length, will be lengthened to 1.3 km and its new entrance will be located near Retiro Park. The cut-and-cover method will be used. Visit www.comsa.com 42/04.Open call for tenders, deadline 9th December, 2004 for construction of a 2 x 700 m tunnel linking Ilustracion and Ventisquero de la Condesa avenues. Each bore will carry two 3.5 m-wide lanes. Cut-and-cover and Belgian tunnelling methods. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=187466-2004, OJ S 218, or contact Ayuntamiento de Madrid, Madrid, fax +34 915883571. 47/04.Open call for tenders, deadline 4th January, 2005 for construction of a tunnel with entrances and exits in Embajadores Street, El Planetario Avenue and the M-30 / M-40 bypass to permit direct connection with the A-4 and all M-40's movements. In addition, there are two junctions (entry and exit) to link the M-30 with the south end of Embajadores Street. The total length is 5.8 km, whereof 2,460 m of cut-and-cover tunnel. Estimated cost: EUR143.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=203999-2004, OJ S 237, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. Subscribe to E-News Weekly 47/2004. 51-52/04.Open call for tenders, deadline 19th January, 2005 for inspection, monitoring and safety and health coordination throughout construction of the connection between Embajadores Street and the M-40. Estimated cost: EUR2.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=203301-2004, OJ S 236, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es 51-52/04.Open call for tenders, deadline 19th January, 2005 for quality control throughout construction of the connection between Embajadores Street and the M-40. Estimated cost: EUR1.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=203312-2004, OJ S 236, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es 51-52/04.Open call for tenders, deadline 9th March, 2005 for sinking underground the Rey Bridge-Portugal Avenue interchange between Paseo del Marques de Monistrol and Segovia Bridge. The northbound inner carriageway is 2,887.5 m in length while the southbound outer carriageway has a length of 2,910.6 m. It is a cut-and-cover tunnel. Estimated cost: EUR403.7 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=014886-2005, OJ S 16, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. Also visit www.madridcamina.org/GruposTrabajo/M-30/Proyectos/Monistrol-Pte%20Segovia/Monistrol-Pte%20Segovia-Memoria.pdf to read a technical report on the project.Open call for tenders, deadline 9th March, 2005 for sinking underground the M-30 between Segovia Bridge and San Isidro Bridge (2.5 km). The route totals 5,797.9 m, whereof 2,887.5 m for the inner carriageway and 2,910.4 m for the outer carriageway. Also a 622.5 m stretch of the A-5 will be sunk underground. It is a cut-and-cover tunnel. Estimated cost: EUR264.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=014888-2005, OJ S 16, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. Also visit www.madridcamina.org/GruposTrabajo/M-30/Proyectos/PteSegovia-SanIsidro/Pte%20segovia-San%20Isidro-Memoria.pdf to read a technical report on the project. 05/05.Open call for tenders, deadline 14th March, 2005 for inspection, monitoring and safety and health coordination during construction of the M-30 cut-and-cover tunnel between Segovia Bridge and San Isidro Bridge (2.5 km). Estimated cost: EUR4.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=018719-2005, OJ S 19, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. 05/05.Open call for tenders, deadline 9th March, 2005 for sinking underground the M-30 between San Isidro Bridge and Praga Bridge. The inner carriageway spans 1,404.76 m while the outer carriageway spans 1,397.36 m. It is a cut-and-cover tunnel. Estimated cost: EUR242.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=014894-2005, OJ S 16, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. Also visit www.madridcamina.org/GruposTrabajo/M-30/Proyectos/San%20Isidro-Praga/San%20Isidro-Praga-Memoria.pdf to read a technical report on the project. 05/05.Open call for tenders, deadline 9th March, 2005 for sinking underground the M-30 between Praga Bridge and the south interchange. The inner carriageway is 1,940.73 m long and the outer carriageway is 1,914.50 m long. It is a cut-and-cover tunnel. Estimated cost: EUR246.7 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=014885-2005, OJ S 16, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. Also visit www.madridcamina.org/GruposTrabajo/M-30/Proyectos/Pte%20Praga-Nudo%20Sur/Pte%20Praga-NudoSur-Memoria.pdf to read a technical report on the project. 05/05.Open call for tenders, deadline 9th March, 2005 for sinking underground Portugal Avenue between Paseo de Extremadura and the M-30. It is a 1,305 m cut-and-cover tunnel to carry two carriageways, each with four 3.5 m-wide lanes, 0.75 m-wide shoulders and 1 m-wide pavements. The three-lane access ramps to the cut-and-cover tunnel also carry a single-lane exit tunnel to Parque de Atracciones and Casa de Campo (642.3 m) and an entrance tunnel from Paseo de Extremadura and downtown Madrid (490.8 m). Estimated cost: EUR176.9 million. E-mail madridcalle30juridic@munimadrid.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=014890-2005, OJ S 16, or contact Madrid Calle 30, Madrid, fax +34 917213265. Also visit www.madridcamina.org/GruposTrabajo/M-30/Proyectos/Avda%20Portugal/Avda%20portugal-Memoria.pdf to read a technical report on the project. 05/05.Open call for tenders, deadline 14th March, 2005 for inspection, monitoring and safety and health coordination during construction of the Portugal Avenue cut-and-cover tunnel between Paseo de Extremadura and the M-30. Estimated cost: EUR3.6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=018716-2005, OJ S 19, or contact Madrid Calle 30, Madrid, fax +34 917213265. E-mail madridcalle30juridic@munimadrid.es. 05/05.Open call for bids, deadline 11th April, 2005 for construction of the Ciudad Deportiva underground distributor. It is an undergound distributor ring under the former sport precinct of the Real Madrid, which consists of a rectangular road link, approximately 1,100 m in length, with three traffic lanes, as well as a lane to access to the future car parks. This ring will include five accesses to channel traffic from the M-30 west and south, the M-607 to Colmenar, Sinesio Delgado street, Monforte de Lemos and Pio XII avenues, the north and south sectors of Paseo de la Castellana, the A-1 Madrid-Burgos and the M-11. The project also includes a tunnel specially designed to channel public transport traffic with the A-1 and M-607. This tunnel will carry two lanes, one for each direction, running under Monforte de Lemos and Sinesio Delgado until Paseo de la Castellana, where it will branch off in two separate tunnels, one towards Plaza de Castilla and the other to Chamartin station. Construction will presumably commence in the middle of the year and last 30 months. Tender estimate: EUR106.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=037270-2005, OJ S 39, or contact City of Madrid, tel. +34 915883570 / 71 or 915883475. 09/05.Geoteyco and Eurocontrol secured a EUR2.8 million contract for quality control throughout construction of the right carriageway on the Paseo de Santa Maria de la Cabeza / N-III connection, corresponding to the south tunnel of the M-30 south bypass. Visit www.geoteyco.es and www.eurocontrol.es 10/05.A EUR3.5 million contract has been awarded to Intemac and Ginprosa for inspection, monitoring and health and safety coordination during construction of the left carriageway on the Paseo de Santa Maria de la Cabeza / M-30 connection, corresponding to the north tunnel of the south bypass. Visit www.intemac.es 10/05.Eptisa and Euroestudios secured a EUR2.4 million contract for quality control during construction of the left carriageway on the Paseo de Santa Maria de la Cabeza / N-III connection, corresponding to the north tunnel of the M-30 south bypass. Visit www.eptisainternacional.es and www.euroestudios.es 10/05.Aepo and Iberinsa secured a EUR3.3 million contract for inspection, monitoring and health and safety coordination during construction of the left carriageway on the Paseo de Santa Maria de la Cabeza / M-30 connection, corresponding to the south tunnel of the south bypass. Visit www.aepo.es and www.iberinsa.es 10/05.Euroconsult secured a EUR1.3 million contract for quality control during construction of the interchange between the M-30 and N-III. Visit www.euroconsult.es 10/05.Typsa and Ausurinsa secured a EUR2.4 million for inspection, monitoring and health and safety coordination during construction of the interchange between the M-30 and N-III. Visit www.typsa.es and www.asurinsa.com 10/05.Eurocontrol and Icaes secured a EUR185,500 for quality control throughout the upgrading works of the Costa Rica Street and Plaza Jose Maria Soler and the slip roads to the M-30. Visit www.eurocontrol.es and www.icaes.es 10/05.Inocsa secured a EUR1.9 million for inspection, monitoring and health and safety coordination during construction of an interchange between La Paloma and Pio XII Street / Avenida de Burgos and upgrading of the interchange between Costa Rica Street and Plaza Jose Maria Soler and the slip roads to the M-30. Visit www.inocsa.es 10/05.Proser secured a EUR1.7 million contract for inspection, monitoring and health and safety coordination during construction of the interchange between M-30 and Avenida de America / A-2 and between N-100-O'Donnell and M-30. Visit www.proser.es 10/05.Geocisa secured a EUR421,000 contract for quality control throughout construction of an interchange between La Paloma and Pio XII Street / Avenida de Burgos. Visit www.geocisa.com 10/05.Open call for bids, deadline 28th April, 2005 for inspection, monitoring as well as health and safety coordination during construction of the Ciudad Deportiva underground distributor. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=049285-2005, OJ S 51, or contact Ayuntamiento de Madrid, Madrid, tel. +34 915883475 or 915883570. Click es/104. 12/05.The City of Madrid has awarded to Sacyr a 24-month contract to build the tunnel which will connect Tetuan district with the M-30, for EUR69.15 million. The 1.35 km tunnel will start at Sor Angela de la Sor street, at the intersection between Infante Mercedes and Bravo Murillo streets to then cross the latter at great depth to avoid affecting Line 1 of the metro. Then, the tunnel passes beneath Marques de Vina street and Agustin Rodriguez Sahagun Park to end at the crossroads with Camino del Chorrillo. It is a 16 m-wide tunnel to be built using slurry walls. In addition to the tunnel, the contract also includes the construction of three car parks, with decks above or below the new roadway. Visit www.gruposyv.com 13/05.The City of Madrid has shared between six contractors contracts worth EUR1,245 million to put underground the six kilometres of the west section of the M-30 and 1.3 km on Avenida de Portugal. Work will commence in April and last 24 months.Sacyr secured a EUR166.3 million for the undergrounding of Avenida de Portugal between Paseo de Extremadura and the M-30. A 1,305 m-long cut-and-cover tunnel for a dual carriageway, a single-lane exit tunnel to Parque de Atracciones and Casa de Campo (642.3 m) and an entrance tunnel from Paseo de Extremadura and downtown Madrid (490.8 m) will be built. Visit www.sacyr.com 14/05.Dragados will underground the Rey Bridge-Avenida de Portugal interchange between Paseo del Marques de Monistrol and Segovia Bridge. The northbound inner carriageway is 2,887.5 m in length while the southbound outer carriageway has a length of 2,910.6 m. The contract is worth EUR371.7 million. Visit www.grupoacs.com 14/05.Ferrovial-Agroman and Compania de Obras Castillejos will underground the M-30 between Segovia Bridge and San Isidro Bridge (2.5 km). The route totals 5,797.9 m, whereof 2,887.5 m for the inner carriageway and 2,910.4 m for the outer carriageway. Also a 622.5 m stretch of the A-5 will be sunk underground. The contract totals EUR247.3 million. Visit www.ferrovial.com and www.madridcamina.org/GruposTrabajo/M-30/Proyectos/PteSegovia-SanIsidro/Pte%20segovia-San%20Isidro-Memoria.pdf 14/05.Necso will take underground the M-30 between San Isidro Bridge and Praga Bridge. The inner carriageway spans 1,404.76 m while the outer carriageway spans 1,397.36 m. The length of the entrance and exit interchanges is 3,560.72 m. The dualling of the main tunnel under Toledo Bridge is 955.97 m. Contract value: EUR227.8 million. Visit www.necso.es and www.madridcamina.org/GruposTrabajo/M-30/Proyectos/San%20Isidro-Praga/San%20Isidro-Praga-Memoria.pdf 14/05.FCC will sink underground the M-30 between Praga Bridge and the south interchange. The inner carriageway is 1,940.73 m long and the outer carriageway is 1,914.50 m long. The length of the entrance and exit interchanges is 3,795 m. The dualling of the main tunnels for integration in the south bypass is 1,182 m. Contract value: EUR231.8 million. Visit www.fcc.es and www.madridcamina.org/GruposTrabajo/M-30/Proyectos/Pte%20Praga-Nudo%20Sur/Pte%20Praga-NudoSur-Memoria.pdf 14/05.The City of Madrid has awarded to OHL the construction of a traffic disbributor tunnel under the four towers under construction on the site of what was before the Real Madrid sporting area. The project is budgeted at EUR114.2 million. OHL will build in 30 months the main tunnel, which will consist of a rectangle connected to 12 secondary tunnels for entries, exits and public transport usage. Five entries are planned, with one more envisaged in the future, and five exits together with a branch for public transport. The main tunnel is 1.1 km in length, with 450 m-long sections on the longest sides of the rectangle, orientated to the north-south direction almost parallel to Paseo de la Castellana. They will carry three lanes and a merging lane while the two shortest sides of this rectangle road will accommodate a unique lane. In addition, a four-lane perpendicular carriageway will cross the distributor (two lanes per direction), with access to the car park. Visit www.ohl.es 30/05.AEPO, Sener and Iberinsa secured a EUR2.9 million contract for inspection, monitoring and safety and health coordination during construction of the Portugal Avenue cut-and-cover tunnel between Paseo de Extremadura and the M-30. Visit www.aepo.es, www.sener.es and www.iberinsa.es 44/05.Ingenierí­a Bí¡sica and Incoydesa secured a EUR3.4 million contract for inspection, monitoring and safety and health coordination during the undergrounding of the M-30 between Segovia Bridge and San Isidro Bridge (2.5 km). Visit www.incoydesa.com 44/05.



Permalink

Gas Natural Comercializadora SA from Madrid secured the EUR3.29 million contract, excluding VAT, for the supply of electric power in high voltage to the 14 connections of the tunnels of the M-30 ring road of Madrid. Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email MADRIDCALLE30JURIDIC@MC30.ES. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=091751-2018.

Ref.n. 201700015. 11/18.



Permalink

Open invitation to tender, deadline 26.03.2019, for inspection service in the tunnels of the M-30 ring road of Madrid. Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=081583-2019.

Ref.n. 201900003. 08/19.



Permalink

Postponed from 26.03.2019 to 01.04.2019 the deadline of the open invitation to tender for inspection services in the tunnels of the M-30 ring road of Madrid. Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=108559-2019.

Ref.n. 201900003. 11/19.



Permalink

Postponed from 01.04.2019 to 16.04.2019 the deadline of the open invitation to tender for inspection services in the tunnels of the M-30 ring road in Madrid. Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=122958-2019.

Ref.n. 201900003. 14/19.



Permalink


Open invitation to tender, deadline 17/12/2020, for technical assistance and counselling to the security manager of the M-30 tunnels in Madrid. Click here for the tender documents and here  for further information. Value of the contract is  EUR378 160.08, excluding VAT, duration will be 24 months. Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. Ref. n. 202000031. 48/20. 

 



Permalink


Talleres Zitron SA from Gijon secured the EUR211,199.51 contract, excluding VAT, for the supply of dampers for the ventilation system in the tunnels of the M-30 ring road in Madrid (Lot 3). Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. For further information on the tender, please click here. Ref.n. 202000004. 03/21. 

 




Permalink


Exel Industrial SL from Coslada secured the EUR1.24 million contract, excluding VAT, for the supply of inverter at 690 V for the ventilation system in the tunnels of the M-30 ring road in Madrid (Lot 1). Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. For further information on the tender, please click here. Ref.n. 202000004. 03/21. 




Permalink


Open invitation to tender, deadline 26/02/2021, for the upgrading of the of the centralized management system of the tunnels of the M-30 ring road in Madrid. The contract is composed of 2 lots. Value of the contract is EUR12.56 million , excluding VAT. Duration of the contract is 36 months.  Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. For further information on the tender, please click here and here. Ref.n. 202000030. 03/21. 

 




Permalink


The open invitation to tender, deadline 17/12/2020, for technical assistance and counselling to the security manager of the M-30 tunnels in Madrid has been discontinued . Click here for the tender documents and here  for further information. Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. Ref. n. 202000031. 06/21.

 




Permalink


Open invitation to tender, deadline 21/04/2021, for technical assistance for the supervision of the contract for the upgrading of the of the centralized management system of the tunnels of the M-30 ring road in Madrid. Value of the contract is EUR1.30 million, excluding VAT. Duration of the contract is 36 months.  Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. For further information on the tender, please click here and here. Ref.n. 202100002. 09/21. 

 




Permalink


Open invitation to tender, deadline 16/04/2021, for technical assistance and counselling services to the M30 tunnel safety manager. Click here for tender documents and for tender sending. The value of the contract is EUR378,160.08, excluding VAT. Duration of the contract is 24 months.  Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. For further information on the tender, please click here. Ref.n. 202000031bis. 14/21. 

 




Permalink


The Joint Venture Alauda Ingenieria SA - TPF Getinsa Euroestudios SL from Madrid secured the EUR 280.027,54 contract, excluding VAT, for technical assistance and counselling services to the M30 tunnel safety manager. Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=044212-2022. Ref.n. 202000031bis. 04/22. 



Permalink


Open invitation to tender, deadline 22/03/2022, for the supply of 100% renewable electricity for Madrid Calle 30, tunnels included. Click here for tender documents and to send tender applications. The value of the contract is EUR 14.8 million, excluding VAT. Duration of the contract is 12 months.  Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=097458-2022. Ref.n. 202200009. 08/22. 

 

Spain-Madrid: Electricity

2022/S 038-097458

Contract notice

Supplies

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Madrid Calle 30, S.A.
National registration number: A83981571
Postal address: Méndez Álvaro, 95
Town: Madrid
NUTS code: ES300 Madrid
Postal code: 28053
Country: Spain
Contact person: Madrid Calle 30, S.A.
E-mail: madridcalle30juridic@mc30.es
Telephone: +34 915391236
Fax: +34 915309588
Internet address(es):
Main address: http://www.mc30.es
Address of the buyer profile: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=UPDDKeGhpcwQK2TEfXGy%2BA%3D%3D
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Suministro de energía eléctrica 100% renovable para Madrid Calle 30.

Reference number: 202200009
II.1.2)Main CPV code
09310000 Electricity
II.1.3)Type of contract
Supplies
II.1.5)Estimated total value
Value excluding VAT: 14 800 000.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ES300 Madrid
II.2.6)Estimated value
Value excluding VAT: 14 800 000.00 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 12
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 22/03/2022
Local time: 12:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Spanish

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
18/02/2022



Permalink

  

Open invitation to tender, deadline 21/06/2022, for technical assistance for the surveillance of the renovation work of the exterior lighting of Madrid Calle 30, tunnels included. Click here for tender documents and to send tender applications. The value of the contract is EUR713,676.32, excluding VAT. Duration of the contract is 20 months.  Contact Madrid Calle 30 SA, Madrid, tel +34 915391236, fax +34 915309588, email madridcalle30juridic@mc30.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=280099-2022. Ref.n. 202200022. 21/22. 

  



Permalink

Spain, Barcelona - es/103

Metro

Open call for bids, deadline 3rd September, 2003 for technical assistance for the design of new Line 12 Castelldefels-Sant Boi de Llobregat-Sarrií . Tender value: €1.35 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=112449-2003, OJ S 125, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. Read E-News Weekly 21/2003. 29/03.The alignment studies for the new line 12 from Castelldefels to Sant Boi de Llobregat and Sarrií  will be done by a JV of Idom and Payma Cotas for €1.2 millon. Visit www.idom.es and www.paymacotas.com 46/03.



Permalink

Spain, Galicia - es/102

Highway

Open call for bids, deadline 11th July, 2003 for technical assistance to the early design of the Porrií±o-Vigo motorway section. Approximate length is 9.5 km and a twin 2.65 km tunnel accommodating three lanes is required to cross the mountain ridge which separates the Louro and Lagares river basins. Tender budget: €390.660. Time frame for completion: 12 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=085776-2003, OJ S 95, or contact Ministry of development, Madrid, fax +34 91 5978536 or 915978470. E-mail randujar@mfom.es or cpublic@mfom.es 22/03.Open call for tenders, deadline 18th November, 2005 for project design for the safety equipment of the Folgoso tunnels (2,561 m / 2,551 m) on highway A-52 in Pontevedra province. These tunnels opened in 1998. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194511-2005, OJ S 197, or contact Ministry of public works, Madrid, fax +34 915978579 or 915978470. E-mail asanchez@mfom.es and cpublic@mfom.es 42/05.Getinsa and Gabinete de Control y Proyectos received a EUR317,000 contract for project design for the safety equipment of the Folgoso tunnels (2,561 m / 2,551 m) on highway A-52 in Pontevedra province. Visit www.getinsa.es 18/06.



Permalink

Spain, Basque Country - es/100

High Speed Railway

Open call for bids, deadline 13th March, 2003 for consulting and assistance to the design of the Legutiano-Escoriatza section of the Vitoria-Bilbao-San Sebastií¡n high speed link. There is in particular a 4.6 km tunnel. Tender value: €1.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=022076-2003, OJ S 27, or contact GIF, Madrid, fax +34 913198535. 08/03.Open call for bids, deadline 26th April, 2004 for design and build contract for sections Arrazua/Ubarrundia-Legutiano (7.8 km) and Legutiano-Escoriatza (7.4 km) of the high speed line between Vitoria, Bilbao and San Sebastian in Alava province. Includes the Luko tunnel (961 m) and the Albertia tunnel (4.9 km). Tender budget for design: EUR2.15 million, time frame: six months. Tender budget for construction: EUR278.7 million, time frame: 46 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040295-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. 12/04.Open call for bids, deadline 26th April, 2004 for design and build contract for sections Amorebieta/Etxano-Lemoa (3.4 km), Lemoa-Galdakao (5.4 km) and Galdakao-Basauri (3.6 km) of the high speed line between Vitoria, Bilbao and San Sebastian in Biscay province. There are four tunnels in Ganzelai (1,359 m), San Roman (735 m), Galdakao (1,792 m) and Zaratamo (2,716 m). Tender budget for design: EUR1.6 million, time frame: six months. Tender budget for construction: EUR185 million, time frame: 38 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040296-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. 12/04.Open call for bids, deadline 26th April, 2004 for design and build contract for sections Hernialde-Zizurkil (5.8 km), Zizurkil-Urnieta (7.2 km) and Urnieta-Hernani (5.4 km) of the high speed line between Vitoria, Bilbao and San Sebastian in Guipuzcoa province. There are five tunnels in Anoeta (1,260 m), Inura (2,467 m), Andoain (1,706 m), Aduna (4,540 m) and Hernani (2,635 m). Tender budget for design: EUR2.8 million, time frame: eight months. Tender budget for construction: EUR343.7 million, time frame: 36 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040297-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. 12/04.Open call for bids, deadline 23rd April, 2004 for construction management for section Mondragon-Bilbao of the high speed line between Vitoria, Bilbao and San Sebastian. Tender budget: EUR11.9 million, time frame: 60 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040512-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. 12/04.Open call for bids, deadline 23rd April, 2004 for construction management for section Vitoria-Mondragon of the high speed line between Vitoria, Bilbao and San Sebastian. Tender budget: EUR11.8 million, time frame: 55 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=es&docid=040545-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. 12/04.Open call for bids, deadline 23rd April, 2004 for construction management for section Hernialde-Bidasoa river of the high speed line between Vitoria, Bilbao and San Sebastian. Tender budget: EUR9.4 million, time frame: 60 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=es&docid=041280-2004, OJ S 48, or contact GIF, Madrid, fax +34 913198535. 12/04.Open call for bids, deadline 30th October, 2004 for design of the Aramaio-Mondragon section on the Vitoria-Bilbao-San Sebastian line. Tender budget: 600,000 euros. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=163936-2004, OJ S 192, or contact GIF, Madrid, fax +34 917005751. 42/04.Open call for bids, deadline 5th November, 2004 for design of 7.4 km Legutiano-Escoriatza section on the Vitoria-Bilbao-San Sebastian line. This section includes the 4.6 km Albertia tunnel. Tender budget: EUR1.25 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=163917-2004, OJ S 192, or contact GIF, Madrid, fax +34 917005751. 42/04.Open call for bids, deadline 5th November, 2004 for design of the 5.6 km Escoriatza-Aramaio section on the Vitoria-Bilbao-San Sebastian line. Tender budget: EUR1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=164800-2004, OJ S 193, or contact GIF, Madrid, fax +34 917005751. 42/04.Open call for bids, deadline 5th November, 2004 for design of the 7.8 km Arruzaua/Ubarrundia-Legutiano section on the Vitoria-Bilbao-San Sebastian line. Tender budget: EUR900,000. This section includes the 961 m Luko tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=164801-2004, OJ S 193, or contact GIF, Madrid, fax +34 917005751. 42/04.Open call for bids, deadline 5th November, 2004 for construction supervision services for the Vitoria-Bilbao section on the Vitoria-Bilbao-San Sebastian line. Tender budget: EUR2.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=164738-2004, OJ S 193, or contact GIF, Madrid, fax +34 917005751. 42/04.Sener and Ineco secured a EUR1.6 million contract for construction supervision services for the Vitoria-Bilbao section on the Vitoria-Bilbao-San Sebastian line. Visit www.sener.es and www.ineco.es 02/05.Saitec will design the 7.8 km Arruzaua/Ubarrundia-Legutiano section on the Vitoria-Bilbao-San Sebastian high speed line. Contract value: EUR643,500. This section includes the 961 m Luko tunnel. Visit www.saitec.es 03/05.Proser will design the 7.4 km Legutiano-Escoriatza section on the Vitoria-Bilbao-San Sebastian high speed line. Contract value: EUR912,550. This section includes the 4.6 km Albertia tunnel. Visit www.proser.es 03/05.Proser will design the 7.4 km Legutiano-Escoriatza section on the Vitoria-Bilbao-San Sebastian line, which includes the 4.6 km Albertia tunnel. Visit www.proser.es 05/05.Synconsult secured a EUR633.600 million contract to design section Escoriatza-Aramaio on the Y-shaped high speed line which will link Vitoria, Bilbao and San Sebastian. The 5.6 km section includes four tunnels totalling 3,366 m. 11/05.Open call for tenders, deadline 7th April, 2005 for construction of section Ordizia-Itsasondo in Gipuzkoa province. This section includes a 3 km tunnel approximately. Tender estimate: EUR55 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=045076-2005, OJ S 47, or contact the Basque government, San Sebastian, fax +34 945019742 or 945019787. E-mail transyop@ej-gv.es 12/05.A JV of Vigiconsult, Euroconsult and ICYE secured a EUR491,700 contract to design section Abadino-Durango on the so-called Y line, the high speed railway between Vitoria, Bilbao and San Sebastian. This 3.5 km section includes two tunnels for a total length of 1,488 m. Subscribe to E-News Weekly 10/2005. Visit www.vigiconsult.com and www.euroconsult.es 22/05AEPO and S.M.D. pocketed a EUR873,300 contract to design section Amorebieta/Etxano-Amorebieta/Etxano on the same line. This 5.1 km section includes four tunnels, for a total length of 1,575 m. Subscribe to E-News Weekly 10/2005. Visit www.aepo.es 22/05.Idom and Geoconsult Espaí±a secured a EUR798,400 contract to design section Durango-Amorebieta/Etxano (4.6 km) on the Vitoria-Bilbao-San Sebastian line, which includes three tunnels totalling 2,295 m. Subscribe to E-News Weekly 10/2005. Visit www.idom.es and www.geoconsult.es 23/05.Euroestudios secured a EUR619.800 contract to design section Lemoa-Galdakao (5.4 km) on the Vitoria-Bilbao-San Sebastian line, which includes a 1,792 m tunnel. Subscribe to E-News Weekly 10/2005. Visit www.euroestudios.es 23/05.Intraesa and Noega Ingenieros secured a EUR542,300 contract to design section Amorebieta/Etxano-Lemoa (3.4 km) on the Vitoria-Bilbao-San Sebastian line, which includes three tunnels totalling 2,394 m. Subscribe to E-News Weekly 10/2005. Visit www.intraesa.com 23/05.Ayesa secured a EUR493,450 contract to design section Galdakao-Basauri (3.6 km) on the Vitoria-Bilbao-San Sebastian line, which includes a 2,716 m tunnel. Subscribe to E-News Weekly 10/2005. Visit www.ayesa.es 23/05.Eptisa secured a EUR820,500 contract to design the 4.4 km Mondragon-Elorrio section on the Vitoria-Bilbao-San Sebastian line, including a 3,168 m tunnel. Subscribe to E-News Weekly 10/2005. Visit www.eptisa.es 24/05.Open call for tenders, deadline 16th February, 2006 for safety and health coordination during construction of the Vitoria-Bilbao-San Sebastian high speed line. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=09024-2006, OJ S 8, or contact ADIF, fax +34 917005751. 05/06.Open call for tenders, deadline 12th April, 2006 for work supervision during construction of section Arrazua/Ubarrundia-Legutiano (7.8 km) on the high speed link between Vitoria, Bilbao and San Sebastian. This section includes the 960 m-long Luko tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=053725-2006, OJ S 51, or contact ADIF, Madrid, fax +34 917005751. 13/06.ADIF, the authority responsible for managing the construction of high speed lines, has awarded the first contract on the line that will connect the three capitals of the Basque autonomous region (Vitoria-Gasteiz, Bilbao and San Sebastian) to a JV of Tecsa and Altuna y Uria, for EUR34.3 million and a construction period of 24 months. It is the 5.2 km-long Arrazua/Ubarrundia-Legutiano section which includes a 139 m underpass beneath the Vitoria-Gasteiz-Eibar motorway and the 970 m-long 95 sq m Luko tunnel. Visit www.adif.es, www.tecsa.es and www.altunayuria.com 15/06.Periodic notice for work control of section Mondragon-Elorrio (4.4 km), which includes a 3,168 m tunnel. This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074706-2006, OJ S 71, or contact ADIF, Madrid, fax +34 917005751. 17/06. Periodic notice for work control of section Abadino-Durango (3.5 km), which includes a 1,488 m tunnel. This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074707-2006, OJ S 71, or contact ADIF, Madrid, fax +34 917005751. 17/06. Periodic notice for work control of section Lemoa-Galdakao (5.4 km), which includes a 1,792 m tunnel. This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074708-2006, OJ S 71, or contact ADIF, Madrid, fax +34 917005751. 17/06. Periodic notice for work control of section Arrazua/Ubarrundia-Legutiano (7.8 km), which includes the Luko tunnel (961 m). This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074709-2006, OJ S 71, or contact ADIF, Madrid, fax +34 917005751. 17/06. Periodic notice for work control of section Legutiano-Escoriatza (7.4 km), which includes the Albertia tunnel (4.6 km). This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074711-2006, OJ S 71, or contact ADIF, Madrid, fax +34 917005751. 17/06. Periodic notice for work control of section Durango-Amorebieta/Etxano (4.6 km), which includes three tunnels for a total length of 2,295 metres. This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074712-2006, OJ S 71, or contact ADIF, Madrid, fax +34 917005751. 17/06.Periodic notice for work control of section Amorebieta/Etxano-Lemoa (3.4 km), which includes three tunnels totalling 2,400 metres. This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=075664-2006, OJ S 72, or contact ADIF, Madrid, fax +34 917005751. 19/06.Prointec and Cipsa Consulpal bagged a EUR945,800 contract for safety and health coordination during construction of the Vitoria-Bilbao-San Sebastian high speed line. Visit www.prointec.es and www.cipsaconsulpal.es 24/06.Saitec has won a EUR1.6 million contract for work supervision during construction of section Arrazua/Ubarrundia-Legutiano (7.8 km) on the high speed link between Vitoria, Bilbao and San Sebastian. This section includes the 960 m-long Luko tunnel. Visit www.saitec.es 24/06.Open call for tenders, deadline 25th August, 2006 for work supervision for the 7.4 km Legutiano-Escoriatza section, subsections I and II on the Basque high speed link between Vitoria, Bilbao and San Sebastian. The section includes the 4.6 km Albertia tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=152911-2006, OJ S 142, or contact ADIF, Madrid, fax +34 917005751. 33-34/06Open call for bids, deadline 13th November, 2006 for construction supervision of section Abadino-Durango on the new Vitoria-Bilbao-San Sebastian high speed line. This 3,520 m section includes two tunnels: Eguskiza, 664 m and Mendigain, 960 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=209611-2006, OJ S 197, or contact ADIF, Madrid, fax +34 917005751. Read E-News Weekly 41/2006. 43/06.Open call for bids, deadline 13th November, 2006 for construction supervision of section Mondragon-Elorrio on the new Vitoria-Bilbao-San Sebastian high speed line. This 4,440 m section includes two tunnels: Karraskain, 410 m and Udalaitz, 3,160 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=209609-2006, OJ S 197, or contact ADIF, Madrid, fax +34 917005751. Read E-News Weekly 41/2006. 43/06.Open call for bids, deadline 13th November, 2006 for construction of the Legutiano-Escoriatza section, subsection I on the new Vitoria-Bilbao-San Sebastian high speed line. The main structure on this 5 km section is the first 2.7 kilometres of the Albertia tunnel, which totals 4.8 km. It is a twin bored tunnel, 57 sq m for each tube. Read E-News Weekly 41/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=210177-2006, OJ S 198, or contact ADIF, Madrid, fax +34 917005751. 44/06.Open call for bids, deadline 27th November, 2006 for construction of the Legutiano-Escoriatza section, subsection II on the new Vitoria-Bilbao-San Sebastian high speed line. The main structure on this 2.4 km section is the final 2.1 kilometres of the Albertia tunnel. Read E-News Weekly 41/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=210202-2006, OJ S 198, or contact ADIF, Madrid, fax +34 917005751. 44/06.Open call for tenders, deadline 5th December, 2006 for work supervision for sections Eskoriatza-Aramaio and Aramaio-Mondragon on the Y-shaped high speed line between the three Basque capitals (Bilbao, Vitoria and San Sebastian). The first section is 5,580 m long and includes four tunnels: Uruburu 1 (474.7 m), Uruburu 2 (460.1 m), Mazmela, (384.3 m), and Induspe (2,224 m). The Aramaio-Mondragon section is 3,386 m long and includes the 550 m-long Achetarri tunnel. The route is for a double high speed track, IUC gauge. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215174-2006, OJ S 202, or contact ADIF, Madrid, fax +34 91 7005751. 45/06.Open call for bids, deadline 11th December, 2006 for construction of the Mondragon-Elorrio section on the new Vitoria-Bilbao-San Sebastian high speed line. This 4,440 m section includes two tunnels: Karraskain, 410 m and Udalaitz, 3,160 m. Read E-News Weekly 41/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215828-2006, OJ S 203, or contact ADIF, Madrid, fax +34 917005751. 45/06.Open call for bids, deadline 11th December, 2006 for construction of the Abadino-Durango section on the new Vitoria-Bilbao-San Sebastian high speed line. This 3,520 m section includes two tunnels: Eguskiza, 664 m and Mendigain, 960 m. Read E-News Weekly 41/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215829-2006, OJ S 203, or contact ADIF, Madrid, fax +34 917005751. 45/06.Typsa secured a EUR4.2 million contract for site supervision and work management for the 7.4 km Legutiano-Escoriatza section, subsections I and II on the Basque high speed link between Vitoria, Bilbao and San Sebastian. The section includes the 4.8 km Albertia tunnel. Visit www.typsa.es 51-52/06.Open call for tenders, deadline 19th February, 2007 for construction of the 5.6 km Escoriatza-Aramaio section on the Vitoria-Bilbao-San Sebastian high speed link. This section includes the Uruburu 1, Uruburu 2, Mazmela and Induspe twin-track tunnels, with respective length of 475 m, 460 m, 384 m and 2,224 m and cross section of 85 sq m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=4101-2007, OJ S 4, or contact ADIF, Madrid, fax +34 917005751. 03/07.A EUR65 million contract has been awarded to a JV of Comsa and Cycasa to build the 5 km-long subsection I on the Legutiano-Escoriatza section in Alava province. Construction will take 46 months. This subsection includes the first 2.7 kilometres of the Albertia twin bored tunnel, which totals 4.8 km and has a 57 sq m cross section. Visit www.comsa.com and www.cycasa.com 03/07.A JV between Ferrovial Agroman and Fonorte has been awarded a EUR65.7 million contract to build the 2.4 km-long subsection II on the Legutiano-Escoriatza section in Alava province. Construction will take 45 months. The subsection includes the final 2.1 kilometres of the Albertia tunnel. Visit www.ferrovial.com and www.fonorte.com 03/07.Euroconsult and ICYF pocketed a EUR3.8 million contract for site supervision of section Mondragon-Elorrio on the new Vitoria-Bilbao-San Sebastian high speed line. This 4,440 m section includes two tunnels: Karraskain, 410 m and Udalaitz, 3,160 m. Visit www.euroconsult.es 07/07.Eurocontrol and Compaí±í­a Vasca de Ingenierí­a signed a EUR2.4 million contract for construction supervision of the 3,520 m-long Abadií±o-Durango section on the new Vitoria-Bilbao-San Sebastian high speed line. The section includes the Eguskiza and Mendigain tunnels, respectively 664 m and 960 m long. Read E-News Weekly 41/2006. Visit www.eurocontrol.es 09/07.Eptisa pocketed a EUR3.3 million contract for work supervision for the Eskoriatza-Aramaio and Aramaio-Mondragon sections on the Y-shaped high speed line between the three Basque capitals (Bilbao, Vitoria and San Sebastian). The first section is 5,580 m long and includes four tunnels: Uruburu 1 (474.7 m), Uruburu 2 (460.1 m), Mazmela, (384.3 m), and Induspe (2,224 m). The Aramaio-Mondragon section is 3,386 m long and includes the 550 m-long Achetarri tunnel. Visit www.eptisa.es 09/07.Construction of the Abadií±o-Durango section on the Vitoria-Bilbao-San Sebastian high speed line has been commissioned to a JV formed by Construcciones Moyua, Construcciones y Promociones Balzola, and Azvi, each with 33.33%. The contract totals EUR50.7 million. This 3,520 m section includes the Eguskiza and Mendigain tunnels, of 664 m and 960 m respectively. Visit www.moyua.com, www.balzola.com and www.azvi.es 11/07.Obras Subterraneas secured a EUR69.7 million contract to build the Mondragon-Elorrio section on the Vitoria-Bilbao-San Sebastian high speed line. This 4,440 m section includes the Karraskain and Udalaitz tunnels, of 410 m and 3,160 m respectively. Visit www.obrassubterraneas.es 11/07.ADIF, the high speed railway administration, awarded Acciona Infraestructuras and Excavaciones Viuda de Sainz a EUR80.9 million contract to build the Eskoriatza-Aramaio section on the high speed link in the Basque Country. The JV pledged to complete construction in 29 months. This 5.58 km section includes a 2,224 m twin-track tunnel. Visit www.acciona.es 15/07.Periodic notice which is a call for tenders aimed at reducing the time for bid submission for construction supervision of the Ordizia-Itsasondo section in Gipuzkoa province. This section includes a 2.8 km tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=94534-2007, OJ S 77, or contact Red Ferroviaria Vasca, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 19/07.Open call for tenders, deadline 19th June, 2007 for construction supervision of the Amorebieta/Etxano-Lemoa and Amorebieta/Etxano-Amorebieta/Etxano section on the Vitoria-Bilbao-San Sebastian high speed line. The 3,449 m-long Amorebieta/Etxano-Lemoa includes three tunnels (Ganzelai, 1,365 m; San Roman, 727 m; and Marrageruena, 326 m). The 5 km Amorebieta/Etxano-Amorebieta/Etxano includes four tunnels (Arteako, 330 m; Orranpe, 505 m; Erribaso, 330 m; and Arizbakarro, 385 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103583-2007, OJ S 84, or contact ADIF, Madrid, fax +34 917005771. 19/07.Open call for tenders, deadline 3rd July, 2007 for construction of the 3.4 km Amorebieta/Etxano-Lemoa high speed rail section in Biscay province. This section includes the Ganzelai, San Romí¡n and Morrageruena tunnels, respective lengths of 1,365 m, 727 m and 326 m and cross-section of 85 sq m for the first and third tunnels and 95 sq m for the San Romí¡n tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=111747-2007, OJ S 91, or contact ADIF, Madrid, fax +34 917005751. 20/07.Open call for tenders, deadline 4th June, 2007 for site supervision and work inspection during construction of the Lemoa-Galdakao and Galdakao-Basauri high speed rail sections in Biscay province. The 5.4 km Lemoa-Galdakao section includes the 1,820 m-long Galdakao tunnel. The 3.6 km Galdakao-Basauri section includes a 2,728 m-long tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=105790-2007, OJ S 86, or contact ADIF, Madrid, fax +34 917005751. 21/07.Open call for tenders, deadline 4th June, 2007 for site supervision and work inspection during construction of the Durango-Amorebieta/Etxano high speed rail section in Biscay province. The 4.6 km section includes four mined tunnels: San Andres (703 m), Urzelai (661 m), Olabarrie I (481 m), Olabarrie II (409 m) and the Olabarrie cut-and-cover tunnel (172 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=105787-2007, OJ S 86, or contact ADIF, Madrid, fax +34 917005751. 21/07.Open call for tenders, deadline 16th August, 2007 for construction of the 4.6 km-long Durango-Amorebieta/Etxano section, including four mined tunnels: San Andres (703 m, 100 sq m), Urzelai (661 m, 95 sq m) and Olabarrie I and II (481 m and 409 m, 85 sq m), and the Olabarrie cut-and-cover tunnel (172 m) between the last two. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=160500-2007, OJ S 131, or contact ADIF, Madrid, fax +34 917005751. 29/07.Open call for bids, deadline 18th September, 2007 for construction of the 5.4 km Lemoa-Galdakao section on the Vitoria-Bilbao-San Sebastian high speed link. This section includes the 1,827 m-long Galdakao bored tunnel and the 230 m-long Galdakao cut-and-cover tunnel, each 85 square metres in cross-section. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=183739-2007, OJ S 148, or contact ADIF, fax +34 917005751. 33/07.Periodic notice, no deadline specified, being a call for competition aiming at reducing time limits for the receipt of tenders for design of the Mondragon-Bergara-Elorrio section on the new Vitoria-Bilbao-San Sebastian high speed line. This 4,440 m section includes two tunnels: Karraskain (410 m) and Udalaitz (3,160 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=162510-2007 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=162509-2007, OJ S 132, or contact ADIF, Madrid, fax +34 917005751. E-mail mjmoro@adif.es 34/07.Open call for bids, deadline 8th October, 2007 for construction of the Ordizia-Itsasondo section in Gipuzkoa province. This section includes a 2.8 km tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=195748-2007, OJ S 157, or contact Basque government and Red ferroviaria vasca, Bilbao, fax +34 945019451 and 946572601. E-mail ets@ets-rfv.es 35/07.Euroestudios and Fulcrum teamed up to get a EUR4.3 million contract for site supervision and work inspection during construction of the Lemoa-Galdakao and Galdakao-Basauri high speed rail sections in Biscay province. The 5.4 km Lemoa-Galdakao section includes the 1,820 m-long Galdakao tunnel. The 3.6 km Galdakao-Basauri section includes a 2,728 m-long tunnel. Visit www.euroestudios.es and www.fulcrum.es 35/07.Ayesa and Azierta Ingenieria secured a EUR4.3 million contract for site supervision of the Amorebieta/Etxano-Lemoa and Amorebieta/Etxano-Amorebieta/Etxano section on the Vitoria-Bilbao-San Sebastian high speed line. The 3,449 m-long Amorebieta/Etxano-Lemoa includes three tunnels (Ganzelai, 1,365 m; San Roman, 727 m; and Marrageruena, 326 m). The 5 km Amorebieta/Etxano-Amorebieta/Etxano includes four tunnels (Arteako, 330 m; Orranpe, 505 m; Erribaso, 330 m; and Arizbakarro, 385 m). Visit www.ayesa.es and www.geoteyco.es 35/07.Paymacotas and Apia XXI have been awarded a EUR4.3 million contract for site supervision and work inspection during construction of the Durango-Amorebieta/Etxano high speed rail section in Biscay province. The 4.6 km section includes four mined tunnels: San Andres (703 m), Urzelai (661 m), Olabarrie I (481 m), Olabarrie II (409 m) and the Olabarrie cut-and-cover tunnel (172 m). Visit www.paymacotas.com and www.apiaxxi.es 35/07.Open call for tenders, deadline 30th October, 2007 for site supervision and work control during construction of the Ordizia-Itsasondo section of the high speed line. This 2,859 m-long section runs almost fully in tunnel (2,814 metres). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=221722-2007, OJ S 181, or contact Euskal Trenbide Sarea-Red Ferroviaria Vasca, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 40/07.Open call for tenders, deadline 12th November, 2007 for construction of the 3.5 km Galdakao-Basauri section in Biscay province, including the 2,728 m-long 85 sq m Zaratamo tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=242863-2007, OJ S 200, or contact ADIF, Madrid, fax +34 917005751. 43/07.ADIF has awarded the 4.6 km Durango-Amorebieta/Etxano section on the Vitoria-Bilbao-San Sebastian high speed line to a joint venture formed by Ví­as y Construcciones (75%) and Nortíºnel (25%). The contract is worth EUR70 million and the time frame totals 30 months. The section includes several tunnels: San Andres (703 m), Urzelai (661 m), Olabarrie I and II (481 and 409 m respectively) and, between these two, the 172 m Olabarrie cut-and-cover tunnel. The cross-section is 100 sq m for the San Andres tunnel, 95 sq m for the Urzelai tunnel and 85 sq m for the Olabarrie tunnels. Visit www.vias.es and www.nortunel.com 44/07.Construction of the 5.03 km Amorebieta/Etxano-Amorebieta/Etxano section has been awarded to a joint venture of Construcciones y Promociones Balzola, Construcciones Moyua, and AZVI for an amount of EUR68 million and a time frame of 27 months. The project includes two bored tunnels: Arteako (330 m) and Orranpe (505 m) and two cut-and-cover tunnels: Erribaso (330 m) and Arizbakarra (385 m). Visit www.balzola.com, www.moyua.com and www.azvi.es 44/07.Construction of the Amorebieta/Etxano-Lemoa section has been commissioned to a joint venture formed by Urazca Construcciones and Corsí¡n Corviam, for a cost of EUR45 million and a time frame of 26 months. This 3.45 km section includes the Ganzelai, San Romí¡n and Marrageruena tunnels, respectively 1,365 m, 725 m and 326 m long. Visit www.urazca.com and www.corsan-corviam.es 44/07.A consortium led by Construcciones Ortiz will build the Lemoa-Galdakao section for EUR69 million. This 5.4 km section includes the 1,827 m-long Galdakao bored tunnel and the 230 m-long Galdakao cut-and-cover tunnel, each 85 square metres in cross-section. Visit www.grupoortiz.com 44/07.FCC, Construcciones Olabarri, Guihor Estructuras de Hormigí³n, and Construcciones Donosti scooped a EUR50.5 million contract to construct the 2,859 m Ordizia-Itsasondo section in Gipuzkoa province. This section includes a 2.8 km tunnel (98% of the route). Time frame for construction is 27 months. Visit www.fcc.es, www.olabarri.com and www.codosa.com 50-51/07.ACS, through its affiliate Dragados in partnership with Iza Obras y Promociones, will be responsible for the construction of the 3.53 km Galdakao-Basauri section in Biscay province. Their contract is worth EUR49.4 million and includes the construction of the 2.72 km Zaratamo tunnel. Visit www.dragados.com 02/08.Periodic notice, deadline unspecified, which is a call for tenders with the objective of reducing the time for receipt of bids, for design of the 5.4 km Urnieta-Hernani section, including the 2,638 m Urnieta tunnel and the 815 m Hernani tunnel. Both will be single bore tunnels with a cross section of 95 square metres. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=285494-2007, OJ S 234, or contact Red Ferroviaria Vasca, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 03/08.Open call for tenders, deadline 3th March, 2008 for design of the Urnieta-Hernani section in Gipuzkoa province, including the 2,638 m 95 sq m Urnieta single bored tunnel and the 815 m 95 sq Hernani tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=20675-2008, OJ S 16, or contact ETS-RFV, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 06/08.Open call for tenders, deadline 3th March, 2008 for design of the Hernani-Astigarraga section in Gipuzkoa province, including Tunnel 3.3, a 700 m 95 sq m single bored tunnel, and the 230 m 95 sq m single bored Loyola tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=20673-2008, OJ S 16, or contact ETS-RFV, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 06/08.Eptisa landed a EUR1.2 million contract for site supervision and work inspection during construction of the Ordizia-Itsasondo section of the high speed line. This 2,859 m-long section runs almost fully in tunnel (2,814 metres). Visit www.eptisa.es 07/08.Sener scooped a EUR1.3 million contract to design the 5.4 km Urnieta-Hernani section, including the 2,638 m tunnel and the 815 m Hernani tunnel. Each tunnel is a dual-track tunnel, featuring a 95 sq m cross-section. Visit www.sener.es 25/08.Fulcrum will design the Hernani-Astigarraga section in Gipuzkoa province, including Tunnel 3.3, a 700 m 95 sq m single bored tunnel, and the 230 m 95 sq m single bore Loyola tunnel. The contract is worth EUR2.8 million. Visit www.fulcrum.es 25/08.Open invitation to tender, deadline 12.03.2009, for construction of 2,159 m section of high speed railway at Beasain entirely in tunnels and viaducts. Estimated value EUR40.8 million, duration 35 months. Specs and docs from Cianoplan, tel +34 944-231520, fax -316895. Tenders or requests to participate must be sent to Comision Central de Contratacion in Vitoria-Gasteiz, tel +34 94501-8931, fax -9018, www.contratacion.info Enquiries to Department of Transport and Public Works in Vitoria, tel +34 94501-8931, fax -9018. For full construction history of this project see tunnelbuilder archive es/100. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=034391-2009. 06/09.



Permalink

Award of contract to UTE Dragados-Iza Obras y Promociones-Obras Subterraneas-Campezo, value EUR38,434,711.81 excluding VAT, for construction of 2,159 m-long tunnelled section of high speed railway at Beasain. Duration 32 months. More from Ana Maria Alonso Ciriano at OPT in Vitoria-Gasteiz, tel +34 945019-752, fax -018, e-mail am-aciriano@ej-gv.es. 32/09.



Permalink

Prior information of expected start of award procedures on 03.05.2010 for construction of 2.493 km-long Ezkio/Itsaso-Beasain section including two tunnels and one viaduct, value EUR52 million, excluding VAT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=10474-2010. 02/10.Prior information of expected start of award procedures on 03.05.2010 for construction of 3.835 km-long Tolosa-Hernialde section including three tunnels, two false tunnels and four viaducts, value EUR85 million, excluding VAT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=10475-2010. 02/10.Prior information of expected start of award procedures on 04.07.2010 for construction of 5.25 km-long Urneita-Hernani section including two tunnels and two viaducts, value EUR105 million, excluding VAT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=10477-2010. 02/10.Prior information of expected start of award procedures on 04.07.2010 for construction of 2.78 km-long Andoain-Urnieta section including one tunnel and two viaducts, value EUR64 million, excluding VAT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=10479-2010. 02/10.More on these four impending bids from Inaki Amondarain at Department for Public Works and Transport in Vitoria-Gasteiz, tel +34 9450197-54, fax -42, e-mail respcontract-trans@ej-gv.es. For history of this project since March, 2003 visit tunnelbuilder archive es/100. 03/10.



Permalink

Open invitation to tender, deadline 08.07.2010, for construction of 2.493 km-long Ezkio/Itsaso-Beasain section including two tunnels and one viaduct. Contract value EUR52 million excluding VAT, duration 32 months. Offers to Central de contratacion, Direccion de Patrimonio y Contratacion, Gobierno Vasco, Vitoria-Gasteiz, tel +34 945019-572730, fax -018, e-mail am-aciriano@ej-gv.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=160988-2010. 23/10.



Permalink

Open invitation to tender, deadline 08.09.2010, for construction of 3.835 km-long Tolosa-Hernialde section including three tunnels, two false tunnels and four viaducts. Contract duration 31 months, estimated value EUR95,321,241. More from Eugenia Ugartondo Segura at Department for Public Works and Transport in Vitoria-Gasteiz, tel +34 94501-8931, fax -9018, e-mail e-ugartondo@ej-gv.es, to whom tenders or requests to participate must be sent. Time limit for requests to access documents 07.09.2010 at 14.00h. Specs and docs from Copisteria Cianoplan in Bilbao, tel +34 944-231520, fax -316895, website www.contratacion.info. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=216988-2010. 30/10.



Permalink

Open invitation to tender, deadline 30.09.2010, for track construction works on 2.78 km-long Andoain-Urnieta section including one tunnel and two viaducts. More information from Gobierno Vasco in Vitoria Gasteiz, tel +34 9450189-31, fax -50, e-mail ab-perez@ej-gv.es to whom tenders or requests to participate should be sent. Specs and docs from Copisteria Cianoplan in Bilbao, tel +34 944231520, fax +34 944316895, website www.contratacion.info. Time limit for accessing documents 29.09.2010. Contract value EUR67,859,964 excluding VAT, duration 34 months. For project history visit tunnelbuilder archive es/100. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=257360-2010. 35/10.



Permalink

Contract, value EUR48,659,842 excluding VAT, for construction of 2.493 km-long Ezkio/Itsaso-Beasain section with two tunnels and a viaduct awarded to UTE Ortiz Construcciones y Proyectos SA/Construcciones Murias SA/Excavaciones Viuda de Sainz SA. Contract duration 32 months. For seven-year project history visit tunnelbuilder archive es/100. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358119-2010. 49/10.



Permalink

Contract, value EUR88,753,608 excluding VAT, for construction of 3.835 km-long Tolosa-Hernialde section with three tunnels, two false tunnels and four viaducts awarded to UTE Corsan-Corviam Construccion SA/Geotunel SL. Contract duration 31 months. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358122-2010. 49/10.



Permalink

Contract award to UTE Ferrovial Agroman/Construcciones Amenabar, value EUR64,127,666 excluding VAT, for track construction works on 2.78 km-long Andoain-Urnieta section including one tunnel and two viaducts. More information from Gobierno Vasco in Vitoria Gasteiz, tel +34 9450189-31, fax -50, e-mail ab-perez@ej-gv.es, website www.contratacion.info. Contract duration 34 months. For extensive project history visit tunnelbuilder archive es/100. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=012420-2011. 03/11.



Permalink


Open call for bids, deadline 06.11.2015, for the design of civil protection and safety installations in the Vitoria-Bilbao section of tunnels on the Vitoria-Bilbao-San Sebastian high speed line. Duration of the contract is 12 months from the award. Value of the contract is about EUR708,525.00 excluding VAT. Contact Adif, Madrid, tel  +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es.Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=327220-2015. Ref. n. 3.15/20830.0113 (P007/15). 39/15.




Permalink


The joint venture TRN Ingenieria y Planificacion de Infraestructuras and Sistemas Globales de Infraestructuras de Transporte secured the EUR279 867,57 contract, excluding VAT, for the design of civil protection and safety installations in the Vitoria-Bilbao section of tunnels on the Vitoria-Bilbao-San Sebastian high speed line. Fpr further information please contact Adif, Madrid, tel  +34 917744804, fax +34 917745814, e-mail pmardaiz@adif.es.Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=55393-2016. Ref. n. 3.15/20830.0113 (P007/15). 08/16.




Permalink

Prior information notice without call for competition for the project to build new emergency exits in the tunnels on the Bergara-Astigarraga section, on the Vitoria-Bilbao-San Sebastian high speed line. The 58.67km section includes 18 cut&cover tunnels and the 23 rock tunnels Kortatxo – Sakon (3706 m) with safety tunnel (2.720 m), Zumarraga (5455 m), Atsusain (555 m), Sorozarreta (1730 m), Arriaran (479 m), Itola (219 m), Loinaz (370 m), Beasain Este (1967 m), Ordizia Itsasondo (2832 m), Legorreta (2941 m), n.1 (1518 m), n.2 (1455 m), Aldaba Txiki (687 m), Auzo Txikia (210 m), Montezkue (1544 m), Anoeta (1372 m), Asteasu (2576 m), Zizurkil (845 m), Aduna (4718 m), Andoain (1939 m), Urnieta (2157 m), Hernani (770 m).  Duration of the contract is 18 months from the award. Value of the contract is about EUR11.7 million, excluding VAT. Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=143369-2017. 17/17.



Permalink

Open call for bids, deadline 16.04.2018, to build new safety tunnels for the Induspe (2205 m), Udalaitz-1 (3157 m), Mendigain (1035 m), Olabarrie (1078 m), Ganzelai (1381 m), Galdaakao (1789 m) and Zaratamo (2709 m) tunnels in the Vitoria-Bilbao section, of the Vitoria-Bilbao-San Sebastian high speed line. Duration of the contract is 18 months from the award.

Value of the contract is about EUR29.83 million, excluding VAT. For bid documents http://www.adifaltavelocidad.es/es_ES/empresas_servicios/licitaciones/licitaciones_en_curso.shtml.

Contact Adif, Madrid, tel  +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es.Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=088926-2018.

Ref. n. 3.18/20830.0008 (ON 002/18). 11/18.



Permalink

The contract of the open call for bids to build new safety tunnels for the Induspe (2205 m), Udalaitz-1 (3157 m), Mendigain (1035 m), Olabarrie (1078 m), Ganzelai (1381 m), Galdaakao (1789 m) and Zaratamo (2709 m) tunnels in the Vitoria-Bilbao section, of the Vitoria-Bilbao-San Sebastian high speed line, was not awarded. Contact Adif, Madrid, tel  +34 917744804, fax +34 917674490, email mjmoro@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=234702-2018.

Ref. n. 3.18/20830.0008 (ON 002/18). 25/18.



Permalink

Prior information notice without call for competition for the design of the new safety exits in tunnels in the Vitoria-Bilbao section, of the Vitoria-Bilbao-San Sebastian high speed line. Value of the contract EUR743.801,65, excluding VAT. Duration of the contract is 24 months from the award. Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=188932-2018.

25/18.



Permalink

Open invitation to tender, deadline 31.01.2019, to build new emergency exits in the tunnels on the Bergara-Astigarraga section, on the Vitoria-Bilbao-San Sebastian high speed line. Duration of the contract is 21 months from the award. Value of the contract is about EUR15,9 million, excluding VAT. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=547310-2018

and

https://apps.euskadi.eus/w32-1084/es/contenidos/anuncio_contratacion/expjaso16048/es_doc/es_arch_expjaso16048.html?ruta=/w32-1084/es/v79aWar/comunJSP/v79aSubmitBuscarAnuncioFiltro.do?estado=AL&origenSubHome=busquedaPersonalizada.

Ref.n. P20018381. 02/19.



Permalink

Open invitation to tender, deadline, 25.02.2019, for support service to the works management during construction of the new emergency exits in the tunnels of  the Vitoria-Bilbao-San Sebastian high speed line. Duration of the contract is 23 months from the award. Value of the contract is about EUR1.078 million, excluding VAT. For bid documents http://www.contratacion.euskadi.eus/ where offers must be sent. Contact Euskal Trenbide Sarea (ETS), att.ne Matxalen Elordi, Bilbao, tel +34 946572600, fax +34 946572601, email ets@ets-rfv.eus. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=021761-2019.

Ref. n. P20018528. 03/19.



Permalink

Open invitation to tender, deadline 15.02.2019, for the construction of the new safety exits in tunnels in the Vitoria-Bilbao section, of the Vitoria-Bilbao-San Sebastian high speed line. Value of the contract is EUR32.56 million, excluding VAT. The duration of the contract is 27 months from the award. For bid documents http://www.adif.es/AdifWeb/licitaciones/listadoLicitaciones.jsp?TIPO_BUSQUEDA=EN_CURSO&i=es_ES where offers must be sent. Contact Adif-Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email pmardaiz@adif.es. Visit

http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=025048-2019.

Ref.n. 3.18/20830.0410 - ON 044/18. 03/19.




Permalink

Icyfsa Ingenieria from Tres Cantos (Madrid) secured the EUR300,000 contract, excluding VAT, for consulting services, technical support and monitoring of tunnel construction on the Madrid- Vitoria/Gasteiz-Bilbao-Donostia/San Sebastian High Speed Railway, Nudo Mondragon-Elorrio-Bergar section. Contact Ineco, Madrid, tel  +34 914526767, email elh@ineco.com. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=043804-2018.

Ref.n.20180612-00416. 06/19.




Permalink

Periodic indicative notice without call for competition for the construction of the new safety exits for tunnels on the Vitoria-Bilbao-San Sebastian high speed line, Vitoria-Bilbao section. The value of the contract is EUR32.56 million, excluding VAT. The duration of the contract is 27 months. Contact Adif-Alta Velocidad, Madrid, email gestionadministrativaAV@adif.es.. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=108681-2019.

11/19.



Permalink

Periodic indicative notice without call for competition for general management during the construction of the new safety exits for tunnels on the Vitoria-Bilbao-San Sebastian high speed line, Vitoria-Bilbao section.

Value of the contract is EUR2 million, excluding VAT. Contact Adif-Alta Velocidad, Madrid, email gestionadministrativaAV@adif.es.. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104203-2019.

11/19.



Permalink

Open invitation to tender, deadline, 25.04.2019, for consultancy services and technical assistance for the works management during construction of the new emergency exits in the tunnels of  the Vitoria-Bilbao-San Sebastian high speed line, Vitoria-Bilbao section. Value of the contract is EUR2 million, excluding VAT and the duration of the contract is 30 months. For bid documents http://www.adif.es/AdifWeb/licitaciones/listadoLicitaciones.jsp?TIPO_BUSQUEDA=EN_CURSO&i=es_ES.

Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123275-2019.

Ref. n. 3.19/20830.0026 (CON 006/19). 14/19.



Permalink

The JV Esteyco SA (60 %)/Team Ingenieria y Consultoria SL (40 %) from Madrid secured the EUR 1,197,796.92 contract, excluding VAT, for consulting and technical assistance for the general management  during the construction of new emergency exits in tunnels of the Vitoria-Bilbao-San Sebastian high-speed line, section Vitoria-Bilbao.  Contact Adif-Alta Velocidad, Madrid, tel +34 917744804,  email contrataciondcc@adif.es. For bid/tender documents click here.


Ref.n. 3.19/20830.0026- CON 006/19. 42/19.



Permalink

Obras Subterraneas SA (OSSA) from Madrid secured the EUR 25.22 million contract, excluding VAT, for the construction of the new safety exits in tunnels in the Vitoria-Bilbao section, of the Vitoria-Bilbao-San Sebastian high speed line. Contact Adif-Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email pmardaiz@adif.es. For bid/tender documents click here.


Ref.n. 3.18/20830.0410 - ON 044/18. 42/19.



Permalink

Open invitation to tender, deadline 26/12/2019, for consulting and technical assistance services for the construction design of civil protection and safety facilities in the tunnels of the Vitoria-Bilbao-San Sebastian high-speed line, Vitoria-Bilbao section. Value of the contract is  EUR 484 235.56,  excluding VAT. Duration of the contract is 10 months. For tender documents please click here and here.

Tenders must be sent to https://elicitadores.ADIF-AV.es. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Ref. n. CON 034/19- 3.19/30830.0281. 48/19.



Permalink


The JV Ayesa Ingenieria y Arquitectura SAU (60 %)/Geoconsult Espana Ingenieros Consultores SAU (40 %) secured the EUR348,649.60 contract,  excluding VAT, for consulting and technical assistance services for the construction design of civil protection and safety facilities in the tunnels of the Vitoria-Bilbao-San Sebastian high-speed line, Vitoria-Bilbao section. For tender documents please click here. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Ref. n. CON 034/19- 3.19/30830.0281. 03/21. 

 




Permalink

Periodic indicative notice for construction of new safety  exits in the tunnels of the Vitoria-Bilbao-San Sebastian/Donostia high-speed line, Vitoria-Bilbao section. Click here for tender documents and here where tenders must be sent. Value of the contract is EUR 25.2 million, excluding VAT. Duration of the contract will be 22 months. Estimated date of publication of contract notice: 31/12/2022. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=123083-2022. 13/22.  

  



Permalink


Periodic indicative notice for construction of new safety exits in the tunnels of the Vitoria-Bilbao-San Sebastian/Donostia high-speed line, Vitoria-Bilbao section. Click here for tender documents and here where tenders must be sent. Value of the contract is EUR25.2 million, excluding VAT. Duration of the contract will be 22 months. Estimated date of publication of contract notice: 31/12/2022. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=123083-2022. 13/22. 

Spain-Madrid: Railway construction works

2022/S 047-123083

Periodic indicative notice – utilities

This notice aims at reducing time limits for receipt of tenders

Works

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: ADIF-ALTA VELOCIDAD
National registration number: Q2802152E
Postal address: Avda. Pío XII, 110 – Caracola 16
Town: MADRID
NUTS code: ES300 Madrid
Postal code: 28036
Country: Spain
E-mail: contrataciondcc@adif.es
Telephone: +34 917744804
Fax: +34 917674490
Internet address(es):
Main address: www.adifaltavelocidad.es
Address of the buyer profile: http://www.adifaltavelocidad.es/es_ES/empresas_servicios/licitaciones/licitaciones.shtml
I.6)Main activity
Railway services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

PROYECTO DE CONSTRUCCIÓN DE NUEVAS SALIDAS DE EMERGENCIA EN LOS TÚNELES DE LA LÍNEA DE ALTA VELOCIDAD VITORIA - BILBAO - SAN SEBASTIÁN. TRAMO: VITORIA - BILBAO

II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.5)Estimated total value
Value excluding VAT: 25 200 000.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ES España
II.2.6)Estimated value
Value excluding VAT: 25 200 000.00 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 22
II.3)Estimated date of publication of contract notice:
31/12/2022

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for the receipt of applications for an invitation to tender or to negotiate / Time limit for receipt of expressions of interest
IV.2.5)Scheduled date for start of award procedures:
31/12/2022

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
03/03/2022



Permalink


Periodic indicative notice for the civil protection and safety equipment in the tunnels of the Vitoria-Bilbao-San Sebastian/Donostia high-speed line, Vitoria-Bilbao section. Estimated date of publication of contract notice: 30/06/2023.Value of the contract is EUR 15 million, excluding VAT. Duration of the contract will be 12 months. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=156534-2023. 11/23. 

España-Madrid: Trabajos de construcción ferroviaria


2023/S 053-156534

Anuncio periódico indicativo – sectores especiales

El presente anuncio tiene por objeto reducir los plazos de recepción de ofertas

Obras

Base jurídica:
Directiva 2014/25/UE

Apartado I: Entidad adjudicadora

I.1)Nombre y direcciones
Nombre oficial: ADIF-ALTA VELOCIDAD
Número de identificación fiscal: Q2802152E
Dirección postal: Avda. Pío XII, 110 – Caracola 16
Localidad: MADRID
Código NUTS: ES300 Madrid
Código postal: 28036
País: España
Correo electrónico: contrataciondcc@adif.es
Teléfono: +34 917744804
Fax: +34 917674490
Direcciones de internet:
Dirección principal: www.adifaltavelocidad.es
Dirección del perfil de comprador: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=DUt%2BH4MbPkQQK2TEfXGy%2BA%3D%3
I.3)Comunicación
Puede obtenerse más información en la dirección mencionada arriba
Las ofertas o solicitudes de participación deben enviarse a la dirección mencionada arriba
I.6)Principal actividad
Servicios de transporte ferroviario

Apartado II: Objeto

II.1)Ámbito de la contratación
II.1.1)Denominación:


PROYECTO DE CONSTRUCCIÓN DE INSTALACIONES DE PROTECCIÓN CIVIL Y SEGURIDAD EN LOS TÚNELES DE LA LAV VELOCIDAD VITORIA-BILBAO-SAN SEBASTIÁN.TRAMO: VITORIA-BILBAO


II.1.2)Código CPV principal
45234100 Trabajos de construcción ferroviaria
II.1.3)Tipo de contrato
Obras
II.1.4)Breve descripción:


PROYECTO DE CONSTRUCCIÓN DE INSTALACIONES DE PROTECCIÓN CIVIL Y SEGURIDAD EN LOS TÚNELES DE LA LAV VELOCIDAD VITORIA-BILBAO-SAN SEBASTIÁN.TRAMO: VITORIA-BILBAO


II.1.5)Valor total estimado
Valor IVA excluido: 15 000 000.00 EUR
II.1.6)Información relativa a los lotes
El contrato está dividido en lotes: no
II.2)Descripción
II.2.2)Código(s) CPV adicional(es)
45222300 Trabajos de ingeniería para instalaciones de seguridad
45221240 Trabajos de construcción de túneles
II.2.3)Lugar de ejecución
Código NUTS: ES España
II.2.4)Descripción del contrato:


PROYECTO DE CONSTRUCCIÓN DE INSTALACIONES DE PROTECCIÓN CIVIL Y SEGURIDAD EN LOS TÚNELES DE LA LAV VELOCIDAD VITORIA-BILBAO-SAN SEBASTIÁN.TRAMO: VITORIA-BILBAO


II.2.5)Criterios de adjudicación
El precio no es el único criterio de adjudicación, y todos los criterios figuran únicamente en los pliegos de la contratación
II.2.6)Valor estimado
Valor IVA excluido: 15 000 000.00 EUR
II.2.7)Duración del contrato, acuerdo marco o sistema dinámico de adquisición
Duración en meses: 12
II.2.10)Información sobre las variantes
II.2.11)Información sobre las opciones
II.2.13)Información sobre fondos de la Unión Europea
El contrato se refiere a un proyecto o programa financiado con fondos de la Unión Europea: sí
Identificación del proyecto:


Podrá ser cofinanciado por el Plan de Recuperación, Transformación y Resiliencia - Financiado por la Unión Europea – NextGenerationEU


II.2.14)Información adicional
II.3)Fecha estimada de publicación del anuncio de licitación:
30/06/2023

Apartado IV: Procedimiento

IV.1)Descripción
IV.1.3)Información sobre un acuerdo marco o un sistema dinámico de adquisición
IV.1.8)Información acerca del Acuerdo sobre Contratación Pública
El contrato está cubierto por el Acuerdo sobre Contratación Pública: sí
IV.2)Información administrativa
IV.2.2)Plazo para la presentación de solicitudes para una invitación a licitar o para negociar / Plazo para la recepción de manifestaciones de interés
IV.2.5)Fecha prevista para el inicio de los procedimientos de adjudicación:

Apartado VI: Información complementaria

VI.2)Información sobre flujos de trabajo electrónicos
Se aceptará la facturación electrónica
VI.3)Información adicional:
VI.4)Procedimientos de recurso
VI.4.1)Órgano competente para los procedimientos de recurso
Nombre oficial: Tribunal Administrativo Central de Recursos Contractuales (TACRC)
Dirección postal: Avda General Perón nº 38 - 8ª Planta
Localidad: Madrid
Código postal: 28071
País: España
Correo electrónico: tribunal_recursos.contratos@hacienda.gob.es
Fax: +34 913491319
VI.4.2)Órgano competente para los procedimientos de mediación
Nombre oficial: ÓRGANO DE CONTRATACIÓN DE ADIF
Dirección postal: Avda. Pío XII, 110 – Caracola 16
Localidad: Madrid
Código postal: 28036
País: España
Fax: +34 917674490
VI.5)Fecha de envío del presente anuncio:
10/03/2023



Permalink

Prior information notice for civil protection and safety installations in the tunnels Vitoria/Gasteiz-Bilbao-Donostia/San Sebastian High Speed Railway, Mondragon-Elorrio-Bergar section. Contact Adif-Alta Velocidad, Madrid, tel +34917744804, email comprasycontratacion@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/101260-2024. 16/24. 



Permalink

Spain, Saragossa-Pau - es/99

Railway

The ministry of development has awarded to AEPO a €862,000 engineering contract for the design studies for the reopening of the international tunnel on the Saragossa-Pau railway and upgrading of Canfranc station. SNCF, the French state rail company, and RFF, the rail network operator, have trebbled their estimate to renovate the 85 km section in France. €300 million would have to be invested to reopen the line. In Spain, the budget is estimated at €360.6 million. Read E-News Weekly # 30. Visit www.aepo.es 07/03.



Permalink


Open invitation to tender, deadline 07/01/2021, for the study for the re-opening of the railway Somport tunnel, 7875 m long with 4012 m in France and 3863 in Spain, on the Pau - Canfranc railway line. For tender documents click here and for further information on tender click here. Value of the contract is EUR1.10 million, excluding VAT. Duration of the contract 33  months. Contact Subdireccion General de Planificacion Ferroviaria, Madrid, email ferrocarrilessgpp@fomento.es. Ref.n. 2020F2230410. 49/20.

 




Permalink


Tecnica y Proyectos SA  from San Sebastian secured the EUR814,000 contract, excluding VAT,  for the study for the re-opening of the railway Somport tunnel, 7875 m long with 4012 m in France and 3863 in Spain, on the Pau - Canfranc railway line. Contact Subdireccion General de Planificacion Ferroviaria, Madrid, email ferrocarrilessgpp@fomento.es. For further information click here - Ref.n. 2020F2230410. 16/21.

 




Permalink

Spain, Valencia - es/98

Road

Open call for bids, deadline 17th May, 2004 for construction of a canal between the inner harbour basin with the sea in the Valencia harbour, 500 m in length, and a tunnel for two dual-lane carriageways, approximately 1 km in length. Cut-and-cover method or immersed tube. Total width of the two carriageways will be approximately 25 m, separated by a wall or pillars. This project is part of the infrastructure to be constructed for the America's Cup that Valencia will host in 2007. Award before the summer. Completion planned for 1st April, 2006. Tender value: EUR143.9 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=055825-2004, OJ S 65, or contact Autoridad Portuaria de Valencia, Valencia, fax +34 963939599 or 39. E-mail apv@valenciaport.com 18/04.



Permalink

Spain, Canaries - es/97

Ring Road

A €36.5 million contract has been awarded to a JV of Sacyr and Cavosa to build the outer ring road in Santa Cruz de La Palma on Isle of La Palma. The alignment circles the city by the west and necesitates four tunnels plus a fifth short tunnel on a connection road. The road stretches for 3,717 metres, of which 1,650 m in tunnel. Visit www.sacyr.es and www.cavosa.es 01/03.



Permalink

Spain, Madrid - es/96

Highway

€268.5 million 25-year concession contract awarded to Empresa Nacional de Autopistas (ENA) and OHL to build, maintain and operate the motorway to the Barajas Airport. Section 2 between motorways A-10 and M-40 requires 3.44 km of tunnel under Juan Carlos I Park. Visit www.ena.es and www.ohl.es. Read E-News Weekly # 12 & 33. 48/02.



Permalink

Moncobra SA from Madrid secured the EUR1.15 million contract, excluding VAT, for the operation and maintenance of security and management control systems in the tunnels of Adolfo Suarez Madrid-Barajas Airport in Madrid. Contact Aena, Madrid,  tel +34 913212710, fax +34 913212712, email tramitacion_expedientes@aena.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=140338-2019.

Ref.n. MAD 236/2018. 14/19.



Permalink

Negotiated invitation to tender, deadline 01/10/2019, for the replacement of the CCTV tunnel system and integration to the video network of Adolfo Suarez Madrid-Barajas Airport in Madrid. Value of the contract is EUR 557,990.00 excluding VAT. Duration of the contract is 8 months. Contact Aena, attn Beatriz Rosillo Heras, Madrid,  email ocontratacionmad@aena.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=422922-2019.

Ref.n. MAD 221/2019. 38/19.



Permalink

Postponed from 01/10/2019 to 15/10/2019 the deadline of the negotiated invitation to tender for the replacement of the CCTV tunnel system and integration to the video network of Adolfo Suarez Madrid-Barajas Airport in Madrid. Value of the contract is EUR 557,990.00 excluding VAT. Duration of the contract is 8 months. Contact Aena, attn Beatriz Rosillo Heras, Madrid,  email ocontratacionmad@aena.es. For further bid documents click here 
Ref.n. MAD 221/2019. 41/19.



Permalink


SICE - Sociedad Iberica de Construcciones Electricas SA from Madrid secured the EUR 282,560 contract, excluding VAT, for operation and maintenance of the urban tunnel at Malaga-Costa del Sol Airport connected with highway  N-348 and of the Handling tunnel under the south connection with the Malaga-Costa del Sol Airport. Contact Aena SME SA, Madrid,  tel +34 913212710, fax +34 913212712, email tramitacion_expedientes@aena.es . Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=601662-2021. Ref.n. AGP-132/2021. 47/21. 



Permalink

Closing date: 06/03/2023 

Open invitation to tender, deadline 06/06/2023, for the operation and maintenance of security and control systems as well as the related centers and facilities in the following tunnels at the Adolfo Suárez Madrid-Barajas Airport:  

  • 4 tunnels for the M-111 highway,  including CELA and TWR Branchs ( 2606 m) 
  • cut&cover tunnel of the M-14 highway (425 m) 
  • 3 tunnels for the Airport Services Tunnel -TSA (2872 m) 
  • tunnel under runway - PBP 14L-32R (459 m) 
  • tunnel under runway - PBP 18L-36R (456 m) 
  • tunnel under Dique Platform - PBC U3-W3 (235 m) 
  • tunnel La Munoza - PBC KA8 (130 m) 
  • tunnel for the automated baggage transport system - SATE T123 (800 m) 

Click here for tender documents and here where tenders must be sent. Value of the contract will be EUR5.89 million, excluding VAT. Duration of the contract is 12 months. 

Contact Aena SA, Madrid, tel +34 913212710, fax +34 913212712, email tramitacion_expedientes@aena.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=076903-2023. Ref.n. MAD-1/2023. 06/23. 

here=> https://contratacion.aena.es/contratacion/principal?portal=infoexp&idexp=9610156675&tipoexp=400 

here=> https://share.aena.es/index.php/s/g7lMk0tOSPowSFQ



Permalink

Spain, Madrid-Valencia-Murcia - es/95

High Speed Railway

Invitation to tender imminent for the construction of the Xátiva-L'Enova section of the Madrid-Castilla La Mancha-Comunidad Valenciana-Murcia high speed line further to approval by the government. There will be a 2 x 746 m-long tunnel. The tender value will be €61.95 million and the time frame for construction is 16 months. Visit www.gif.es 44/02. Construction of the Xàtiva-L'Enova section has been awarded to the Ploder / Rover Alcisa JV for €41.5 million. Time frame: 15 months. Includes a 2 x 746 m-long tunnel. Visit www.gif.es and www.ploder.es 08/03. A JV between Vorsevi and Entecsa has won a €370,200 contract for geotechnical engineering for section Aldaya-Valencia of the Madrid-Valencia-Murcia high speed line. This section includes two tunnels, 1.9 km and 1.2 km in length. Read E-News Weekly 18/2003. Visit www.vorsevi.es and www.entecsa.com 24/03. Cemosa will provide consultancy services and assistance for the geotechnical study of the Contreras Dam-Villagordo del Cabriel section for €545,345. This section includes two tunnels, 700 and 2 km in length. Subscribe to E-News Weekly 18/2003. 26/03. The geotechnical study for the Siete Aguas-Buñol stretch will be done by a JV of Eptisa, Intecasa and Cinsa-EP for €523,490. The design and work control has been awarded to the Iberinsa / Geoconsult España JV for €2.85 million. This section also includes two tunnels, 6 km and 1.5 km in length. Subscribe to E-News Weekly 18/2003. Visit www.eptisa.es and www.intecasa.com 26/03. The consultancy and assistance to the project design and work control for the Minglanilla-Villagordo del Cabriel section, which includes two tunnels (700 m and 2 km) has been awarded to a Sener / Gestec JV for €3.5 million. Visit www.sener.es and www.gif.es 29/03. Open call for bids, deadline 28th November, 2003 for construction of the 6.8 km-long Requena-Siete Aguas section. Includes two tunnels, 290 m and 1,462 m in length. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=187331-2003, OJ S 208, or contact GIF, Madrid, fax +34 913198505. 45/03. Open call for bids, deadline 25th November, 2003 for geotechnical engineering as part of the construction of the Cuenca-Olalla section of the Levante high speed link from Madrid to Castilla la Mancha, Valencia and Murcia. There is a 2.1 km-long 100 m² tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=184033-2003, OJ S 204, or contact GIF, Madrid, fax +34 913198535. 47/03. Open call for bids, deadline 25th November, 2003 geotechnical engineering as part of the construction of the Olalla-Arcas de Villar section of the Levante high speed link from Madrid to Castilla la Mancha, Valencia and Murcia. There is a 3 km-long 80 m² single-tube tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=184034-2003, OJ S 204, or contact, Madrid, fax +34 913198535. 47/03. Open invitation to tender, deadline 10th December, 2003, for the geotechnical study for the Horcajada-Torrejoncillo section. A single-tube dual-track tunnel is planned, approximate length: 3.7 km. Inner cross section: 80 m². Budget: €475,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194331-2003, OJ S 216, or contact GIF, Madrid, fax +34 913198535. 49/03. Open invitation to tender, deadline 30th December, 2003, for design of the new railway station in Valence. The building will be situated between Gran Vía Germanías and the existing Estación del Norte. Two underground basements with six tracks per basements. High speed trains at the upper level and suburban trains at the lower level. Budget: €3.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=202345-2003, OJ S 226, or contact Ministerio de Fomento, Madrid, fax +34 5978470 or 9342. 49/03. Open call for bids, deadline 12th January, 2004 for design and work management of section Arcas del Villar-Fuentes. Includes three single-tube tunnels, lengths 150 m, 250 m and 1.350 m and cross section 100 m². Tender value: €5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=208923-2003, OJ S 234, or contact GIF, Madrid, fax +34 913198535. 50/03. Open call for bids, deadline 12th January, 2004 for design and work management of section Olalla-Arcas del Villar. Includes one single-tube tunnel, 3 km in length, cross section 80 m². Tender value: €5.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=208886-2003, OJ S 234, or contact GIF, Madrid, fax +34 913198535. 50/03. Open call for bids, deadline 16th January, 2004 for geotechnical studies of section Seseña-Aranjuez. Includes four single-tube tunnels, lengths 1.7 km, 800 m, 300 m and 150 m, cross section 100 m² except the 800 m-long tunnel which will feature a 115 m² section. Tender value: €515,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=208828-2003, OJ S 234, or contact GIF, Madrid, fax +34 913198535. 50/03. Open call for bids, deadline 12th January, 2004 for design and work management of section Cuenca-Olalla. Includes a single-tube tunnel, 2.1 km in length, cross section 100 m². Tender value: €4.9 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=208842-2003, OJ S 234, or contact GIF, Madrid, fax +34 913198535. 50/03. ACS has secured a €39 million contract to build the Requena-Siete Aguas section of the high speed train to the east coast. This 6.8 km section includes two tunnels, 290 and 1,462 m in length respectively. Visit www.grupoacs.com 02/04. Geocontrol and in Situ Testing have secured a EUR400,650 contract to carry out the geotechnical studies for section Olalla-Arcas de Villar which requires a 3 km-long 80 sq m single-tube tunnel. Visit www.geocontrol.es 07/04. Open invitation to tender, deadline 30th March, 2004 for design and construction management of section Torrejón de Velasco-Aranjuez, 24 km in length. Includes six single-tube tunnels. Two of these, 100 m-long x 100 sq m in cross section and 550 m-long x 110 sq m respectively, are located between Torrejón de Velasco and Seseña. Four are between Seseña and Aranjuez. Lengths: 1,700 m, 800 m, 300 m and 150 m with cross section of 100 sq m except for the 800 m-long tunnel which features a 115 sq m cross section. Tender budget: EUR6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035161-2004, OJ S 340, or contact GIF, Madrid, fax +34 913198535. 11/04. Open invitation to tender, deadline 13th April, 2004 for construction of a 5 km section in Monteagudos de las Salinas, including the 1,097 m Tendero tunnel. Tender budget: EUR39.1 million. Time frame for construction: two years. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040288-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. Read E-News Weekly 10/2004. 12/04. Open invitation to tender, deadline 13th April, 2004 for construction of the 6.9 km Sax-Elda section, including the 2,890 m Las Barrancadas tunnel. Tender budget: EUR61.3 million. Time frame for construction: 52 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040289-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. Read E-News Weekly 10/2004. 12/04. Sergeyco and Geoconsult won a EUR378,495 contract for the geotechnical studies of the Sesena-Aranjuez section, including four single-tube tunnels (1,700 m, 800 m, 300 m and 150 m). Visit www.sergeyco.com and www.geoconsult.es 12/04. Euroestudios won a EUR3 million contract for the design and construction management of section Arcas del Villar-Fuentes, including three single-tube tunnels (150 m, 250 m and 1,350 m). Visit www.euroestudios.es 12/04. Ginprosa won a EUR2.9 million for the design and construction management of section Cuenca-Olalla, including a 2.1 km single-tube tunnel. 12/04. Geocisa won a EUR346,000 contract for the geotechnical study for the Horcajada-Torrejoncillo section, including a 3.7 km single-tube tunnel. Visit www.geocisa.com 12/04. Open invitation to tender, deadline 13th April, 2004 for construction of the 11 km Fuentes-Monteagudo de las Salinas section, including the 1.5 km-long 115 sq m Los Cubillos tunnel. It is a single-tube dual-track tunnel. Drill/blast method with shotcrete, bolts and steel arches for support. Tender budget: EUR70.1 million. Tunnel cost estimated at EUR20.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040290-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. 13/04. Prointec secured a EUR3.5 million contract for design and construction supervision of the Horcajada-Torrejoncillo section, including a 3.7 km-long 80 sq m single-tube tunnel. Visit www.prointec.es 16/04. Iberinsa and Geoconsult España won a EUR3.2 million contract to design and supervise the construction of the Olalla-Arcas del Villar section on the high speed line to Valencia and Murcia. This section includes a 3 km x 80 sq m single-tube tunnel. Visit www.iberinsa.es and www.geoconsult.es 17/04. The design and work supervision of the Obispalia-Cuenca section on the high speed line to Valencia and Murcia has been awarded to Intraesa and Ofiteco for EUR2.7 million. This section includes three single-tube tunnels of 2 km, 100 m and 650 m, with cross sections of 100 sq m for the first two and 115 sq m for the third. Visit www.intraesa.com and www.ofiteco.es 17/04. Sacyr Vallehermoso and Cavosa have secured a EUR42.1 million contract to build the 6.9 km Sax-Alda section in 44 months. This section includes the 2,980 m Las Barracandas tunnel. Visit www.gruposyv.com 30/04. Comsa will build a 5 km section in Monteagudo de las Salinas, including the 1,097 m Tendero tunnel. The contract is worth EUR29.2 million and construction will take 20 months. Visit www.comsa.com 30/04. Inocsa will design and supervise the construction of section Torrejon de Velasco-Aranjuez for EUR4.2 million and 41 months. This section includes six single-tube tunnels (100 m, 550 m, 1.7 km, 800 m, 300 m and 150 m), with sections of 100 to 115 sq m. Visit www.inocsa.es 30/04. Constructora Hispanica and Emerita de Obras secured a EUR48 million contract to build section Fuentes-Monteagudo de las Salinas (11 km), including the 1.5 km-long 115 sq m Los Cubillos single-tube tunnel. Construction will take 27 months. Visit www.constructorahispanica.com 31-32/04. The Ministry of public works awarded to Idom Internacional a EUR1.69 million design contract for the new city tunnel in Valencia, through which high speed trains will arrive to the future underground central railway station that will be built south of the existing station. The cross city tunnel will allow trains to arrive and depart from the future station, both northwards and southwards. Currently, the existing station Norte is a dead end where trains can only arrive and depart from the south. The new tunnel will permit arrivals and departures of high speed trains from the north. The access tunnel to the station will be used by high speed, suburban and regional trains on its south section but suburban and regional services will not depart northwards. Visit www.idom.es 31-32/04. Open call for tenders, deadline 21st June, 2005 for construction of section Siete Aguas-Bunol on the high speed line to east of Spain. This 11.2 km section includes three tunnels: Siete Aguas (424 m), La Cabrera (2 x 7.252 m) and Bunol (1.858 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=085094-2005, OJ S 88, or contact ADIF, Madrid, fax +34 917005751. 20/05. Sener secured a EUR1.2 million contract for the design of section Aranjuez-Ocana (12 km) on the Madrid-Castilla La Mancha-Valencia-Murcia high speed line, including a 2.7 km tunnel. Subscribe to E-News Weekly 10/2005. Visit www.sener.es 21/05. Open call for bids, deadline 13th September, 2005 for construction of the 7.9 km Minglanilla-Contreras Dam section. This section includes the Minglanilla tunnel (520 m) and a 746 m tunnel under motorway A-3 to east. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=148589-2005, OJ S 149, or contact ADIF, Madrid, fax +34 917005751. 35/05. Open call for bids, deadline 13th September, 2005 for construction of the 6.5 km Contreras Dam-Villagordo del Cabriel section. This section includes three tunnels: La Roda (1,997 m), El Rabo de la Sarten (376 m) and Umbria de los Molinos (1,503 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=148627-2005, OJ S 149, or contact ADIF, Madrid, fax +34 917005751. 35/05. Open call for bids, deadline 16th September, 2005 for construction of the 7.9 km Monforte del Cid-La Alcoraya section. This section includes the 1,231 m Sierra de las Aguilas tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=148604-2005, OJ S 149, or contact ADIF, Madrid, fax +34 917005751. 35/05. Necso pocketed a EUR75.2 million contract to build the 9.5 km Villagordo del Cabriel-Venta del Moro section, including the 3,340 m Villagordo del Cabriel tunnel. Visit www.necso.es 35/05. FCC and Construcciones Sando received a EUR322.7 million contract from the Ministry of public works to build section Siete Aguas-Bunol on the Madrid-Valencia line, at its arrival in Valencia. This 11.2 km section includes two viaducts and three tunnels: Siete Aguas (424 m), La Cabrera (twin tube of 7,252 m) and Bunol (1,858 m). Visit www.fcc.es and www.sando.net 41/05. ADIF awarded several contracts for construction of several sections of the Madrid-Castilla La Mancha- Valencia-Murcia high speed line. Section Minglanilla-Contreras Dam (7.9 km) has been awarded to a JV set up by Coprosa and Puentes y Calzadas, for EUR72.8 million. Construction time: 26 months. This section includes the Minglanilla tunnel (520 m) and a 746 m tunnel under motorway A-3 to the east coast. Visit www.coprosa.es 44/05. Section Contreras Dam-Villagordo del Cabriel (6.5 km) has been awarded to a JV established by Azvi and Constructora San José, for EUR109.7 million. Construction time: 30 months. This section includes three tunnels: La Roda (1,997 m), El Rabo de la Sarten (376 m) and Umbria de los Molinos (1,503 m). Visit www.azvi.es and www.constructorasanjose.com 44/05. Section Aldaya-Picanya (6.32 km) has been awarded to a JV of Comsa, Vera Construcciones and Cycasa, for EUR83.4 million. Construction time: 22 months. This section includes the Torrent tunnel (2,290 m). Visit www.comsa.com and www.construccionesvera.es 44/05. Section Monforte del Cid-La Alcoraya (7.9 km) has been awarded to a JV of Concisa and Copasa, for EUR53.4 million. Construction time: 21 months. This section includes the Sierra de las Aguilas tunnel (1,231 m). Visit www.copasa.es 44/05. Acciona Infraestructuras scooped a EUR87.2 million contract to build section Villagordo de Cabriel-Venta del Moro on the Madrid-East coast high speed link. This 9.5 km section includes a 3.4 km tunnel which will take 28 months to complete. Visit www.acciona-infraestructuras.es 07/06. Open call for bids, deadline 17th May, 2006 for construction of section Cuenca-Olalla (10.9 km), including the La Loma de Carrascal twin-track tunnel (2,198 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=079308-2006, OJ S 75, or contact ADIF, Madrid, fax +34 917005751. 19/06. Open call for bids, deadline 17th May, 2006 for construction of section Olalla-Arcas del Villar (10.6 km), including the El Bosque twin-track tunnel (3,128 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=079301-2006, OJ S 75, or contact ADIF, Madrid, fax +34 917005751. 19/06. Open call for bids, deadline 17th May, 2006 for construction of section Arcas de Villar-Fuentes (12.4 km), including the La Atalaya and Lo Hueco cut-and-cover tunnels (335 m and 157 m) and the El Cubillo tunnel (1,365 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=079309-2006, OJ S 75, or contact ADIF, Madrid, fax +34 917005751. 19/06. Open call for bids, deadline 26th June, 2006 for construction of section Horcajada-Naharros (4.2 km), which includes the La Horcajada tunnel (3,957 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=099908-2006, OJ S 93, or contact ADIF, Madrid, fax +34 917005751. 22/06. Open call for bids, deadline 26th June, 2006 for construction of section Abia de la Obispalia-Cuenca (6.5 km), which includes the Cabrejos tunnel (2,020 m) and the El Hoyazo cut-and-cover tunnel (290 m). Both will feature a 85 sq m section. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=099905-2006, OJ S 93, or contact ADIF, Madrid, fax +34 917005751. 22/06. Construction of section Cuenca-Olalla (10.9 km) has been awarded to a JV of Aldesa Construcciones, Proacon and Areinsa Arquitectos e Ingenieros for EUR78.3 million and a time frame of 34 months. Noticeable structures within this section include four viaducts and the Loma de Carrascal twin-track tunnel (2,198 m). Visit www.aldesaconstrucciones.es 27/06. Construction of section Olalla-Arcas del Villar (10.6 km) has been awarded to Vias & Construcciones for EUR77 million and a time frame of 32 months. Noticeable structures within this section include one viaduct and the El Bosque twin-track tunnel (3,128 m). Visit www.vias.es 27/06. Construction of section Arcas de Villar-Fuentes has been awarded to Ferrovial Agromán for EUR84.4 million. This 12.4 km section includes one viaduct and three tunnels: La Atalaya (335 m) and Lo Hueco (157 m), both cut-and-cover tunnels, and El Cubillo (1,365 m), a bored tunnel. Visit www.ferrovial.com 28/06. Open call for tenders, deadline 17th August, 2006 for construction of section Sesena-Aranjuez (8.62 km) on the Madrid-Castilla La Mancha-Valencia-Murcia high speed link, including four tunnels: 1.7 km, 800 m, 300 m and 150 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=140684-2006, OJ S 131, or contact ADIF, Madrid, fax +34 917005751. 31-32/06. Acciona Infraestructuras pocketed a EUR80.5 million contract to construct section Horcajada-Naharros (4.2 km), which includes the La Horcajada tunnel (3,957 m). Visit www.acciona.es 36/06. Acciona Infraestructuras and Comsa will build the 26.8 km Camarillas high speed railway bypass between Cieza (Murcia autonomous region) and Hellin (Albacete province). The contract is worth EUR71.3 million. Four tunnels totalling 3.5 km will be built on the section. Visit www.acciona.es and www.comsa.com 45/06. AZVI (50%) and Puentes y Calzadas (50%) won a EUR52.5 million contract to build the 8.6 km Sesena-Aranjuez section on the Madrid-Castilla La Mancha-Valencia-Murcia high speed link, including four tunnels: 1.7 km, 800 m, 300 m and 150 m. Visit www.azvi.es 49/06. Typsa bagged a EUR1.8 million contract for site supervisión during construction of the Camarillas railway bypass between Minateda and Cieza on the Chinchilla-Cartagena line. This section includes four tunnels totalling 3.5 km. Visit www.typsa.es 01-02/07. Open call for tenders, deadline 9th July, 2007 for construction of the 4.7 km Aranjuez-Ontigola section, including the 2,437 m-long 85.7 sq m El Regajal tunnel, whereof 2,080 metres will be mined. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=133047-2007, OJ S 108, or contact ADIF, Madrid, fax +34 917005751. 25/07. Open call for bids, deadline 11th September, 2007 for site supervision for the 4.7 km Aranjuez-Ontigola section, including a 2,437 m-long 85.7 sq m cross-sectional tunnel in El Regajal. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=190935-2007, OJ S 153, or contact ADIF, fax +34 917005751. 33/07. Acciona (75%) and Obras Subterráneas (25%) scooped a EUR113.8 million contract to build the 4.7 km Aranjuez-Ontigola section, including the 2,437 m-long 85.7 sq m El Regajal tunnel, whereof 2,080 metres will be mined. Visit www.acciona.es and www.obrassubterraneas.es 46/07. Open call for tenders, deadline 20th December, 2007 for detailed design of Valencia's cross city high speed rail tunnel. The new cross city railway project in Valencia consists in connecting the central railway station with the Valencia-Barcelona line to the north to convert the station into a through station and eliminate the cul de sac, thus avoiding train movements forth and back in and around the station. The first section of the route runs in an approx. 5 km tunnel from the north station. Then the second section of some four kilometres travels in open air. The project also includes two new urban stations. More in E-News Weekly 47/2007. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=264377-2007, OJ S 217, or contact Ministry of development, Madrid, tel. +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 47/07. Getinsa scooped a EUR2.4 million contract for site supervision for the 4.7 km Aranjuez-Ontigola section, including a 2,437 m-long 85.7 sq m cross-sectional tunnel in El Regajal. Visit www.getinsa.es 50-51/07. Open call for tenders, deadline 7th April, 2008 for construction of the 3.5 km Aspe-El Carrús section in Alicante province on the high speed line to the east coast. The section includes the 1,730 m-long 86 sq m El Murón tunnel, which will be built using conventional methods. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=56803-2008, OJ S 41, or contact ADIF, Madrid, fax +34 917005751. 10/08. Open call for tenders, deadline 21st April, 2008 for construction of the 4.5 km El Carrús-Elche section in Alicante province on the high speed line to the east coast. The section includes the 1,288 m-long 86 sq m Elche tunnel, which will be built using conventional methods. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=56800-2008, OJ S 41, or contact ADIF, Madrid, fax +34 917005751. 10/08. A EUR2.4 million detailed design contract for Valencia's cross city high speed rail tunnel has been awarded to Sener. The first section of the route runs in an approx. 5 km tunnel from the north station. Then the second section of some four kilometres travels in open air. The project also includes two new urban stations. Visit www.sener.es 11/08. Open invitation to tender, deadline 18th August, 2008 for construction management of the 3.5 km Aspe-El Carrús section in Alicante province on the high speed line to the east coast, including the 1,730 m El Murón tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158745-2008, OJ S 119, or contact ADIF, Madrid, fax +34 917005751. 26/08. Pavasal (40%), Obrum (40%) and Nortunel (20%) signed a EUR33.6 million contract to construct the 3.5 km Aspe-El Carrús section in Alicante province on the high speed line to the east coast. The section includes the 1,730 m-long 86 sq m El Murón tunnel, which will be built using conventional methods. Visit www.nortunel.com 26/08. Ferrovial Agromán scooped a EUR49.6 million contract to construct the 4.5 km El Carrús-Elche section in Alicante province on the high speed line to the east coast. The section includes the 1,288 m-long 86 sq m Elche tunnel, which will be built using conventional methods. Visit www.ferrovial.es 26/08. Open invitation to tender, deadline 18th August, 2008 for construction management of the 4.5 km El Carrús-Elche section in Alicante province on the high speed line to the east coast, including the 1,288 m Elche tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=160131-2008, OJ S 120, or contact ADIF, Madrid, fax +34 917005751. 27/08.



Permalink

Open invitation to tender, deadline 30.07.2009, for signalling works in the new railway access tunnel of Torrejon de Velasco-Motilla del Palancar-Valencia/Albacete section of the Madrid-Castilla La Mancha-Comunidad Valenciana-Murcia high speed line. Time limit for receipt of requests for documents or for accessing documents: 23.07.2009. Contract value EUR24.7 million, duration 24 months. Contact P Mardaiz at ADIF, C/Titan, Madrid, tel +34 917744837, fax +34 917745814, e-mail pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158785-2009 29/09.



Permalink

The JV Cobra/Cobra Instalaciones y Servicios/Atil Cobra secured the EUR18.8 million contract, VAT included, for safety equipment in the 33 tunnels on 437.6 km Torrejon de Velasco-Motilla del Palancar-Valencia/Albacete section of AV Madrid-Castiglia La Mancia-Comunití  Valenciana-Murcia line. In the Cabrera tunnel (7,250 m), in addition to the general protections, it will study emergency exits, fire extinguishers and hydrants, detection of fires, emergency lighting and ventilation. Visit www.grupocobra.com. 41/09.



Permalink

Esteyco SAP secured the EUR597,014 contract for informative study of Elche railway line, including duplication of the 1,288 m Elche tunnel and new high speed station connection to the city centre. Contact Direccion General de Infraestructuras Ferroviarias, Madrid, tel +34 915979924, fax +34 915979342, e-mail midorrego@fomento.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=168484-2011. 23/11.



Permalink

Open invitation to tender, deadline 31.07.2012, for assistance service during construction of noise protection on Albacete-Nudo de la Encina and Caudete-Alicante section and the civil protection installations in the tunnels Las Barrancadas (2,856 m), Sierra de las Aguilas (1,227 m), Serreta (301 m) and Canal de Acceso (1,067 m) on the   Albacete-Alicante section on the Madrid-Castiglia La Mancia/Murcia AV line. Contract duration 11 months, value EUR 900,342, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 24.07.2012. Contact Adif, attn Mendez Alvaro, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=189277-2012. 28/12.



Permalink

The JV Thales Espana GRP y Sistemas y Montajes Industriales secured the EUR1.9 million contract, VAT included, for safety equipment in the tunnels Las Barrancadas (2,856 m), Sierra de las Aguilas (1,227 m), Serreta (301 m), and Canal de Acceso (1,067 m) on the 167 km Albacete-Alicante section on the Madrid-Castiglia La Mancia/Murcia AV line. Contract duration 5 months. Click here. Visit www.adief.es. 37/12.



Permalink

Empresas ingeniería civil de Levante, SL (35 %)/Ingeniería de Trazados y Estructuras, SA (Intraesa) (65 %) JV secured the EUR594,225 contract, excluding VAT, for assistance service during construction of noise protection on Albacete-Nudo de la Encina and Caudete-Alicante section and the civil protection installations in the tunnels Las Barrancadas (2,856 m), Sierra de las Aguilas (1,227 m), Serreta (301 m) and Canal de Acceso (1,067 m) on the Albacete-Alicante section on the Madrid-Castiglia La Mancia/Murcia AV line. Contract duration 11 months. Contact Adif, attn Mendez Alvaro, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=354766-2012. 46/12.



Permalink

Open invitation to tender, deadline 18.11.2013, for the integral management of civil protection structures in the tunnels on the high-speed line Madrid-Levante and Albacete-Alicante. Time limit for requests for documents is 15.11.2013. Duration of contract 24 months after award, value EUR1,978,390 excluding VAT. Further information, specs and docs from Adif, att.n Mercedes Lopez de La Fuente, Madrid, tel +34 913007260, fax +34 913006623, e-mail mlfuente@adif.es. Tenders must be sent to Adif, Contract Office, Madrid, tel +34 913007487, fax +34 913006623, e-mail lmortiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=327141-2013. 40/13.



Permalink

The JV Electronic Trafic/Emurtel (Valencia) secured the EUR948,519 contract, excluding VAT, for the integral management of civil protection structures in the tunnels on the high-speed line Madrid-Levante and Albacete-Alicante. Contact Adif, att.n Mercedes Lopez de La Fuente, Madrid, tel +34 913007260, fax +34 913006623, e-mail mlfuente@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=070448-2014. 11/14.



Permalink

Open invitation to tender, deadline 07.01.2015, for installation and maintenance of safety equipment in tunnels of the Madrid-Castilla La Mancha-Comunidad Valenciana-Murcia high speed line, section Monforte del Cid-Murcia. The 61.7 km-long section includes four tunnels among which Elche (1,288 m) and El Muron (1,730 m). Value of contract EUR8.85 million, excluding VAT. Duration of contract 42 months from award. Time limit for receipt of requests for documents or for accessing documents: 31.12.2014. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=381736-2014. Ref. n. 4.14/20830.0060–OM 004/14. 46/14.



Permalink


Prior information notice for equipment maintenance in the tunnels on the Madrid-Valencia and Albacete –Alicante high speed lines. Value of the contract is EUR2.55 million, excluding VAT. Duration of the contract is 48 months. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Click here for tender documents, here for tenders to be sent and here for further on the TED tender. 19/21. 

 




Permalink


Asociacion de Accion Ferroviaria (Cetren) from Madrid have secured the contracts for 9 lots for CE validation  of interoperability of the infrastructure and/or energy subsystems on the new high speed railway sections: 

  • Lot1: Olmedo-Zamora-Pedralba, value of the contract EUR355,000, excluding VAT; 
  • Lot 2: Valladolid-Leon/Venta de Banos-Burgos, value of the contract EUR495,000, excluding VAT; 
  • Lot 3: Antequera-Granada, value of the contract EUR188,000, excluding VAT; 
  • Lot 4: La Robla-Pola de Lena, value of the contract EUR249,000, excluding VAT;
  • Lot 5: Castellbisbal-Tarragona (Vilaseca)-Vandellos-Castellon-Valencia, value of the contract EUR664,000, excluding VAT;
  • Lot 6: Monforte del Cid-Murcia-Alicante (Cambiador Encina)-Jativa-Valencia, value of the contract EUR305,000, excluding VAT;
  • Lot 7: Plasencia-Badajoz, , value of the contract EUR170,000, excluding VAT; 
  • Lot 8: Vigo-Santiago-la Coruna-Orense-Santiago, value of the contract EUR567, 000, excluding VAT; 
  • Lot 9: Tunnel AV Atocha-Chamartin, , value of the contract EUR43,459, excluding VAT. 

Contact  Adif Alta Velocidad, attn Francisco Macias Bonilla, Madrid, tel +34 661347788,  email fmacias@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120827-2022. Ref.n. 3600000039. 11/22.




Permalink

Open invitation to tender, deadline 25/04/2022, for the comprehensive management service for civil protection equipment  in the tunnels on the Madrid-Valencia-Alicante High-Speed Line and the Valencia-La Encina section. Click here for tender documents and here where tenders must be sent. Value of the contract is EUR2,996,000, excluding VAT. Duration of the contract will be  48 months. Contact Adif, attn David Fernandez Ramirez, Madrid, tel +34 913007453,  email david.fdez@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=165941-2022. Ref.n. 2.21/21506.0032. 13/22. 

  



Permalink


Sistemas y Montajes Industriales SA from Getafe secured the EUR2.05 million contract, excluding VAT, for the comprehensive management service for civil protection equipment  in the tunnels on the Madrid-Valencia-Alicante High-Speed Line and the Valencia-La Encina section. Contact Adif, attn David Fernandez Ramirez, Madrid, tel +34 913007453,  email david.fdez@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=506573-2022. Ref.n. 2.21/21506.0032. 37/22.  



Permalink


The Joint venture ADIF tunel del Regajal (composed by Contrastas Vilor SL, Martin Holgado Obra Civil SLU and Actividades de infrastructuras publicas y conservacion SL) secured the EUR 4.83 million contract, excluding VAT, for the monitoring and the environmental maintenance around the Regajal tunnel. For further information in the project, click here. Contact Adif Alta Velocidad, Madrid, tel +34 913007453, email jrodrigo@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/202940-2024. Ref.n. 4.23/20810.0046. 14/24.

 




Permalink

Page: