Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Spain

Spain, Palencia-Santander - es/115

High Speed Railway

Open call for bids, deadline 21st April, 2004 for design of section Reinosa-Los Corrales de Buelna on the high speed line from Palencia to Santander. This section is 34 km in length, of which 74% in tunnel. Tender budget: EUR650,000. Time frame: 18 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=043485-2004, OJ S 51, or contact Ministry of public works, Madrid, fax +34 915979342. E-mail marubio@mfom.es 14/04.



Permalink

Aecom Inocsa SL secured the EUR397,956 contract, excluding VAT, for the design and the hydrogeological monitoring of tunnels on the Alar del Rey-Aguilar de Campo section, on the high speed line from Palencia to Santander. Contact Adif Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit

http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=271749-2018

and

https://contrataciondelestado.es/wps/wcm/connect/d5670a86-b174-4dbf-b58b-635d5ae1d681/DOC_CAN_ADJ2018-094322.pdf?MOD=AJPERES.

25/18.



Permalink

Spain, Bilbao - es/114

Railway

Iberinsa and LKS Ingenierí­a won a EUR370,000 contract to design the alignment of a new rail tunnel under Mount Artxanda in Bilbao. It would be a single-tube two-track tunnel, about 2 km in length. Visit www.iberinsa.es 11/04.Open call for tenders, deadline 1st September, 2006 for design of the tunnel under Mount Artxanda. The project forms part of the future connection between Bilbao and Loiu airport. A twin-track tunnel, of about 1.8 km, is envisaged. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=140668-2006, OJ S 131, or contact Red Ferroviaria Vasca, Bilbao, fax +34 944329189. E-mail ets@ets-rfv.es 29/06.Esteyco secured a EUR416,250 contract to design a 1.8 km twin-track tunnel under Mount Artxanda, as part of the future connection between Bilbao and Loiu airport. Visit www.esteyco.es 05/07.Periodic notice, deadline unspecified, being a call for bids aiming at reducing time limits for the receipt of tenders, for construction of the new Artxanda tunnel, including a 1.9 km dual-track rail tunnel and 700 metres of cut-and-cover tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=36591-2008, OJ S 27, or contact ETS-RFV, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 07/08.Open invitation to tender, deadline 21.12.2009, for geotechnical consultancy for the construction of Metro Line 3 and rail tunnel Artxanda in Bilbao. Contract duration 36 months, estimated cost EUR537,000. Contact Arantza Diaz de Cerio Garcí­a at ETS-RFV in Bilbao, tel +34 9465726-00, fax -01, e-mail ets@ets-rfv.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=299444-2009. 45/09.The JV Inge Plan Consulting S.L.-Prointec SA has secured the EUR2 million contract for construction supervision services on Casco Viejo-Matiko section of Line 3 of Bilbao Metro and rail tunnel Artxanda in Bilbao. Contact Arantza Diaz de Cerio Garcí­a at ETS-RFV in Bilbao, tel +34 9465726-00, fax -01, e-mail ets@ets-rfv.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=016309-2010. 05/10.



Permalink

Open invitation to tender, deadline 19.05.2014, for repair and maintenance services for electromechanical pumps and valves installed in tunnels and other locations of ETS railway and tramway lines. Contract value EUR378,903.72, excluding VAT. Contract duration 48 months from award. Time limit for receipt of requests for documents or for accessing documents: 12.05.2014 . Contact Ente Publico Euskal Trenbide Sarea, att.n Arantza Díaz de Cerio Garcia, Bilbao, tel +34 946572600, e-mail ets@ets-rfv.es. Electronic access to information at http://www.contratacion.euskadi.net/w32-1084/es/contenidos/anuncio_contratacion/expjaso3418/es_doc/es_arch_expjaso3418.html?ruta=http://www.contratacion.euskadi.net/w32-1081/es/v79aWar/comunJSP/v79aHome.jsp. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=104277-2014. Ref. n. P20012621. 13/14.



Permalink

Fire-Prot SA of Vizcaya (ES) secured the EUR171,894 contract, excluding VAT, for repair and maintenance services for electromechanical pumps and valves installed in tunnels and other locations of ETS railway and tramway lines. Contact Ente Publico Euskal Trenbide Sarea, att.n Arantza Diaz de Cerio Garcia, Bilbao, tel +34 946572600, fax +34 946572601, e-mail ets@ets-rfv.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=261454-2014. Ref. n. P20012621. 31/14.



Permalink

Open invitation to tender, deadline 22/10/2019, for maintenance services for pumps installed in tunnels and other locations of ETS railway and tramway lines. Contract value EUR 708,749.13  excluding VAT. Contract duration 48 months. For bid documents http://www.contratacion.euskadi.eus/. Contact ETS - Euskal Trenbide Sarea, Bilbao, tel +34 946572600, fax +34 946572601, email ets@ets-rfv.eus. For bid documents click here.

Ref. n. P20019512. 38/19.



Permalink


Open invitation to tender, deadline 12/04/2021, for the maintenance of Galea Electric's WireWatch anti-theft systems in the following tunnels:  Miraflores 1 (314 m), Miraflores 2 (314 m) , Markarte (1443 m, double ways), Santa Marina (612 m),  Eibar (249 m), Karakate (512 m), Carquizano (393 m), Irurain (250 m) and Santa Catalina (979 m) on Bilbao-Donostia/San Sebastian railway line, Autzagane (749 m) on Amorebieta - Bermeo line and old Artxanda on Deusto-Lezama line, used as new Artxanda tunnel ‘s safety tunnel on metro Line 3. Click here for tender documents and where tenders must be sent. Value of the contract EUR308,560, excluding VAT. Duration of the contract 48 months. Contact ETS, Bilbao, tel +34 946572600, fax +34 946572601, email ets@ets-rfv.es. For further in TED tender, please click here. Ref.n. P20021499. 14/21. 

 




Permalink


Bidezain SL from Getxo secured the EUR208,400 contract, excluding VAT, for  the maintenance of Galea Electric's WireWatch anti-theft systems in the following tunnels:  Miraflores 1 (314 m), Miraflores 2 (314 m) , Markarte (1443 m, double ways), Santa Marina (612 m),  Eibar (249 m), Karakate (512 m), Carquizano (393 m), Irurain (250 m) and Santa Catalina (979 m) on Bilbao-Donostia/San Sebastian railway line, Autzagane (749 m) on Amorebieta - Bermeo line and old Artxanda on Deusto-Lezama line, used as new Artxanda tunnel ‘s safety tunnel on metro Line 3. Contact ETS, Bilbao, tel +34 946572601, email kontratazioa@ets-rfv.eus. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=020705-2022. Ref.n. P20021499. 03/22.



Permalink

Spain, Andalusia - es/113

Highway

Invitation to tender imminent, further to government approval, for construction of the second carriageway on highway A-4, direction Seville-Madrid, through Despeí±aperros, section Venta de Cí¡rdenas-Santa Elena, in Jaen and Ciudad Real provinces. Length is 8.8 km and time frame of 42 months. Tender budget: EUR110.94 million. The alignment runs through the Despeí±aperros National Park and requires the construction of six tunnels: Las Lomas (215 m), La Aliseda (370 m), Las Tinajuelas (980 m), this one being a twin bore, La Cantera (390 m), Despeí±aperros (1.850 m) and El Corzo (372 m). All tunnels to accommodate two 2.5 m-wide lanes plus two pavements, 2.5 m and one metre, except Despeí±aperros and El Corzo which will accommodate three 3.5 m-wide lanes plus two one metre pavements. The budget for tunnelling accounts for 70% of the tender budget. 08/04.Open call for bids, deadline 4th May, 2004 for construction of a 8.5 km section of highway A-4, direction Cadiz-Madrid, between Santa Elena and Venta de Cardenas in Despenaperros. Includes five single-tube tunnels (215 m, 370 m, 390 m, 1,850 m and 372 m) and one twin-tube tunnel (980 m). Tender budget for tunnels: EUR42.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=041890-2004, OJ S 49, or contact Ministry of public works, Madrid, fax +34 915978537 or 8470. E-mail plicas-carreteras@mfom.es 12/04.Open call for bids, deadline 6th July, 2004 for work control and construction management of section Venta de Cardenas-Santa Elena in Despenaperros in Jaen province. Four single-tube tunnels must be built (215 m, 370 m, 390 m, 1.850 m and 372 m) and one 980 m twin bored tunnel. Tender budget: EUR2.6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=079867-2004, OJ S 100, or contact Ministry of public works, Madrid, fax +34 915978537 or 8470. E-mail cpublic@mfom.es 23/04.FCC has scooped a EUR79.1 million contract to build the new Despenaperros carriageway on the Venta de Cardenas-Santa Elena section of the south highway A-4. Building of this 8.9 km section will take 40.5 months. Along the route, there are tunnels in Las Lomas (215 m), La Aliseda (370 m), Tinajuelas (980 m), which will be a twin bored tunnel including the main tunnel and its parallel safety tunnel, La Cantera (390 m), Despenaperros (1,850 m), also a twin bore with a parallel safety tunnel, and El Corzo (372 m). Despenaperros and El Corzo will be three-lane tunnels. The six tunnels total 4,618 m. The tunnels account for approximately 70% of the total cost of the project. Visit www.fcc.es 42/04.Aepo secured a EUR1.9 million contract for work control and supervision during construction of the new Despenaperros carriageway on the Venta de Cardenas-Santa Elena section (8.9 km) of the south highway A-4. Includes six tunnels totalling 4,618 m. Visit www.aepo.es 02/05.Open invitation to tender, deadline 13th May, 2008 for construction of the southbound carriageway on the southern motorway A-4, section Venta de Cí¡rdenas-Santa Elena. This 9 km section includes the 166 m La Cantera tunnel and the 1,823 m Despeí±aperros tunnel, which is a three-lane tunnel. The tunnels will be constructed in slates, sandstone and quartzites. The drill and blast method in a top heading / bench sequence will be adopted as per NATM along with a mechanical excavator in weaker areas where canopies of steel pipes will be installed. The primary support will consist of fibre-reinforced shotcrete, bolts and/or steel arches. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=63521-2008, OJ S 46, or contact Ministry of development, Madrid, fax +34 915978547 or 915978470. E-mail jmmendoza@fomento.es or cpublic@fomento.es 11/08.The Ministry of development awarded FCC a EUR97 million contract for the construction of the southbound carriageway on the southern motorway A-4, section Venta de Cí¡rdenas-Santa Elena. This 9 km section includes the 166 m La Cantera tunnel and the 1,823 m Despeí±aperros tunnel, which is a three-lane tunnel. Click es/113 for more details. Visit www.fcc.es 31/08.



Permalink

Spain, Madrid - es/112

Drinking Water

Open invitation to tender, deadline 5th March, 2004 for design of the fourth section of the second main drinking water supply ring to the Community of Madrid, which will require a 2 km-long tunnel, 2 to 2.3 m in diameter, running parallel to an existing tunnel between Madrid and El Escorial, northwest of the city. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=007762-2004, OJ S 9, or contact Aguas de la Cuenca del Tajo, Madrid, fax +34 915352377. 05/04.Apia XXI won a EUR872,700 contract for designing the fourth section of the second main water supply ring in the Madrid metropolitan area, which includes a 2 km-long 2-2.3 m-diameter tunnel. Visit www.apiaxxi.es 18/04.



Permalink

Spain, Balearic Islands - es/111

Road

Public hearings are under way for the Sa Mola tunnel project in the port of Soller. Entrance to this 1,329 m tunnel will be located on the harbour road. The tunnel will provide rapid access to Plaza de los Reis de Mallorca through the Sa Mola hill. The project, which total length is 2,274 m, requires to cover 546 m of the Sa Figuera torrent. The scheme is for a two-way carriageway, 11.5 m in width, accomodating two 3.5 m-wide lanes plus two 1.5 m-wide pavements. Promociones y Proyectos S.L. is the designer. But the final design will be reviewed by the construction company. Work to start in October 2004 for completion at spring 2006. Cost: EUR21.7 million. 04/04.Open call for bids, deadline 20th September, 2004 for design and construction of the 1,329 m Sa Molla tunnel to access to Soller harbour in Mallorca, Balearic Islands. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=132583-2004, OJ S 153, or contact Government of the Balearic Islands, Palma de Mallorca, fax +34 971176964 or 6803. 35/04.A JV set up by Comasa and Obras Subterraneas will construct the Sa Mola tunnel, which will give access to Soller through the rear part of the city thus avoiding to drive along the seaside and relieving traffic in the area. The tunnel will cost EUR21.5 million and will take 15 ½ months to build. The new road spans 2.2 km, whereof 1,329 m correspond to the tunnel. It is a 11.5 m-wide tunnel with two 3.5 m-wide lanes and shoulders. Visit www.obrassubterraneas.es 49/04.



Permalink

Open call for bids, deadline 13.02.21012 for equipment maintenance from 2012 to 2015 in the Son Vic and 1,329 m Sa Molla tunnels in Mallorca. Contract value EUR1.2 million, including VAT. Contact Departamento de Urbanismo y Territorio del Consell de Mallorca, attn Pere Josep Rosinol Andreu, Mallorca, tel +34 971173592, fax +34 971219988, e-mail contractacioop@conselldemallorca.net. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=004938-2012. Bid Code 26/2011. 02/12.



Permalink


Open invitation to  tender,  deadline 23/02/2021, for equipment maintenance in the Son Vic tunnel (840 m) and for the lining refurbishment of tunnels at Peguera on the km 21,000-km 25,000 section of the M1-1. Contract value EUR6.61 million, including VAT. Duration of the contract 12 months.  Pleno del Consejo Insular de Mallorca,  Palma, email abenlloch@conselldemalloca.net.  For further on the tender, please click here and here. Ref.n.  2020/64/OBR. 04/21.

 




Permalink

Spain, Castilla & Leí³n - es/110

High Speed Railway

Open call for bids, deadline 20th January, 2004 for design of the Zamora-Lubií¡n section, subsection Cernadilla-Pedralba de la Praderí­a. This subsection includes two tunnels in Otero (1.062 m) and Puebla (1.084 m). Tender budget: €2.1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=es&docid=216432-2003, OJ S 243, or contact Ministerio de Fomento, Madrid, fax +34 91 5979342 or 8470. E-mail vrpascual@mfom.es or cpublic@mfom.es 02/04.Open call for bids, deadline 19th February, 2004 for design of the Pedralba de la Praderia-Lubian subsection. Includes tunnels in Pedralba (1,659 m), Requejo (2,600 m), Padornelo (5,971 m) and Aciberos (200 m). Tender budget: EUR2.7 million. Time frame: 14 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=011767-2004, OJ S 14, or contact Ministry of public works, Madrid, fax +34 915979342 or 8470. E-mail vrpascual@mfom.es or cpublic@mfom.es 06/04.Typsa has secured a EUR1.8 million contract to design the Cernadilla-Pedralba de la Praderia section on the Zamora-Lubian line, which includes the Otero and Puebla tunnels, 1,062 m and 1,084 m. www.typsa.es 15/04.Getinsa and Geocontrol have secured a EUR1.8 million contract to design the Pedralba de la Praderia-Lubian subsection on the Zamora-Lubian section of the Madrid-Galicia high speed line. This subsection includes four tunnels: Pedralba (1,659 m), Requejo (2,600 m), Padornelo (5,971 m) and Aciberos (200 m). Visit www.getinsa.es and www.geocontrol.es 26/04.Open call for tenders, deadline 11th June, 2007 for geological and geotechnical studies for the Venta de Baí±os junction in Palencia province. The section is 24.9 km long and includes two tunnels of 2,175 metres. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=99347-2007, OJ S 81, or contact ADIF, Madrid, fax +34 917004700. 18/07.Open invitation to tender, deadline 5th February, 2008 for design of the 27 km Venta de Baí±os section, including two tunnels of 1.1 km each. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=1052-2008, OJ S 1, or contact ADIF, Madrid, fax +34 917005751. 04/08.AEPO secured a EUR2.3 million contract to design the 27 km Venta de Baí±os section on the Valladolid-Burgos-Venta de Baí±os-Palencia line. There are two tunnels, each 1.1 km in length. Visit www.aepo.es 20/08.



Permalink

Pre-information notice for construction of the Pedralba de la Praderia-Padornelo tunnel subsection on the Zamora-Lubian section of the Madrid-Galicia high-speed line. Tender budget: EUR132.8 million. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215018-2009 or contact Seitt S.A. (Sociedad Estatal de Infraestructuras del Transporte Terrestre), Madrid, attn José Manuel Dorrego Iglesias, tel +34 9159166-29, fax -30, e-mail jmdorrego@seitt.es. For more on this project visit es/110 and www.fomento.es/NR/rdonlyres/A65E2FE8-5CC9-4E0B-A60E-1FE9DC239CEF/51841/09071801.pdf. 38/09.



Permalink

Open invitation to tender, deadline 28.04.2010, for construction services, Padornelo tunnel-Cerdedelo section, AV Madrid-Galicia line. Contract value EUR1.35 million. Contact Adif, c/ Titan, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es or pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=069437-2010. 12/10.Open invitation to tender, deadline 28.04.2010, for safety and health co-ordination, section Lubian-Orense, AV Madrid-Galicia line. Contract value EUR2.2 million. Contact Adif, c/Titan, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es or pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=071252-2010. 11/10.



Permalink

Open invitation to tender, deadline 22.08.2011, for construction of 3.2 km-long Lubian-Canda tunnel railway section, including Hedroso (913 m) and Lubian (1,710 m) tunnels. Contract value EUR99.4 million not including VAT, duration 32 months. Time limit for access to documents 16.08.2011. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Click here and visit http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=210773-2011, GU S 127. 28/11.



Permalink

Open invitation to tender, deadline 21.09.2011, for the construction of Requejo-Padornelo tunnel section on the Madrid-Galicia high speed line, including the 2,404.5 m-long Requejo tunnel. Contract value EUR72.5 million excluding VAT, duration 33 months. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=252471-2011 and http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/21EF6FA512BB7545C12578D100314910?Opendocument. 35/11.



Permalink

Open invitation to tender, deadline 26.10.2011, for assistance services during the construction of Requejo-Padornelo tunnel section on the Madrid-Galicia high speed line, including the 2,404.5 m-long Requejo tunnel. Contract value EUR3 million excluding VAT, duration 37 months. Time limit for receipt of requests for documents or for accessing documents 19.10.2011. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=286077-2011. 42/11.Open invitation to tender, deadline 26.10.2011, for assistance services during construction of 3.2 km-long Lubian-Canda tunnel railway section, including Hedroso (913 m) and Lubian (1,710 m) tunnels. Contract value EUR3 million excluding VAT, duration 36 months. Time limit for access to documents 19.10.2011. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=286074-2011. 42/11.



Permalink

The Jv Aldesa Construcciones/Coalvi/Proacon secured the EUR94 million contract for construction of 3.2 km-long Lubian-Canda tunnel railway section, including Hedroso (913 m) and Lubian (1,710 m) tunnels. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Click here and visit www.adif.es .46/11.



Permalink

Open invitation to tender, deadline 28.12.2011, for the construction of the platform of the Padornelo tunnel-Lubian section on the Madrid-Galicia high speed railway, North-North East corridor. Contract value EUR113.2 million excluding VAT. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail: mjmoro@adif.es, fax +34 917745814. Visithttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=355258-2011. 46/11.



Permalink

Open invitation to tender, deadline 28.12.2011, for assistance services during construction of the new 7.5 km tunnel di Padornelo-Lubian (Zamora) section on the high-speed line Madrid-Galicia, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense, including the new right tube of 6.4 km tunnel and the bypasses with the existing tube. Time limit for receipt of requests for documents or for accessing documents: 21.12.2011. Contract value EUR3.8 million excluding VAT, duration 46 months. Contact Adif, c/o Titan, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=356782-2011. 47/11.



Permalink

The JV Aldesa Construcciones (60%), Coalvi (20%) and Proacon (20%) secured the EUR79.7 million contract, VAT not included, for construction of 3.2 km-long Lubian-Canda tunnel railway section, including Hedroso (913 m) and Lubian (1,710 m) tunnels. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=391827-2011. 02/12.



Permalink

JV Ferrovial Agroman/Compania de Obras Castillejos secured the EUR108.8 million contract, VAT included, for railway construction on the Padornelo tunnel-Lubian section on the Madrid-Galicia high speed railway, north-north east corridor. Contact Adif C/Titan, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit

http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/E1A6497348B58C41C12579B1002C9411?Opendocument and www.ferrovial.com. 10/12.



Permalink

The JV Tecnica y Proyectos e Intecsa-Inarsa secured the EUR3,263,484 contract for assistance services during construction of the new 7.5 km-long tunnel di Padornelo-Lubian (Zamora) section on the high-speed line Madrid-Galicia, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense, including the new right tube of an existing 6.4 km-long tunnel and connecting crosspassages. Contact Adif, c/o Titan, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/CB272AB7D500824AC12579B5002D4F6B?Opendocument, www.typsa.es and www.intecsa-inarsa.es. 10/12.



Permalink

Open invitation to tender, deadline 21.06.2012, for construction of the platform of the left track 7.3 km-long tunnel de la Canda section, on Madrid-Galicia high-speed railway, North-North West corridor. Contract value EUR105.14 million, VAT not included, duration 35 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142756-2012. 19/12.



Permalink

Open invitation to tender, deadline 21.06.2012, for construction of the platform of the right track 7.4 km-long tunnel de la Canda section on the Madrid-Galicia high speed railway, North-North West corridor. Contract value EUR110.9 million, VAT not included, duration 35 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142757-2012. 19/12.



Permalink

The JV Ferrovial Agroman (70 percent)/Castillejos Compania de Obras (30 percent), has been awarded the EUR92.27 million contract, VAT not included, for construction of the platform of the Padornelo tunnel-Lubian section on the Madrid-Galicia high speed railway, North-North West corridor. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es, fax +34 917745814. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=130526-2012. 19/12.



Permalink

The JV Puentes y Calzadas Infraestructuras (90 percent)/Geotunel (10 percent) has been awarded the EUR58.2 million contract, VAT not included, for construction of the platform of the Requejo-Tunel de Padornelo section on the Madrid-Galicia high speed railway, North-North West corridor. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es, fax +34 917745814. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=093914-2012. 19/12.



Permalink

The JV SA de Obras y Servicios Copasa (40 percent)-Copisa Constructora Pirenaica SA (40 percent)-Sercoysa Proyectos y Obras, SA (10 percent)-Covsa (10 percent) secured the EUR74.99 million contract, VAT not included, for construction of the platform of the left track 7.3 km-long tunnel de la Canda section, on Madrid-Galicia high-speed railway, North-North West corridor. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=288096-2012. 38/12.



Permalink


Open invitation to tender, deadline 18.01.2016, for the design of civil protection and safety equipment in the tunnels of the Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. The section includes the tunnels Espino (7.9 km and 7.8 km), O Canizo (5.4 km and 5.4 km), A Canda (7.3 km and  7.3 km) as well as the Padornelo-Lubian (7.3 km and 7.3 km). The contract value is EUR 457,201.03, VAT not included, duration of the contract is 12 months. The time limit for accessing documents is until the 11.01.2016. Contact Adif C/Hiedra, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=422603-2015. Ref.n. 3.15/20830.0195 - P 010/15. 49/15.




Permalink


Open invitation to tender, deadline 21.03.2017, for quality control tests on materials used at the Cernadilla – Pedralba - Tunel de Padornelo section, on  the Madrid-Galicia high-speed line. This section includes two tunnels in Otero (1145 m) and Puebla (1499 m), Pedralba (1700 m) de la Praderia e Requejo (2405 m). The value of the contract EUR502,343.47 excluding VAT. The duration of the contract is 15 months. Contact Adif Alta Velocidad, Madrid, tel +34 917744804, fax +34 917745814, email mjmoro@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=es&docid=038081-2017. Ref.n. 3.16/20830.0248 (AV 028/16). 05/17.




Permalink

Prior information notice without call for competition for the project to provide protection and safety equipment in the tunnels of the Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. Value of the contract is EUR32.23million, excluding VAT. Duration of the contract 15 months from award.

Contact Adif-Alta Velocidad, Madrid, tel  +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185758-2018.

27/18.



Permalink

Elecnor SA from Madrid secured the  EUR27.31 million contract, excluding VAT, for  the design and maintenance of civil protection and safety equipment in the tunnels of the Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=111179-2019.

Ref.n. 4.18/20830.0283 – OM 001/18. 11/19.



Permalink


Asociacion de Accion Ferroviaria (Cetren) from Madrid have secured the contracts for 9 lots for CE validation  of interoperability of the infrastructure and/or energy subsystems on the new high speed railway sections: 

  • Lot1: Olmedo-Zamora-Pedralba, value of the contract EUR355,000, excluding VAT; 
  • Lot 2: Valladolid-Leon/Venta de Banos-Burgos, value of the contract EUR495,000, excluding VAT; 
  • Lot 3: Antequera-Granada, value of the contract EUR188,000, excluding VAT; 
  • Lot 4: La Robla-Pola de Lena, value of the contract EUR249,000, excluding VAT;
  • Lot 5: Castellbisbal-Tarragona (Vilaseca)-Vandellos-Castellon-Valencia, value of the contract EUR664,000, excluding VAT;
  • Lot 6: Monforte del Cid-Murcia-Alicante (Cambiador Encina)-Jativa-Valencia, value of the contract EUR305,000, excluding VAT;
  • Lot 7: Plasencia-Badajoz, , value of the contract EUR170,000, excluding VAT; 
  • Lot 8: Vigo-Santiago-la Coruna-Orense-Santiago, value of the contract EUR567, 000, excluding VAT; 
  • Lot 9: Tunnel AV Atocha-Chamartin, , value of the contract EUR43,459, excluding VAT. 

Contact  Adif Alta Velocidad, attn Francisco Macias Bonilla, Madrid, tel +34 661347788,  email fmacias@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120827-2022. Ref.n. 3600000039. 11/22.



Permalink

Spain, Madrid - es/109

Metro Norte

  www.comadrid.es/012 02/04.Open call for bids, deadline 2nd February, 2004 for design of the Metro Norte, section 2. Tender budget: €2 million. Metro Norte is a new 12.6 km metro line with 12 stations from Fuencarral to Alcobendas and San Sebastií¡n de los Reyes through Tres Olivos, Pau Montecarmelo and Pau de las Tablas. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=214932-2003, OJ S 241, or contact Mintra, Madrid, fax +34 914880598 or 914111724. Visit www.comadrid.es/012 02/04.Open call for bids, deadline 17th August, 2004 for construction of Metronorte, north of Madrid, section 1A. Tender budget: EUR49 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=116686-2004, OJ S 136, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 17th August, 2004 for construction of Metronorte, north of Madrid, section 1B. Tender budget: EUR119.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=116693-2004, OJ S 136, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 19th August, 2004 for construction of Metronorte, north of Madrid, sections 1C and 2A. Tender budget: EUR154.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=116695-2004, OJ S 136, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 19th August, 2004 for construction of Metronorte, north of Madrid, section 2B. Tender budget: EUR145 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=116695-2004, OJ S 136, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 3rd September, 2004 for inspection and work control during construction of Metronorte, section 1A. Tender budget: EUR2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123377-2004, OJ S 143, or contact Mintra, Alcorcon, fax +34 916890069. 33-34/04.Open call for bids, deadline 17th September, 2004 for quality control during construction of Metronorte, section 1A. Tender budget: EUR355,650. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=126436-2004, OJ S 146, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for bids, deadline 3rd September, 2004 for inspection and work control during construction of Metronorte, section 1B. Tender budget: EUR2.1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123376-2004, OJ S 143, or contact Mintra, Alcorcon, fax +34 916890069. 33-34/04.Open call for bids, deadline 17th September, 2004 for quality control during construction of Metronorte, section 1B. Tender budget: EUR692,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=126441-2004, OJ S 146, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for bids, deadline 6th September, 2004 for inspection and work control during construction of Metronorte, sections 1C and 2A. Tender budget: EUR2.6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123389-2004, OJ S 143, or contact Mintra, Alcorcon, fax +34 916890069. 33-34/04.Open call for bids, deadline 20th September, 2004 for quality control during construction of Metronorte, sections 1C and 2A. Tender budget: EUR894,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=126447-2004, OJ S 146, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for bids, deadline 6th September, 2004 for inspection and work control during construction of Metronorte, section 2B. Tender budget: EUR2.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123390-2004, OJ S 143, or contact Mintra, Alcorcon, fax +34 916890069. 33-34/04.Open call for bids, deadline 20th September, 2004 for quality control during construction of Metronorte, section 2B. Tender budget: EUR841,200. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=126433-2004, OJ S 146, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Teconsa, Obrum and Arias Hermanos will build section 1A (Tres Olivos-Monte Carmelo) on the north metro line running from PAU de Montecarmelo to PAU de Las Tablas. The section includes a 818 m tunnel and a new station, to connect Line 10 with the Metronorte. The contract is worth EUR42.7 million. Time frame for construction: 20 months. Visit www.teconsa.net and www.obrum.com 50/04.Section 1B (Monte Carmelo-Las Tablas), 4.6 km in length with three stations, and section 1C-2A (Las Tablas-La Chopera), 5.4 km in length with three stations, have been awarded to Necso for EUR112.2 million and EUR143.6 million respectively. Visit www.necso.es 50/04.OHL will build section 2B running from La Chopera to San Sebastian de los Reyes (5 km, four stations) for EUR137 million. It is a 5,050 m single bore tunnel serving stations in Hospital, Plaza de Toros, Lomas del Rey, in San Sebastian de los Reyes, and Manuel de Falla, in Alcobendas. OHL will use a new Herrenknecht EPB shield. The tunnel outside diameter is 9.08 m while the inner diameter is 8.44 m. Lining with precast concrete segments (7 segments per ring including the key segment). Mucking-out with loco and muck cars. TBM to arrive in January 2005 for tunnelling start in March 2005. Visit www.herrenknecht.com and www.ohl.es 50/04.



Permalink

Spain, Barcelona - es/108

Highway

Open call for bids, deadline 14th October, 2003 for construction of the 2.2 km Vallirana bypass on road N-340 in Barcelona province, including a 1.3 km twin tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=157716-2003, OJ S 174, or contact Ministry of development, Madrid, fax +34 915978537 or 8470. E-mail plicas-carreteras@mfom.es. Read E-News Weekly 37/2003. 40/03.Open call for bids, deadline 20th January, 2004 for work control and construction supervision of the Vallirana bypass on the Mediterranean highway A-7. Includes a twin 1.3 km tunnel to accommodate two 3.5 m-wide lanes, two shoulders (2.5 m and 1 m) and two 0.75 m-wide pavements. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=200542-2003, OJ S 224, or contact Ministry of public works, Madrid, fax +34 915978537 or 8470. E-mail cpublic@mfom.es or plicas-carreteras@mfom.es. Read E-News Weekly 37/2003. 48/03.FCC in JV with Servia Canto have won a EUR49.4 million contract to build the 2.2 km Vallirana bypass on road N-340. Includes a 2 x 1.3 km tunnel. Read E-News Weekly 37/2003. Visit www.fcc.es and www.servia-canto.com 09/04.Cicsa and Auding have secured the work control and construction management of the Vallirana bypass, for EUR1.4 million. This bypass requires to build a 1.3 km double tunnel. Visit www.cicsa.es and www.auding.com 27/04.



Permalink

Spain, Bilbao - es/107

Metro

Open call for bids, deadline 20th October, 2003 for design of the Etxebarri-Otxarkoaga-Txurdinaga-Old Town connection on the Bilbao-Durango rail line. Length is 5,209 m, fully underground except 570 m in open cut for a single double-track tunnel. Also three mined stations in Etxebarri, Otxarkaoga and Zurbarambarri. Tender value : €1.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=151626-2003, OJ S 165, or contact Basque government, Vitoria-Gasteiz, fax +34 945019786. E-mail imebisa@imebisa.es and m-castejon@ej-gv.net 39/03.Idom received a EUR180,000 contract for E&M equipment design for the third metro line of the Bilbao metro. The 5,750 line, of which 4,352 m in mined twin-track tunnel, 223 m in cut and cover and 487 m in open cut, includes four mined stations (Otxarkoaga, Txurdinaga, Zurbarranbarri, Uribarri) and two open cut stations (San Antonio de Etxebarri and Casco Viejo). Read E-News Weekly 37/2007 & 11/2005. Visit www.idom.es 45/07.Periodic notice, deadline unspecified, being a call for bids aiming at reducing time limits for the receipt of tenders, for construction of 2,700 metres of the Etxebarri-Txurdinaga section of Line 3 of the Bilbao subway and two stations in cavern (Txurdinaga and Otxakoaga). Read E-News Weekly 37/2007. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=35192-2008, OJ S 26, or contact ETS-RFV, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 07/08.



Permalink

Open invitation to tender, deadline 15.09.2009, for construction of the Uribarri section of Line 3 of Bilbao Metro. Contract value EUR32.8 million, duration 36 months. Contact Arantza Dí­az de Cerio Garcí­a, ETS, Bilbao, tel.+34 9465726-00, fax -01, e-mail ets@ets-rfv.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=193106-2009. 30/09.Open invitation to tender, deadline 15.09.2009, for construction of the Txurdinaga-Casco Viejo section of Line 3 of the Bilbao Metro. Contract value EUR37.3 million, duration 36 months. Contact Arantza Dí­az de Cerio Garcí­a, ETS, Bilbao, tel.+34 9465726-00, fax -01, e-mail ets@ets-rfv.es http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=193105-2009. 30/09.



Permalink

Open invitation to tender, deadline 21.12.2009, for geotechnical consultancy for the construction of Metro Line 3 and rail tunnel Artxanda in Bilbao. Contract duration 36 months, estimated cost EUR537,000. Contact Arantza Diaz de Cerio Garcí­a at ETS-RFV in Bilbao, tel +34 9465726-00, fax -01, e-mail ets@ets-rfv.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=299444-2009. 45/09. Open invitation to tender, deadline postponed from 11.01.2010 to 14.01.2010, for construction of the San Antonio de Etxebarri section of Line 3 of the Bilbao Metro. Contract value EUR5.8 million, duration 18 months. Contact Arantza Dí­az de Cerio Garcí­a, ETS, Bilbao, tel.+34 9465726-00, fax -01, e-mail ets@ets-rfv.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=320657-2009 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=325002-2009. 49/09.The JV Inge Plan Consulting S.L.-Prointec SA has secured the EUR2 million contract for construction supervision services on Casco Viejo-Matiko section of Line 3 of Bilbao Metro and rail tunnel Artxanda in Bilbao. Contact Arantza Diaz de Cerio Garcí­a at ETS-RFV in Bilbao, tel +34 9465726-00, fax -01, e-mail ets@ets-rfv.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=016309-2010. 05/10.



Permalink

Open invitation to tender, deadline 14.07.2014, for construction of the section Casco Viejo (phase I) of Line 3 of Bilbao Metro. Contract value EUR12.2million, excluding VAT; duration 6 months. Time limit for receipt of requests for documents or for accessing documents: 07.07.2014. Further information from  Arantza Diaz de Cerio Garcia, ETS, Bilbao, tel.+34 9465726-00, fax -01, e-mail ets@ets-rfv.es and http://www.contratacion.euskadi.net/w32-1084/es/contenidos/anuncio_contratacion/expjaso3600/es_doc/es_arch_expjaso3600.html?ruta=http://www.contratacion.euskadi.net/w32-1081/es/v79aWar/comunJSP/v79aHome.jsp. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=183892-2014. 23/14.



Permalink

The JV Sacyr Construccion SA/Cavosa Obras y Proyectos SA/Altuna y Uria SA secured the EUR8.53 million contract, excluding VAT, for construction of the section Casco Viejo (phase I) of Line 3 of Bilbao Metro. Contact  Arantza Diaz de Cerio Garcia, ETS, Bilbao, tel.+34 9465726-00, fax -01, e-mail ets@ets-rfv.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=40634-2015. 06/15.



Permalink

The UTE Construcciones Murias SA/Hermanos Elortegi SA secured the EUR8,493,230 million contract, excluding VAT, for construction of Urduliz subsurface station on Line 1 of Bilbao Metro. Contact  Arantza Diaz de Cerio Garcia, ETS, Bilbao, tel +34 9465726-00, fax -01, e-mail ets@ets-rfv.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=079709-2015. 11/15.



Permalink

Open invitation to tender, deadline 04.09.2018, for maintenance and cleaning of tunnels and other dependencies of Bilbao Metro. Contract value EUR2.98million, excluding VAT; duration 24 months. Further information from Metro Bilbao SA, Bilbao, tel +34 944254000, email cyc@metrobilbao.eus. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=308693-2018 . Ref.n. 18/62. 32/18.



Permalink


Open invitation to tender, deadline 12/04/2021, for the maintenance of Galea Electric's WireWatch anti-theft systems in the following tunnels:  Miraflores 1 (314 m), Miraflores 2 (314 m) , Markarte (1443 m, double ways), Santa Marina (612 m),  Eibar (249 m), Karakate (512 m), Carquizano (393 m), Irurain (250 m) and Santa Catalina (979 m) on Bilbao-Donostia/San Sebastian railway line, Autzagane (749 m) on Amorebieta - Bermeo line and old Artxanda on Deusto-Lezama line, used as new Artxanda tunnel ‘s safety tunnel on metro Line 3. Click here for tender documents and where tenders must be sent. Value of the contract EUR308,560, excluding VAT. Duration of the contract 48 months. Contact ETS, Bilbao, tel +34 946572600, fax +34 946572601, email ets@ets-rfv.es. For further in TED tender, please click here. Ref.n. P20021499. 14/21. 

 




Permalink


Bidezain SL from Getxo secured the EUR208,400 contract, excluding VAT, for  the maintenance of Galea Electric's WireWatch anti-theft systems in the following tunnels:  Miraflores 1 (314 m), Miraflores 2 (314 m) , Markarte (1443 m, double ways), Santa Marina (612 m),  Eibar (249 m), Karakate (512 m), Carquizano (393 m), Irurain (250 m) and Santa Catalina (979 m) on Bilbao-Donostia/San Sebastian railway line, Autzagane (749 m) on Amorebieta - Bermeo line and old Artxanda on Deusto-Lezama line, used as new Artxanda tunnel ‘s safety tunnel on metro Line 3. Contact ETS, Bilbao, tel +34 946572601, email kontratazioa@ets-rfv.eus. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=020705-2022. Ref.n. P20021499. 03/22.



Permalink

Spain, San Sebastian - es/106

Second Ring Road

Design contest notices, deadline 30th September, 2003 for design of the second ring road in Donostia-San Sebastian and follow-up, checking and reports prior to supervision of construction. The project includes three dual tunnels: Arriceta or Aritzeta (299 m), Menditxo (360 m) and Perurena (510 m). Two lanes, 66.2 sq m cross section for Aritzeta. Three lanes, 96.77 sq m cross section for Menditxo and Perurena. Shotcrete and bolts, type Gewi or similar, as support. Geology consists of sandy limestone, marls and stratified sandstone. Work to start in early 2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=136624-2003 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=136623-2003, OJ S 150, or contact Bidegi, Donostia-San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net. Read E-News Weekly 27/2003. 37/03.



Permalink

Page: