Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Vienna - at/41

Motorway

16.2 km-long section of proposed motorway linking A2 South to A4 in East will require four cut and cover tunnels totalling 3.2 km. $320 million, five year construction programme starts December, 2001. 20/01.Restricted call for bids, deadline 19th September, 2005 for project management during the design phase (2006-2010) for Vienna's southeast tangential road A23, section Hirschstetten interchange-Hausfeldstrasse. The contract includes alignment determination and route optimisation, the environmental impact study and the procedure until the building. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=161110-2005, OJ S 161, or contact ASFINAG, Vienna, fax +43 5010814320. E-mail baumanagement@asfinag.at 36/05.Restricted call for bids, deadline 2nd November, 2005 for technical planning during the design phase (2005-2009) for Vienna's southeast tangential road A23, section Hirschstetten interchange-Hausfeldstrasse. This is a 7.8 km infrastructure, including about 2 km of tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=183692-2005, OJ S 186, or contact ASFINAG, Vienna, fax +43 5010814320. E-mail baumanagement@asfinag.at 40/05.



Permalink


Open invitation to tender, deadline 25/04/2023, for the design of the control center and for control and protection technology on a medium-voltage ring (MSP ring) to be built along the existing S01 (entire route), A02 (RPL Triestingtal section - Inzersdorf junction), A23 (Inzersdorf junction - Prater junction) and A04 (Prater junction - Schwechat junction) sections and in tunnels in the greater Vienna area. For tender documents, please click here, where tenders must be sent. Duration contract from 15/06/2023 to 30/12/2025. Contact Asfinag, Vienna, tel +43 050108-14520,  email andrea.ginner@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=227823-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=161016-2023. Ref.n. 2023/PROVIA n.96591. 17/23. 

 

Österreich-Wien: Dienstleistungen von Architektur-, Konstruktions- und Ingenieurbüros und Prüfstellen

2023/S 055-161016

Auftragsbekanntmachung

Dienstleistungen

Rechtsgrundlage:
Richtlinie 2014/24/EU

Abschnitt I: Öffentlicher Auftraggeber

I.1)Name und Adressen
Offizielle Bezeichnung: Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft
Postanschrift: z.H. ASFINAG Bau Management GmbH, Schnirchgasse 17
Ort: Wien
NUTS-Code: AT Österreich
Postleitzahl: 1030
Land: Österreich
Kontaktstelle(n): /Elektrotechnische und Maschinelle Ausrüstung
E-Mail: andrea.ginner@asfinag.at
Telefon: +43 050108-14520
Internet-Adresse(n):
Hauptadresse: www.asfinag.at
I.3)Kommunikation
Die Auftragsunterlagen stehen für einen uneingeschränkten und vollständigen direkten Zugang gebührenfrei zur Verfügung unter: www.provia.at
Weitere Auskünfte erteilen/erteilt die oben genannten Kontaktstellen
Angebote oder Teilnahmeanträge sind einzureichen an die oben genannten Kontaktstellen
I.4)Art des öffentlichen Auftraggebers
Einrichtung des öffentlichen Rechts
I.5)Haupttätigkeit(en)
Andere Tätigkeit: Infrastrukturbetreiber

Abschnitt II: Gegenstand

II.1)Umfang der Beschaffung
II.1.1)Bezeichnung des Auftrags:

S01, A02, A23, A04 - Energieregion Ost, Planung MS-Leit- und Schutztechnik

Referenznummer der Bekanntmachung: 2023/PROVIA ID-Nr:96591
II.1.2)CPV-Code Hauptteil
71000000 Dienstleistungen von Architektur-, Konstruktions- und Ingenieurbüros und Prüfstellen
II.1.3)Art des Auftrags
Dienstleistungen
II.1.4)Kurze Beschreibung:

Die ASFiNAG plant den Autobahn- und Tunnelbetrieb im Großraum Wien mit einem höchstmöglichen Maß an Eigenversorgung sicherzustellen. Dazu wird ein Mittelspannungsring (MSP Ring) entlang der bestehenden Autobahnen S01 (gesamte Strecke), A02 (Abschnitt RPL Triestingtal – Knoten Inzersdorf), A23 (Abschnitt Knoten Inzersdorf – Knoten Prater) und A04 (Abschnitt Knoten Prater – Knoten Schwechat) errichtet werden. Ziel dieses MSP Rings ist es, sämtliche ASFINAG eigenen Stromverbraucher, Stromerzeuger (diverse PV Anlagen) und Stromspeicher (Batteriespeicher im Bereich Rannersdorf und Vösendorf) miteinander zu verbinden.Aufgrund der Komplexität der Anlagen ist eine übergeordnete Energie-Leitstelle erforderlich. Die Planung dieser Leitstelle samt erforderlichem Leitsystem zu allen Anlagen und die Planung der erforderlichen Schutztechnik in Abstimmung mit den Netzbetreibern sind im Rahmen dieser Dienstleistungsausschreibung anzubieten.

II.1.5)Geschätzter Gesamtwert
II.1.6)Angaben zu den Losen
Aufteilung des Auftrags in Lose: nein
II.2)Beschreibung
II.2.3)Erfüllungsort
NUTS-Code: AT Österreich
Hauptort der Ausführung:

Projektgebiet und Wien

II.2.4)Beschreibung der Beschaffung:

S01, A02, A23, A04 Energieregion Ost, Planung MS-Leit- und Schutztechnik

II.2.5)Zuschlagskriterien
Der Preis ist nicht das einzige Zuschlagskriterium; alle Kriterien sind nur in den Beschaffungsunterlagen aufgeführt
II.2.6)Geschätzter Wert
II.2.7)Laufzeit des Vertrags, der Rahmenvereinbarung oder des dynamischen Beschaffungssystems
Beginn: 15/06/2023
Ende: 30/12/2025
Dieser Auftrag kann verlängert werden: nein
II.2.10)Angaben über Varianten/Alternativangebote
Varianten/Alternativangebote sind zulässig: nein
II.2.11)Angaben zu Optionen
Optionen: ja
Beschreibung der Optionen:

3.1 Leistungen nach Auftragsvergabe, 3.2 Regieleistungen

II.2.13)Angaben zu Mitteln der Europäischen Union
Der Auftrag steht in Verbindung mit einem Vorhaben und/oder Programm, das aus Mitteln der EU finanziert wird: nein
II.2.14)Zusätzliche Angaben

Abschnitt III: Rechtliche, wirtschaftliche, finanzielle und technische Angaben

III.1)Teilnahmebedingungen
III.1.2)Wirtschaftliche und finanzielle Leistungsfähigkeit
Eignungskriterien gemäß Auftragsunterlagen
III.1.3)Technische und berufliche Leistungsfähigkeit
Eignungskriterien gemäß Auftragsunterlagen
III.2)Bedingungen für den Auftrag
III.2.1)Angaben zu einem besonderen Berufsstand
Die Erbringung der Dienstleistung ist einem besonderen Berufsstand vorbehalten
Verweis auf die einschlägige Rechts- oder Verwaltungsvorschrift:

Es wird ausdrücklich auf die Anforderungen der EWR - Architektenverordnung bzw. der EWR - Ingenieurkonsulentenverordnung hingewiesen.

Abschnitt IV: Verfahren

IV.1)Beschreibung
IV.1.1)Verfahrensart
Offenes Verfahren
IV.1.3)Angaben zur Rahmenvereinbarung oder zum dynamischen Beschaffungssystem
IV.1.8)Angaben zum Beschaffungsübereinkommen (GPA)
Der Auftrag fällt unter das Beschaffungsübereinkommen: ja
IV.2)Verwaltungsangaben
IV.2.2)Schlusstermin für den Eingang der Angebote oder Teilnahmeanträge
Tag: 18/04/2023
Ortszeit: 11:00
IV.2.3)Voraussichtlicher Tag der Absendung der Aufforderungen zur Angebotsabgabe bzw. zur Teilnahme an ausgewählte Bewerber
IV.2.4)Sprache(n), in der (denen) Angebote oder Teilnahmeanträge eingereicht werden können:
Deutsch
IV.2.7)Bedingungen für die Öffnung der Angebote
Tag: 18/04/2023
Ortszeit: 11:00
Ort:

ASFINAG BMG, 1030 Wien, Schnirchgasse 17

Abschnitt VI: Weitere Angaben

VI.1)Angaben zur Wiederkehr des Auftrags
Dies ist ein wiederkehrender Auftrag: nein
VI.2)Angaben zu elektronischen Arbeitsabläufen
Aufträge werden elektronisch erteilt
Die elektronische Rechnungsstellung wird akzeptiert
Die Zahlung erfolgt elektronisch
VI.3)Zusätzliche Angaben:

Die vom Auftraggeber verlangten Nachweise gem. §§ 80 ff BVergG sind den Ausschreibungsunterlagen zu entnehmen. Auf die Bestimmungen des § 21 BVergG wird ausdrücklich hingewiesen. Nationale Erkennungsnummer: [L-885831-3313]

VI.4)Rechtsbehelfsverfahren/Nachprüfungsverfahren
VI.4.1)Zuständige Stelle für Rechtsbehelfs-/Nachprüfungsverfahren
Offizielle Bezeichnung: Bundesverwaltungsgericht
Postanschrift: Erdbergstraße 192-196
Ort: Wien
Postleitzahl: 1030
Land: Österreich
E-Mail: einlaufstelle@bvwg.gv.at
Telefon: +43 1601490
VI.4.4)Stelle, die Auskünfte über die Einlegung von Rechtsbehelfen erteilt
Offizielle Bezeichnung: Bundesverwaltungsgericht
Postanschrift: Erdbergstraße 192-196
Ort: Wien
Postleitzahl: 1030
Land: Österreich
E-Mail: einlaufstelle@bvwg.gv.at
Telefon: +43 1601490
VI.5)Tag der Absendung dieser Bekanntmachung:
13/03/2023



Permalink


PEL Ingenieurbüro für Elektro- und Installationstechnik GmbH from Graus have secured the EUR 351,987.10 contract, excluding VAT contract. Which is for the design of the control center and for control and protection technology on a medium-voltage ring (MSP ring), to be built along the existing S01 (entire route), A02 (RPL Triestingtal section - Inzersdorf junction), A23 (Inzersdorf junction - Prater junction) and A04 (Prater junction - Schwechat junction) sections and in tunnels in the greater Vienna area. Contact Asfinag, Vienna, tel +43 050108-14520,  email andrea.ginner@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=445578-2023. Ref.n. 2023/PROVIA n.96591. 29/23. 




Permalink

Austria, Vorarlberg - at/40

Motorway

Award of $38 million contract for drill/blast construction of 3 km-long east tube on A14 Rheintal motorway to Jaeger, Beton & Monierbau, and Strabag for completion October, 2003. Visit www.strabag.at 23/01. Southern bypass will include $40 million, 2.6 km-long Letze tunnel on B191 for which preliminary investigation is underway. Construction starts 2004 for completion 2007. 25/01. A meeting has been organised on 21st January, 2002 between Liechtenstein and the Austrian province of Vorarlberg on the issue of the Letze tunnel. The talks focused on the state of planning, on the first test drills and on the possible date for the launch of the construction in 2004. No new variants were presented. Vorarlberg insists on the construction of a southern Feldkirch bypass and the so-called Letze tunnel. 06/02. Negotiated procedure, deadline 31st October, 2002 for engineering planning for the 6,583 m-long Pfänder tunnel, west tube on the A14 Rheintal motorway. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=146976-2002, OJ S 186, or contact Amt der Vorarlberger Landesregierung, Bregenz, fax +43 5574 51127295. E-mail viib.bregenz@vorarlberg.at 40/02.Planning of the second tube (6,586 m) of the Pfänder tunnel, and two entry galleries, on motorway A14 has started with completion scheduled for the summer of 2005. The designer is ILF Consulting Engineers. They already designed the first tube. The design includes technical equipment, ventilation and safety installations as well as preparation of tender documents. Geological and hydrogeological studies by Geo-Logic. Building will begin 2006 and be completed in 2010. Visit www.ilf.com and www.geo-logic.at 33/03.Open call for tenders, deadline 5th February, 2004 for renovation of the west tube of the Amberg tunnel (2,978 m) on the Rheintal motorway A14. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=216974-2003, OJ S 244, or contact Autobahnen- und SchnellstraíŸen-Finanzierungs AG, Vienna, fax +43 15313410020, or Amt der Vorarlberger Landesregierung, Feldkirch, fax +43 5574511927895. E-mail office.wien@oesag.at 02/04.Restricted procedure, deadline 5th December, 2005 for assistance in the remaining planning phase and building phase of the second tube (6,586 m) of the Pfaender tunnel on the Rhine Valley motorway A 14. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=212498-2005, OJ S 215, or contact ASFINAG, Vienna, fax +43 5010814420. E-Mail baumanagement@asfinag.at 46/05.Restricted procedure, deadline 9th January, 2006 for work supervision and management during construction of the second, west tube (6.6 km) of the Pfaender tunnel on the Rhine valley highway A14 and rehabilitation of the existing, east tube (6.7 km). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=227264-2005, OJ S 230, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 49/05.Restricted call for bids, deadline 11th April, 2007 for geological engineering for the second, 6.5 km-long Pfaender tunnel on the A 14 in Rhine valley, the cross passages to the existing tunnel and refurbishment of the existing bore. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=44251-2007, OJ S 36, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 09/07.Restricted call for bids, deadline 11th April, 2007 for geotechnical measurements for the second, 6.5 km-long Pfaender tunnel on the A 14 in Rhine valley, the cross passages to the existing tunnel and refurbishment of the existing bore. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=44250-2007, OJ S 36, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 09/07.Open call for tenders, deadline 19th June, 2007 for safety engineering for the Pfaender tunnel on the Rhine Valley highway A 14. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103286-2007, OJ S 84, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 19/07.Open call for tenders, deadline 2nd October, 2007 for planning the safety equipment for the second 6.5 km Pfaender tunnel on the A 14 in Rhine valley. This is a re-bid. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=192178-2007, OJ S 154, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 35/07.Further to the competitive tendering for construction of the second, west bore of the Pfänder tunnel on the Rhine valley highway A14, the contract winner is Beton- und Monierbau and FCC's affiliate Alpine Mayreder with a EUR123.2 million bid. The existing Pfänder tunnel in the Rhine valley and Walgau is the most trafficked of Austria and long traffic queues bedevil the tunnel to the point that planners considered necessary to double it. Alpine will bore the 6.6 km west tube using the TBM and conveyor belts currently at work under the Mont Sion in France. Click here. The Pfänder tunnel will be the first TBM-driven road tunnel in Austria. Work is set to begin in October to end in the summer of 2012, which is when the existing tube will be refurbished. In summer 2013, the tunnel should be open in both directions. Read E-News Weekly 41/2002. Visit www.bemo.net and www.alpine.at 42/07.Open invitation to tender, deadline 21.04.2009, for design of the regional tunnel supervision headquarters for A14 Rheintalflug/Walgau tunnels at Hohenems. Contract duration 15.5.2009 to 31.5.2010. Contact ASFINAG Bau Management GmbH, Wien, Herrn Michael Metzler, tel +43 5010814-575, fax -420, e-mail baumanagement@asfinag.at Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=055707-2009 OJ S 38. 11/09.



Permalink

Open invitation to tender, deadline 15.06.2010, for delivery and installation of ventilitation equipment in the new west bore and for refurbishment of ventilation equipment in the old tube of the 6,583 m-long Pfander tunnel on the A14 Rheintal motorway. The contract includes the maintenance of the ventilation system in both tubes. Contract duration 01.11.2010- 30.6.2013. Contact ASFINAG, tel +43 5010814575-974, fax -72, e-mail petra.maier@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=151441-2010. 22/10.



Permalink

Open invitation to tender, deadline 16.06.2011, for refurbishment of existing west tube of 6,583 m-long Pfander tunnel on the A14 Rheintal motorway, including tunnel portals, lining, painting, drainage, ventilation, and water supply. Contract duration 23.06.2012-30.6.2013. Further information, specs and docs from Ulrich Engbert at ASFINAG in Vienna, tel +43 5010814485, fax -82, e-mail ulrich.engbert@asfinag.at to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=139039-2011. 18/11.



Permalink


Open call for tenders, deadline 23.03.2017, for maintenance of the 6.5 km Pfaender tunnel on the A 14 in the Rhine valley. The duration of the contrat is from 15/04/2017 to 14/04/2021. Please contact Asfinag, Innsbruck, tel +43 050108-0, fax +43 050108-18310, email gerhard.spreitzer@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=031819-2017. Ref.n. 2017/PROVIA ID-Nr:7675. 05/17.




Permalink


Open call for tenders, deadline 22/02/2024, for the partial refurbishment of the E&M equipment for the 6.5 km Pfaender tunnel on the A 14 in the Rhine valley. In 2012 the new western tube was opened to traffic and in 2013 its eastern tube was modernised. Click here for bid/tender documents. The duration of the contract is from 09/09/2024 to 20/10/2026. Contact Asfinag, attn Stefan Sperling , Vienna, tel +43 6646010814575, email stefan.sperling@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=040513-2024. Ref.n. 109879. 04/24. 




Permalink

Austria, Voralberg - at/39

Highway

Geological investigation commencing to establish alignment of $90 million, 5.7 km-long, single tube Erzberg tunnel on B198 between existing Ralegg and Monzabon tunnels. Invitation to tender for design contract expected 2002 for construction start in 2004. Contact AVL, Bregenz fax +43 557 451 127233. Visit www.bregenz.at 17/01.11.4 km-long, $120 million section of S35 motorway between Lueckenschluss Stausee and Roethelstein will include three tunnels: 1.1 km-long second tube of Kaltenbach; 2.8 km-long Kirchdorf; and 725 m-long single-tube Maustatt. Construction start in 2003 for opening 2006. Contact via www.stmk.gv.at 21/01.



Permalink

Austria, Unterwald - at/38

Railway

Award of 1 km-long single-tube drill/blast NATM tunnel in quartzphyllite and quarzite to consortium of Porr, Ostu Stettin, Strabag, Alpine and Haider for immediate start and completion by November, 2002. Visit www.strabag.at and www.porr.at 14/01.



Permalink

Austria, Ischgl - at/37

Highway

Open invitation to tender, deadline 30th March, 2001, for road construction including 775 m-long tunnel for ATL, Innsbruck, fax +43 512 508 4005. Contact through www.ischgl.at 10/01.



Permalink

Austria, Linz - at/36

Tramway

Restricted tendering, deadline 12th February, 2001, for 1.8 km-long tramway tunnel. Contact LEFV, Linz fax +43 732 7801 7980. Visit http://ted.eur-op.eu.int 07/01.Award of contract to construct 1.8 km-long NATM tunnel to Hinterregger, Ostu-Stettin, Dyckerhoff & Widmann for completion 2004. Linzer Elektrizitats, fax +43 732780 17980. Visit www.dywidag.de 40/01.Negotiated procedure, deadline 24th August, 2007 for detailed planning for the Harter Plateau tramway line in Linz. This 5.5 km line includes a 2 x 900 m-long bored tunnel to access to the existing underground railway station. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=187258-2007, OJ S 150, or contact Linz Linien, Linz, +43 7323400157972. E-mail einkauf@linzag.at 33/07.Schimetta Consult, BHM Ingenieure and Laabmayr & Partner landed a EUR4.8 million contract to carry out the detailed planning for the 5.5 km Harter Plateau tramway line in Linz, which includes a 2 x 900 m-long bored tunnel to access to the existing underground railway station. Visit www.schimetta.at, www.bhm-ing.com, www.laabmayr.at 11/08.Negotiated procedure, deadline 14th August, 2008 for construction of a 2,070 m section of the Harter Plateau tramway line, including a nearly 1 km twin bored single-track tunnel, with four cross-passages, under the í–BB tracks in the area of main railway station, a 440 m cut-and-cover dual-track tunnel and other associated works. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=192256-2008, OJ S 143, or contact Linz Linien, Linz, +43 7323400157972. E-mail einkauf@linzag.at 31/08.



Permalink

Invitation to tender by negotiated procedure, deadline 16.07.2009, for supply, installation and commissioning of ventilation equipment for tunnel section of the Harter Plateau tramway line. Contract duration 01.01.2010 - 31.12.2011. For more in German click here or contact Managementservice Linz GmbH, Linz, Ing.Markus Schopper, tel +43 7323400-8552, fax -158552, e-mail m.schopper@linzag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=173897-2009 27/09.



Permalink

Imtech Austria Anlagentechnik GmbH of Linz have secured the contract for supply, installation and commissioning of ventilation equipment for the tunnel section of the Harter Plateau tramway line. For more, contact Ing. Harald Grogger at Managementservice Linz GmbH in Linz, tel +43 7323400-7982, fax -157982, e-mail h.grogger@linzag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=059736-2010. 10/10.



Permalink

Austria, Feldkirch - at/35

Motorway

Open invitation to tender for construction of 3 km-long twin-tube highway tunnel, deadline 17th January, 2001. Details from Strassenbau Feldkirch, fax +43 552 2333 27885 or visit http://ted.eur-op.eu.int December 2000.



Permalink

Austria, Vienna - at/34

High Speed Railway

  IGT, Salzburg presenting designs for 76 sq m twin-tube and 120 sq m single tube alternatives for proposed 11.64 km Wienerwald tunnel on Vienna-St Polten line in flysch and molasse. Invitations to tender planned for 2001 with construction between 2002 and 2006, value $240-290 million. October 2000. A jv of iC consulenten, Elektrowatt Infra, Basler Hofmann and Strobl has been awarded the detailed design of the Wienerwald tunnel in May 2002. The 11.7 km-long railway tunnel with two single-track tubes will be designed and tendered for the option of TBM or NATM construction. Tenders for construction are scheduled for August 2003. More from Josef Daller at iC consulenten, Vienna, j.daller@ic-vienna.at. Visit www.ic-vienna.at 33/02.Award to ILF, Maidl and SMH of a €800,000 contract for engineering and consultancy for tender documents and tender planning for the Perschling tunnels consisting of three single double-track tubes on the new west railway Vienna-St Pölten. Lengths: 1,370 m + 3,293 m + 2,775 m. Width: 13 to 14 m. Construction methods: NATM or TBM in molasse. Tenders for construction to be invited at end-2003 or in mid-2004. Visit www.hl-ag.com and www.ilf.com 06/03.Open call for tenders, deadline 13th February, 2004 for construction of a 1.8 km section of the 10.9 km Wienerwald tunnel on the Vienna-St. Pölten section. The project also includes galleries and shafts for three emergency exits, one cavern and three ventilation shafts. The Wienerwald tunnel will be a dual-tube single-track tunnel with 22 cross passages every 500 m. The tunnel will be built in flysch and in molasse. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=175484-2003, OJ S 195, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186107. E-mail franz.bauer@hl-ag.com 43/03.Negotiated procedure, deadline 30th March, 2004 for geological and hydrogeological documents and geological consultancy during construction of the Wienerwald tunnel between Vienna and St Poelten. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=024110-2004, OJ S 27, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186126. E-mail marko.koren@hl-ag.com 10/04.The four bidding groups for the 13 km Wienerwald tunnel on the Vienna-St Poelten line are Strabag, Oestu-Stettin, Hinteregger and Wayss & Freytag; Alpine Mayreder, Walter Bau, Beton- und Monierbau and Habau; Zueblin, Hochtief, Jaeger Bau and Swietelsky; and Porr and Bilfinger Berger. NATM will be used. The contract is worth EUR340 million. Award in June 2004. 11/04.Open invitation to tender, deadline 11th May, 2004 for geotechnical measurements during NATM or TBM construction of the 13 km Wienerwald tunnel on the new Vienna-St Polten line. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=052226-2004, OJ S 61, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail marko.koren@hl-ag.com 16/04.Open call for bids, deadline 6th August, 2004 for construction of the Vienna-St. Poelten section, lot 3 Perschling tunnel succession, including three tunnels: Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m) as well as shafts, emergency exits, portals and an at-grade section between the Stierschweiffeld and Raingruben tunnels. Each of these three tunnels has two tracks. Diameter of about 12.5 m. The expected geology is molasse and flysch. TBM or New Austrian Tunnelling Method, depending on the proposals. Bids to be opened in August 2004. Construction start in February 2005 for completion in October 2009. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=079867-2004, OJ S 100, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186197 or 18957769457. E-mail ma-plwo4@hl-ag.com 24/04.Negotiated procedure, deadline 21st June, 2004 for construction management during excavation of the Reiseberg, Stierschweiffeld and Raingruben tunnels on the Vienna-St. Poelten line. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=083406-2004, OJ S 102, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail marko.koren@hl-ag.com 24/04.Construction of the 2 x 13.1 km Wienerwald tunnel on the Vienna-St Poelten rail section has been awarded by Eisenbahn-Hochleistungsstrecken to Porr Tunnelbau and Bilfinger Berger, for EUR340 million. After thorough analysis of the construction methods, it has been decided that tunnel boring machines will be used on most of the tunnel route. It is the first time TBMs will be used outside urban areas in Austria. Two 10.7 m-diameter TBMs will excavate 2 x 10.7 km with an expected daily advance of about 25 m. Both tubes will be connected by 26 cross passages. Both machines will start in autumn 2005 from the west side and are expected to hole through in autumn 2007. From September 2004, some 2 x 2,400 m of tunnel will be driven by conventional means from the east portal in difficult ground conditions. Finishing work and equipment will take place until fall 2009. When it opens, the tunnel will cut trips from Vienna to Saint Poelten to 25 minutes. Technically challenging, the Wienerwald tunnel is the longest rail tunnel and second longest tunnel all types included ever launched in Austria. Visit www.hl-ag.com, www.porr.at and www.bilfinger.de 31-32/04.Negotiated procedure, deadline 9th September, 2004 for work inspection during construction of the 2 x 13.1 km Wienerwald tunnel on the Vienna-St Poelten rail section. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=130222-2004, OJ S 150, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail marko.koren@hl-ag.com 35/04.Negotiated procedure, deadline 6th September, 2004 for construction supervision of the Perschling tunnel succession, including three 12.5 m-diameter dual-track tunnels: Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=128347-2004, OJ S 148, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail marko.koren@hl-ag.com 36/04.Negotiated procedure, deadline 27th September, 2004 for geological consultancy services during preparatory and excavation works of the Perschling tunnel succession. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=141415-2004, OJ S 163, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail judith.engel@hl-ag.com 36/04.Open invitation to tender, deadline 5th November, 2004 for geotechnical services required within the construction of the Perschling tunnels in Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=156525-2004, OJ S 163, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail judith.engel@hl-ag.com 39/04.ILF and CCC Purrer will be responsible for the construction management during excavation of the Reiseberg, Stierschweiffeld and Raingruben tunnels (1,370 m, 3,293 m and 2,775 m) on the Vienna-St. Poelten line. Visit www.ilf.com 51-52/04.Strabag pocketed a EUR115 million contract to build the Perschling dual-track tunnels on the Vienna-St. Poelten section, including three tunnels in Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m) as well as shafts, emergency exits, portals and an at-grade section between the Stierschweiffeld and Raingruben tunnels. Visit www.strabag.at 53/04-01/05.Open call for tenders, deadline 15th March, 2005 for construction of lot LT 44 "Gueterschleife" of the 12.3 km Lainzer tunnel. This is a 2.2 km section including a 200 m cut-and-cover section, approx. 1 km of single-track and double-track tunnel, to be built using NATM, and a 450 m cut-and-cover section. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=215964-2004, OJ S 250, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186197 or 18957769207. E-mail plw1@hl-ag.com 03/05.TKP Strobl, Stolitzka and Verbundplan secured a EUR883,600 contract for geotechnical services required within the construction of the Perschling tunnels in Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m). Visit www.verbundplan.at 08/05.IGT (Ingenieurgemeinschaft fuer Geotechnik und Tunnelbau) will be responsible for the work inspection during construction of the 2 x 13.1 km Wienerwald tunnel on the Vienna-St Poelten rail section. Visit www.igt.co.at 11/05.A JV of IGT (Ingenieurgemeinschaft fuer Geotechnik und Tunnelbau) and Metz Partner will be responsible for the construction supervision of the Perschling tunnels, including three 12.5 m-diameter dual-track tunnels: Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m). Visit www.igt.co.at and www.metz-partner.at 11/05.Meringer and Technisches Buro fur and Geotechnik Geologie (TBGG) secured a EUR717,700 contract for geological and hydrogeological consultancy during construction of the Perschling tunnels, including three 12.5 m-diameter dual-track tunnels on the Vienna-St. Poelten line: Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m). Visit www.tgm-online.com and www.baugeologie.co.at 12/05.Negotiated procedure, deadline 18th July, 2005 for construction management for contract LT 44 of the 12.3 km Lainz tunnel. This 2.2 km section includes a 200 m cut-and-cover section, approx. 1 km of single-track and double-track tunnel, to be built using NATM, and a 450 m cut-and-cover section. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=125027-2005, OJ S 126, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail marko.koren@hl-ag.com 27/05.Hinteregger, Oestu Stettin and Gebr. Haider will build lot LT 44 "Gueterschleife" of the 12.3 km Lainzer tunnel. This is a 2.2 km section including a 200 m cut-and-cover section, approx. 1 km of single-track and double-track tunnel, to be built using NATM, and a 450 m cut-and-cover section. Visit www.hinteregger.co.at and www.oestu-stettin.at 38/05.Open call for tenders, deadline 13th December, 2005 for construction of lot LT31 "Maxing" of the 12.3 km Lainzer tunnel. This is a 3,050 m tunnel, cross section 129.05 sq m, to be bored in soft ground. The main part of the geology is Tertiary sediments (sand, clay, coarse gravel). Construction method will be the NATM, with hammer and cutter. Shotcrete, steel arches, lattice girders and bolts as support. Spoil clearance with loader and dumper. Expected date for contract award is 5th May, 2006. Expected date for tunnelling start is 19th June, 2006. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=172165-2005, OJ S 173, or contact OEBB, Vienna, fax +43 19300045829. E-mail michael.emberger@hl-ag.com 39/05.Negotiated procedure, deadline 22nd December, 2005 for work supervision for lot LT 31 "Maxing" of the 12.3 km Lainzer tunnel. Click at/34. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=231313-2005, OJ S 234, or contact OEBB-Infrastruktur Bau, Vienna, fax +43 19300045829. E-mail Marko.Koren@bau.oebb.at 50-51/05.Open call for tenders, deadline 3rd March, 2006 for construction of a 3.5 km railway tunnel (contract LT 33 Hofjagdstrasse), as part of the Lainz tunnel. Single-tube double-track tunnel, cross section of 140 sq m approximately, to be built using the drill/blast method. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=246524-2005, OJ S 249, or contact OEBB, Vienna, fax +43 19300045829 or 18957769227. E-mail thomas.buisman@bau.oebb.at 05/06.A JV of Hochtief, Alpine Mayreder and Beton und Monierbau signed a EUR132.2 million contract to build lot LT31 "Maxing" of the 12.3 km Lainz tunnel. This is a 3,050 m single-tube tunnel stretch, cross section 129.05 sq m, to be bored in soft ground. Click at/34 for other details. Visit www.hochtief.com, www.alpine.at and www.bemo.net 22/06.A JV of ILF and Geoconsult received a EUR4 million contract for construction supervision services for contract LT 33 of the Lainzer tunnel. This is a 3.5 km-long single bored dual-track tunnel, to be built using the drilling and blasting. Visit www.ilf.com and www.geoconsult.at 04/07.Porr Tunnelbau, Strabag and Züblin bagged a EUR88.7 million contract to build contract LT 33 of the Lainzer tunnel. This is a 3.5 km-long single bored dual-track tunnel, featuring a cross section of 145 sq m and expected to be built using drilling and blasting in accordance with NATM. Works, which commenced on 13th November, 2006 will last 48 months until October 2010. Visit www.porr.at/tunnelbau, www.strabag.com and www2.zueblin.de 05/07.Restricted invitation to tender, deadline 16th April, 2008 for the medium and low voltage installations for the Tullnerfeld station and tunnel equipment for the Perschling chain of tunnels on the Vienna-St. Pölten high speed rail section. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=69917-2008, OJ S 51, or contact í–BB Infrastruktur Bau, Vienna, fax +43 19300045799. E-mail martin.neulinger@bau.oebb.at 12/08.



Permalink

Invitation to tender under restricted procedure, deadline 14.05.2009, for supply, delivery and installation of power supply system in the 6.6 km-long connecting tunnel, part of Lainzer project, Vienna. More information about the project here. Contract duration 01.09.2009 - 04.03.2013. Contact ES ET, Ing. Martin Neulinger, Wien, tel +43 193000457-85, fax -99, e-mail martin.neulinger@bau.oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=106354-2009, OJ S 73. 17/09.



Permalink

Open invitation to tender, deadline 14.10.2009, for fencing, railing and safety equipment installation work (Lot WT4) in the 11.64 km-long Wienerwald tunnel on the Vienna-St Polten-Wienerwald line. Contract duration 01.03.2010 - 30.04.2012. Contact Roland Fischer at Oebb-Infrastruktur Bau AG in Vienna, tel +43 193000-45734, e-mail roland.fischer@bau.oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=241453. 41/09.



Permalink

Invitation to tender by negotiated procedure, deadline 21.10.2009, for ancillary works for electricity power lines on the Vienna-St Polten-Wienerwald line, including the 11.64 km-long Wienerwald tunnel. Contract duration 01.02.2010 - 21.12.2012. Contact Matthias Müller at Oebb-Infrastruktur Bau Aktiengesellschaft, Engineering Services /Energietechnik, Projektmanagement Sankt Pölten, in Vienna, tel +43 274293000-3362, fax -3370, e-mail matthias.mueller@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=275341. 41/09.



Permalink

Porr Technobau und Umwelt AG, Swietelsky GmbH and Strabag bagged a EUR69 million contract for final equipment of the 3.5 km-long Lainzer tunnel. Contact Hd. von DI Andreas Pechhacker at í–BB Infrastruktur Bau AG in Vienna, tel +43 193000-45701, e-mail andreas.pechhacker@bau.oebb.at.Visit www.porr.at/tunnelbau, www.swietelsky.at and www.strabag.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=356847-2009. 02/10.



Permalink

Invitation to tender by negotiated procedure, deadline 20.04.2010, for track support system and ballast for Lainzer and Wienerwald tunnels. Contact Elke Heigl at Oebb-Infrastruktur AG in Wien, tel +43 6642864183, e-mail elke.heigl@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=096331-2010. 14/10.



Permalink

Negotiated invitation to tender, deadline 07.09.2015, for equipment maintenance in tunnels on the new railways Vienna-St. Polten, Innsbruck-Kufstein in Unterintal and Koralm. The contract is composed of six lots of duration 01.01.2016 to 31.12.2018, with a optional extension to 31.12.2020. Contact OEBB-Infrastruktur AG, represented by OEBB Business Competence Center GmbH, att.n Florian Fuehrer, Vienna, tel +43 19300032927, e-mailflorian.fuehrer@oebb.at. For electronic access www.oebb.at/m2c. Visithttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=291490-2015. Ref.n. 2015/M2C ID-N.3723. 34/15.




Permalink

Austria, Tyrol and Vorarlberg - at/33

Railway

Twin-track 2.4 km-long Blisadona rail tunnel on Arlberg railway extension project awarded to Beton & Monierbau. Visit www.bemo.net October 2000. Contract award worth €350,000 to Geoconsult for geotechnical services for the escape and rescue tunnel system between the 14 km tunnel on the S16 highway and the parallel 10 km railway tunnel in Arlberg. Includes six 3 m-wide 3.8 m-high cross passages with intermediate shafts, 11.5 m in diameter, 13-29 m-high, equipped with a spiral ramp, a 400 m cross connection, and a 400 parallel rescue tunnel. Design plans by Verbundplan and Bernard + Partner. Visit www.asg.co.at and www.geoconsult.at 50/01.Tenders invited, deadline 4th February, 2002 to supply and install telecomm systems in the 2.4 km Blisadona tunnel. Visit http://ted.eur-op.eu.int, document S 246-169715 or fax +43 19300025261, Vienna. Also visit www.oebb.at 02/02.Negotiated procedure, deadline 4th October, 2004 for phase 2 of the renovation of the 10 km Arlberg railway tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=151161-2004, OJ S 176, or contact Oesterreichische Bundesbahnen, Bludenz, fax +43 55526111522. E-mail karl.hartleitner@pe.oebb.at 38/04.A group of companies including Rhomberg Bahntechnik, Beton- und Monierbau, Porr Technobau und Umwelt and Heitkamp Rail secured a EUR89 million contract for phase 2 of the renovation of the 10 km Arlberg railway tunnel. Visit www.bemo.net 35/05.Negotiated call for tenders, deadline 14th December, 2007 for supply, installation and commissioning of radio systems in the 10,651 m-long Arlberg tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=271027-2007, OJ S 222, or contact OEBB, Innsbruck, fax +43 51293000 83864841. E-mail werner.winkler@oebb.at 48/07.Open invitation to tender, deadline 19th August, 2008 for supply and assembly of 10 kV medium voltage and low voltage plants and tunnel lighting systems in the 10,589 m Arlberg rail tunnel between Saint Anton and Langen. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=195678-2008, OJ S 145, or contact í–BB-Infrastruktur Bau, fax +43 512930004625. E-mail karl.mayer@bau.oebb.at 32-33/08.



Permalink

Austria, Innsbruck - at/32

Highway

Notice of award dated 12th October, 2000 of two tunnels on S16 Arlberg motorway Pians-Flirsch to jv of Beton u Monierbau/Universale/Alpine value $110 million of which up to 30% will be subcontracted. Sponsor is Otmar Alber, fax +43 512 520 12-134. Details at http://ted.eur-op.eu.int or visit www.bemo.co.at November 2000. Restricted invitation to tender, deadline 20th June, 2001, for design of 5.1 km-long twin-tube Roppener tunnel for Alpen Strassen, fax +43 512 520 12134. 26/01. Engineering planning contract awarded by Alpen StraíŸen to a jv of Bernard+Partner, Verbundplan, and Electrowatt Infra for the twin-tube Roppener tunnel, 5.1 km in length, on the A 12 highway for €533,000. Visit www.asg.co.at or www.ewi.ch 01/02.Restricted procedure, deadline 28th November, 2002 for engineering services for the Haiming-Tschirgant tunnel-Nassereith section of the A12 Inntal motorway. The tunnel will be 5 to 6 km in length. Planned date for work start in 2007. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=163983-2002, OJ S 207, or contact Alpen StraíŸen, Innsbruck, fax +43 51252012134. E-mail zentrale@asg.co.at 46/02.Preinformation notice for construction supervision of the second bore of the 5.1 km Roppener tunnel and refurbishment of the first tube, on the A12 Inn Valley highway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=018666-2005, OJ S 19, or contact Asfinag, Vienna, fax +43 5010814482. E-mail otmar.alber@asfinag.at 05/05.Preinformation notice for geological consultancy of the second bore of the 5.1 km Roppener tunnel and refurbishment of the first tube, on the A12 Inn Valley highway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=018665-2005, OJ S 19, or contact Asfinag, Vienna, fax +43 5010814482. E-mail otmar.alber@asfinag.at 05/05.Restricted procedure, deadline 16th June, 2005 for assistance to project management for the planning, tendering and construction phase of the second tube of the 5.1 km Roppener tunnel on the A12 highway in the Inn Valley. Estimated cost of the project: EUR115 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=091217-2005, OJ S 92, or contact ASFINAG, Vienna, fax +43 5010814020. E-mail baumanagement@asfinag.at 21/05.Restricted procedure, deadline 30th June, 2005 for construction supervision and management for the second tube of the 5.1 km Roppener tunnel on the A12 highway in the Inn Valley. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=109775-2005, OJ S 110, or contact ASFINAG, Vienna, fax +43 5010814020 or 5010818020. E-mail baumanagement@asfinag.at or gabriele.moerwald@asfinag.at 24/05.Restricted procedure, deadline 20th February, 2006 for geotechnical measurements, control measurements and scanning of documents during construction of the second tube (5,100 m) of the Roppener tunnel on the Inn Valley highway A 12, including the cross passages and rehabilitation of the existing tube. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=07872-2006, OJ S 7, or contact ASFINAG, Vienna, fax +43 5010814020 or 5010818020. E-mail baumanagement@asfinag.at and gabriele.moerwald@asfinag.at 04/06.Restricted procedure, deadline 20th February, 2006 for geological measurements during construction of the second tube (5,100 m) of the Roppener tunnel on the Inn Valley highway A 12, including the cross passages and rehabilitation of the existing tube. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=07861-2006, OJ S 7, or contact ASFINAG, Vienna, fax +43 5010814020 or 5010818020. E-mail baumanagement@asfinag.at and gabriele.moerwald@asfinag.at 04/06.Open call for bids, deadline 20th April, 2006 for construction of the second tube (5,097 m) of the Roppener tunnel on the Inn valley highway A 12, cross passages and refurbishment of the existing bore (5,100 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=047146-2006, OJ S 45, or contact ASFINAG, Vienna, fax +43 5010814020. E-mail baumanagement@asfinag.at 11/06.The deadline for bid submission for construction of the second tube (5,097 m) of the Roppener tunnel on the Inn valley highway A 12, cross passages and refurbishment of the existing bore (5,100 m) has been extended to 4th May, 2006. Click at/32. 15/06.Restricted call for tenders, deadline 19th June, 2006 for control and inspection during the remaining design phase and construction phase of the 4,310 m Tschirgant tunnel on the Inn valley highway A 12. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=100812-2006, OJ S 94, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 23/06.Restricted call for tenders, deadline 2nd October, 2006 for construction management during excavation of the second Roppener tunnel (5.1 km) on the A 12 highway in the Inn valley, including also the cross passages to the existing tube and its rehabilitation. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188813-2006, OJ S 177, or contact ASFINAG, Vienna, fax +43 5010814020 or 5010814482. E-mail baumanagement@asfinag.at 39/06.Open call for tenders, deadline 22nd October, 2007 for supply and installation of ventilation equipment (semi-transversal ventilation) for the second, 5.1 km Roppener tunnel and upgrading in the existing tunnel on highway A 12 in Inn valley. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=205530-2007, OJ S 166, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 37/07.Open call for tenders, deadline 22nd October, 2007 for supply and installation of medium voltage supplies for the second, 5.1 km Roppener tunnel and upgrading in the existing tunnel on highway A 12 in Inn valley. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=216592-2007, OJ S 177, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 39/07.Open call for tenders, deadline 20th December, 2007 for supply and installation of electromechanical equipment (low voltage, lighting, traffic management, traffic data acquisition, emergency call, telephones, cables, ventilation, etc.) in the new Innsbruck-bound Roppen tunnel and upgrading in the Bregenz-bound tube on the Inn valley highway A12. The overall length is approx. 5,050 metres per tube. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=251260-2007, OJ S 207, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 44/07.Open call for tenders, deadline 20th December, 2007 for supply and installation of instrumentation (video, emergency call, etc.) in the new Innsbruck-bound Roppen tunnel and upgrading in the Bregenz-bound tube on the Inn valley highway A12. The overall length is approx. 5,050 metres per tube. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=251254-2007, OJ S 207, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 44/07.Open invitation to tender, deadline 21st May, 2008 for radio equipment for the 2 x 5,050 m Roppener tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=82386-2008, OJ S 61, or contact Asfinag, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 15/08.Howden Ventilatoren will supply and install ventilation equipment (semi-transversal ventilation) in the second, 5.1 km Roppen tunnel and upgrade the existing tunnel on highway A 12 in Inn valley. Visit www.howden.com/en/Businesses/HowdenVentilatoren 36/08.Siemens Elin Buildings and Infrastructure has been contracted to supply and install medium voltage supplies in the second, 5.1 km Roppen tunnel and upgrade the existing tunnel on highway A 12 in Inn valley. This contract is worth EUR833,000. In addition, the company has been commissioned to supply and install electromechanical equipment (low voltage, lighting, traffic management, traffic data acquisition, emergency call, telephones, cables, ventilation, etc.) in the new Innsbruck-bound Roppen tunnel and upgrade the Bregenz-bound tube. The overall length is approx. 5,050 metres per tube. The contract totals EUR14.9 million. Visit www.siemenselin.at or www.siemens.com 36/08.Dürr pocketed a EUR6.4 million contract to supply and install instrumentation (video, emergency call, etc.) in the new Innsbruck-bound Roppen tunnel and upgrade the Bregenz-bound tube on the Inn valley highway A12. The overall length is approx. 5,050 metres per tube. Visit www.duerr-gruppe.at 36/08.



Permalink


Open invitation to tender, deadline 17.02.2016, for refurbishment of the twin tube Wilten tunnel (542m) and its E&M equipment on the A12 in Innsbruck. Contact Asfinag, attn Eng. Martin Jaeger, Vienna, tel +43 5010814276, fax +43 5010814272, e-mail martin.jaeger@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=456675-2015. Ref.n. 2015/PROVIA ID-N.2154. 53/15.




Permalink


Ingenieurburo DI Andreas Brandner from Innsbruck secured the EUR 322,203 contract, excluding VAT, for the general management during the refurbishment of the twin tube Wilten tunnel (542 m) on the A12 in Innsbruck. For further information contact Asfinag, attn Eng. Martin Jaeger, Vienna, tel +43 5010814276, fax +43 5010814272, e-mail martin.jaeger@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=205903-2016. Ref. 2015/@AVA ID-N. 41541. 25/16. 




Permalink

Open invitation to tender, deadline 16.10.2017, for data collection, bypass study and impact analysis for the 6.5km  Landecker tunnel on the A12 in Innsbruck. The duration of the contract is from 04/12/2017 to 30/09/2018. Contact Asfinag, Vienna, tel +43 5010814276, fax +43 5010814272, email martin.jaeger@asfinag.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=350577-2017. Ref.n. 2017/PROVIA ID-N.11427. 36/17.



Permalink

The open invitation to tender, deadline 16.10.2017, for data collection, bypass study and impact analysis for the 6.5km  Landecker tunnel on the A12 in Innsbruck has not been awarded. Contact Asfinag, Vienna, tel +43 5010814276, fax +43 5010814272, email martin.jaeger@asfinag.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=090311-2018.

Ref.n. 2017/PROVIA ID-N.11427. 09/18.



Permalink

The Joint Venture ARGE between Amberg Engineering AG / SKAVA Consulting ZT GmbH from Regensdorf-Watt secured the EUR315,985.78 contract, excluding VAT, for a bypass study  for the 6.5km  Landecker tunnel on the A12 in Innsbruck.

Contact Asfinag, Vienna, tel +43 50108/14273, fax +43 5010814272, email karl.praxmarer@asfinag.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=022088-2019.

Ref.n. 2018/PROVIA ID-N.18665. 03/18.



Permalink


Open invitation to tender, deadline 16/11/2020, for the upgrading of the E&M equipment for the 2 x 5,050 m Roppener tunnel on the A12 motorway. Duration of the contract is from 01/02/2021 to 01/08/2024. For further information on the tender click here. Contact Asfinag, attn Mario Patigler, Vienna, tel +43 50108-14574, fax +43 50108-14482, email mario.patigler@asfinag.at. Ref. 2020/PROVIA ID-n.53893. 44/20. 

 




Permalink


LLP Engineering GmbH/Ingenieurburo fur Elektrotechnik from Salzburg secured the EUR410,553.44 contract, excluding VAT, for the upgrading of the E&M equipment for the 2 x 5,050 m Roppener tunnel on the A12 motorway. For further information on the tender click here. Contact Asfinag, attn Mario Patigler, Vienna, tel +43 50108-14574, fax +43 50108-14482, email mario.patigler@asfinag.at. Ref. 2020/PROVIA ID-n.53893. 07/21.  

 




Permalink


Open invitation to tender, deadline 02/11/2021, for A12 Sab Landecker Tunnel (6.5km ), Escape and Rescue Paths, Stsg and General Renovation – Planning. Duration of the contract is from 01/01/2022 to 31/12/2029. Contact Asfinag, Vienna, tel 43 66460108-14485, email ulrich.engbert@asfinag.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=endocid=495932-2021. Ref.n. 2021/PROVIA ID-N. 60000. 41/21



Permalink


Open invitation to tender, deadline 25/11/2022, for boreholes for geological exploration to be carried out in preparation for the overall project for the A12 Landecker Tunnel, escape and rescue routes, STSG and general renovation. The drilling starting points are in the existing road tunnel, both in the actual traffic area and in the breakdown bays.  The drilling lengths are in the range of 40 m to 50 m. Duration of the contract is from 01.04.2023 to 30.06.2023. Contact ASFINAG Construction Management GmbH, attn Eng. Engbert Ulrich, tel +43 664 6010814485, email ulrich.engbert@asfinag.at. Visit http://www.provia.at/. Ref.n. 2022/PROVIA n. 90015. 45/22. 



Permalink


Prior information notice, deadline 18/09/2023, for a safety tunnel and bypasses, for the A12 Landecker tunnel renovation. Estimated date of publication of contract notice: 18/09/2023. Contact ASFINAG, Vienna, tel +43 6010814484, email richard.loidl@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=487624-2023. 32/23. 



Permalink

 

Open invitation to tender, deadline 10/10/2023, for the partial renovation of the 2 x 5,050 m Roppener tunnel on the A12 motorway. The contract includes also upgrading of operational & safety technology. Duration of the contract is from 22/04/2024 to 26/09/2025. Click here for tender documents. Contact Asfinag, attn Mario Patigler, Vienna, tel 43 6646010814574, email mario.patigler@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=581151-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=542743-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=504737-2023.  Ref. 2023/PROVIA n.103138. 40/23. 




Permalink


The contract about the open invitation to tender, deadline 10/10/2023, for the partial renovation of the 2 x 5,050 m Roppener tunnel on the A12 motorway was not awarded. Contact Asfinag, attn Mario Patigler, Vienna, tel 43 6646010814574, email mario.patigler@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=708416-2023.  Ref. 2023/PROVIA n.103138. 47/23.  



Permalink


Prior information notice for the partial renovation of the 2 x 5,050 m Roppener tunnel on the A12 motorway. The contract also includes upgrading of operational & safety technology. Click here for tender documents. Estimated date of publication of contract notice 08/04/2024. Contact Asfinag, attn Mario Patigler, Vienna, tel 43 6646010814574, email mario.patigler@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=040706-2024.  Ref. n. 111571. 04/24. .  




Permalink

Open invitation to tender, deadline 21/03/2024, for local construction supervision during the partial refurbishment of construction and operational & safety equipment of the 5.1k Roppen tunnel, Romedi tunnel and bridge on the Pigerbach river on highway A 12. Click here http://provia.at/ for bid documents and where tenders must be sent. Duration of contract from 03/06/2024 to 31/12/2027. Contact ASFINAG Bau Management GmbH, attn Tobias Cologna, Vienna, tel +43 6646010814658, email tobias.cologna@asfinag.at. Visit https://ted.europa.eu/en/notice/-/detail/100573-2024. Ref.n. PROVIA n. 112909. 07/24.



Permalink

Page: