Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Vienna - at/85

Water

Closing Date: 29.01.2014 (Tender Closed)

Open invitation to tender, deadline 29.01.2014, for construction of 1.1 km-long x 10 sq m section tunnel and 130 m-long x 1 m-diameter connector including shafts. Contract duration 880 days after award. Contact Norbert Klicha at Wienerwasser in Vienna, tel +43 1599593-1501, fax -1500 , e-mail kanz5@ma31.wien.gv.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=413106-2013. NUTS Code AT121. 50/13.



Permalink

JV Marti GmbH & Anton Traunfellner GmbH of Graz secured the EUR8.15 million contract, excluding VAT, for construction of 1.1 km-long x 10 sq m section tunnel and 130 m-long x 1 m-diameter connector including shafts. Contact Norbert Klicha at Wienerwasser in Vienna, tel +43 1599593-1501, fax -1500 , e-mail kanz5@ma31.wien.gv.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=160461-2014. Ref. n. MA 31-177525/12-171. 20/14.



Permalink

Austria, Carinthia - at/84

Motorway

Prior information notice for ceiling refurbishment of the 7,865 m Karawanken tunnel on A11. The contract includes moving equipment such as lighting, video, radio, etc. Contact Asfinag Bau Management GmbH, att.n Markus Keller, Vienna, tel +43 6646010814565, fax +43 5010814562, e-mail markus.keller@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=333443-2013. 41/13.



Permalink

Open invitation to tender, deadline 12.03.2014, for planning and design of the second tube of A11 Karawanken tunnel. Duration of contract from 07.04.2014 to 30.04.2019. Contact Asfinag Bau Management GmbH, att.n Eng. Gernot Ruef, Vienna, tel +43 5010814443, fax +43 5010814420, e-mail gernot.ruef@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=036288-2014. 06/14.



Permalink

Strabag AG Direktion IC of Vienna secured the EUR2,958,429 contract, excluding VAT, for structural engineering works in Karawanken safety tunnel on A11. Contact Asfinag Bau Management GmbH, att.n Markus Keller, Vienna, tel +43 5010814560, fax +43 5010814562, e-mail markus.keller@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=-202097-2014. Ref. n. 2014 / @ AVA ID-Nr: 26667. 26/14.



Permalink

Open invitation to tender, deadline 22.09.2014, for general management during costruction of the second tube of A11 Karawanken tunnel. Duration of contract from 13.10.2014 to 30.6.2017. Contact Asfinag Bau Management GmbH, att.n Eng. Gernot Ruef, Vienna, tel +43 5010814443, fax +43 5010814420, e-mail gernot.ruef@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=301864-2014. Ref. 2014/@AVA ID-n. 32170. 37/14.



Permalink

PGK – Planungsgemeinschaft Karawankentunnel of Salzburg secured the EUR616,291.92 contract, excluding VAT,  for planning and design of the second tube of A11 Karawanken tunnel. Contact Asfinag Bau Management GmbH, att.n Eng. Gernot Ruef, Vienna, tel +43 5010814443, fax +43 5010814420, e-mail gernot.ruef@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=313424-2014. 38/14.



Permalink

The JV OEBA A11 Vorportal Karawankentunnel Nievelt Ingenieure GmbH & DI Thomas Zodl of Stockerau secured the EUR536,906 contract, excluding VAT, for general management during construction of the second tube of A11 Karawanken tunnel. Contact Asfinag Bau Management GmbH, att.n Eng. Gernot Ruef, Vienna, tel +43 5010814443, fax +43 5010814420, e-mail gernot.ruef@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120192-2015. Ref. 2014/@AVA ID-n. 32170. 19/15.



Permalink


Open invitation to tender, deadline 28.07.2016, for the supply of electrical and ventilation equipment in the second tube of the A11 Karawanken tunnel (8019 m). Duration of the contract is from 30/08/2016 to 31/12/2023. Contact Asfinag Bau Management GmbH, att.n Markus Keller, Vienna, tel +43 50108-14565, fax +43 50108-14362, e-mail markus.keller@asfinag.at. Visithttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=250074-2016 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200960-2016. Ref. 2016/PROVIA ID-n.4470. 30/16.




Permalink


Open invitation to tender, deadline 05.05.2017, for the general management for construction of the second tube of the A11 Karawanken tunnel (8019 m). Duration of the contract is from 01/06/2017 to 01/03/2022. Contact Asfinag Bau Management GmbH, att.n Gernot Ruef, Vienna, tel +43 50108-14443, fax +43 50108-14420, e-mail gernot.ruef@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=108003-2017  and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=166399-2017. Ref. 2017/PROVIA ID-n.8397. 17/17.




Permalink

Open invitation to tender, deadline 07.02.2018,  for the construction of the second tube (East tube) of the 8km Karavanke/Karawanken tunnel linking Slovenian A2 and Austrian A11 motorways. Duration contract 30/04/2018 to 31/12/2023. Contact Asfinag Bau Management GmbH, att.n Project Manager Vienna, tel +43 50108-14443, fax +43 50108-14120, email gernot.ruef@asfinag.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=502081-2017.

 Ref.n. 2017/PROVIA ID-N.13915. 03/18.



Permalink

Postponed from 07.02.2018 to 06.03.2018 the deadline of the open invitation for the construction of the second tube (East tube) of the 8km Karavanke/Karawanken tunnel linking Slovenian A2 and Austrian A11 motorways. Duration contract 30/04/2018 to 31/12/2023. Contact Asfinag Bau Management GmbH, att.n Project Manager Vienna, tel +43 50108-14443, fax

+43 50108-14120, email gernot.ruef@asfinag.at.  Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=032049-2018.

 Ref.n. 2017/PROVIA ID-N.13915. 04/18.



Permalink

The JV DIBIT Messtechnik GmbH (Innsbruck)/ DIBIT Messtechnik GmbH (Vienna) secured the EUR3.89 million contract, excluding VAT,  for the geotechnical-geodetic measurements, tunnel scanner  of the second tube of

A11 Karawanken tunnel. Contact Asfinag Bau Management GmbH, Asfinag Bau Management GmbH, Vienna, tel +43 50108-14447, fax +43 50108-14120, e-mail Marco.Sevim@asfinag.at. For bid documents click here.

Ref. 2018/PROVIA ID-n.15622. 10/19.



Permalink

The consortium Swietelsky Tunnelbau GmbH & Co KG (Salisburgo)/Swietelsky Baugesellschaft m.b.H. (Linz) secured the EUR89.88 million contract, excluding VAT, for the construction of the second tube (East tube) of the 8km Karavanke/Karawanken tunnel linking Slovenian A2 and Austrian A11 motorways. Contact Asfinag Bau Management GmbH, Vienna, tel +43 50108-14443, fax +43 50108-14252, email andreas.karlbauer@asfinag.at. For bid documents click here.

 Ref.n. 2017/PROVIA ID-N.13915. 10/19.



Permalink

Geo.zt gmbh from Hall in Tirol (A)  secured the contract and its subsequent parts for a total amount of EUR426,187, excluding VAT. This contract is for the monitoring and study of water resources during the construction of the second tube (East tube) of the 8km Karavanke/Karawanken tunnel linking Slovenian A2 and Austrian A11 motorways. Contact Asfinag Bau Management GmbH, Vienna, tel +43 66460108-14443, fax +43 50108-14362, email andreas.karlbauer@asfinag.at. For bid documents click here, here and here. Ref.n. ARES (2017) 5550210-14/11/2017. 36/19.



Permalink


Open invitation to tender, deadline 19/07/2022, for the design of the first tube refurbishment of the 8km Karavanke/Karawanken tunnel linking Slovenian A2 and Austrian A11 motorways. The duration of the contract is from 03/10/2022 al 31/12/2028. For bid documents, please click here. Contact Asfinaf, Vienna, tel +43 50108-14447, fax +43 50108-14362, email Marco.Sevim@asfinag.at. Visit  

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=377423-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=321831-2022.  Ref. 2022/PROVIA n.80551. 28/22. 




Permalink


The Joint Venture IL-Ingenieurbüro Laabmayr & Partner ZT GmbH (Salzburg),  IGT Geotechnik und Tunnelbau ZT GmbH (Salzburg) and  iC Consulenten ZT GmbH (Salzburg) have secured the EUR 1.08 million contract, excluding VAT, for the design of the first tube refurbishment of the 8km Karavanke/Karawanken tunnel linking Slovenian A2 and Austrian A11 motorways. Contact Asfinaf, Vienna, tel +43 50108-14447, fax +43 50108-14362, email Marco.Sevim@asfinag.at. Visit  

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=493164-2022.  Ref. 2022/PROVIA n.80551. 36/22. 



Permalink


Open invitation to tender, deadline 23/04/2024, for E&M equipment in the bitube Karawanken tunnel, motorway A11 (Package 02). Click here for bid/tender documents. Duration of the contract is from 01/08/2024 to 28/11/2028. Contact ASFINAG Bau Management GmbH, attn Eng. Markus Keller, Vienna, tel +43 6646010814565, fax +43 5010814562, email markus.keller@asfinag.at. Visit https://ted.europa.eu/en/notice/-/detail/159761-2024. Ref. Provia n. 114106. 12/24.



Permalink

Austria, Lower Austria - at/83

Railway

Closing Date: 15.10.2013 (Tender Closed)

Negotiated invitation to tender, deadline 15.10.2013, for planning and execution of the rehabilitation of catenary system in the Goesing tunnel, length 2,368 m, on the Mariazell Railway from St. Poelten to Mariazell. Contact Noevog, att.n Eng. Manfred Ploiner, St. Poelten, e-mail manfred.ploiner@noevog.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=318367-2013. 39/13.



Permalink

Europten GmbH of Vienna secured the EUR875 828, excluding VAT, for planning and execution of the rehabilitation of catenary system in the Goesing tunnel, length 2,368 m, on the railway from St. Poelten to Mariazell. Contact Noevog, att.n Eng. Manfred Ploiner, St. Poelten, e-mail manfred.ploiner@noevog.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=036872-2014. 06/14.



Permalink


Negotiated invitation to tender, deadline 26/08/2022, for structural inspections of all engineering structures (bridges, structural culverts, tunnels, special constructions) along the routes operated by the Lower Austrian Railways. Click here for tender documents, where tenders must be sent. The contract is composed of 2 lots. Duration of the contract will be 48 months. Contact Niederoesterreichische Verkehrsorganisationsges. m.b.H. (NÖVOG), St. Pölten, email vergabe@niederoesterreichbahnen.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=435917-2022. Ref.n. VergV014-2022/May.  32/22.   

 

 

Austria-St. Pölten: Engineering-related scientific and technical services


2022/S 152-435917

Contract notice – utilities

Services

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: Niederösterreichische Verkehrsorganisationsges. m.b.H. (NÖVOG)
National registration number: 9110015215427
Postal address: Werkstättenstraße 13
Town: St. Pölten
NUTS code: AT12 Niederösterreich
Postal code: 3100
Country: Austria
E-mail: vergabe@niederoesterreichbahnen.at
Internet address(es):
Main address: www.niederoesterreichbahnen.at
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://noevog.vergabeportal.at/Detail/132938
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted electronically via: https://noevog.vergabeportal.at/Detail/132938
I.6)Main activity
Railway services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


Rahmenvereinbarung Bauwerksprüfung konstruktive Ingenieurbauwerke


Reference number: VergV014-2022/May
II.1.2)Main CPV code
71350000 Engineering-related scientific and technical services
II.1.3)Type of contract
Services
II.1.4)Short description:


Alle konstruktiven Ingenieurbauwerke (Bücken, konstruktive Durchlässe, Tunnel, Sonderkonstruktionen) entlang der betriebenen Strecken der Niederösterreich Bahnen, sind durch Bauwerksprüfungen zu überwachen. Die Bauwerksprüfung der o.a. Bauwerke soll in Form einer Rahmenvereinbarung, in 2 Losen vergeben werden.


II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: yes
Tenders may be submitted for all lots
II.2)Description
II.2.1)Title:


Bauwerksprüfung von Brücken und konstruktiven Durchlässen sowie Sonderkonstruktionen (bspw Drehscheiben)


Lot No: 1
II.2.2)Additional CPV code(s)
71350000 Engineering-related scientific and technical services
II.2.3)Place of performance
NUTS code: AT12 Niederösterreich
Main site or place of performance:



II.2.4)Description of the procurement:


Bauwerksprüfung der Brücken und konstruktiven Durchlässe sowie Sonderkonstruktionen (bspw Drehscheiben) entlang der Eisenbahnstrecken der Niederösterreich Bahnen


II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 48
This contract is subject to renewal: yes
Description of renewals:


zweimalige Verlängerungsoption jeweils um 2 Jahre


II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: yes
Description of options:


zweimalige Verlängerungsoption jeweils um 2 Jahre


II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information



II.2)Description
II.2.1)Title:


Bauwerksprüfung von Tunnelbauwerken


Lot No: 2
II.2.2)Additional CPV code(s)
71350000 Engineering-related scientific and technical services
II.2.3)Place of performance
NUTS code: AT12 Niederösterreich
Main site or place of performance:



II.2.4)Description of the procurement:


Bauwerksprüfung der Tunnelbauwerke entlang der Eisenbahnstrecken der Niederösterreich Bahnen


II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 48
This contract is subject to renewal: yes
Description of renewals:


zweimalige Verlängerungsoption jeweils um 2 Jahre


II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: yes
Description of options:


zweimalige Verlängerungsoption jeweils um 2 Jahre


II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information



Section III: Legal, economic, financial and technical information

III.1)Conditions for participation
III.1.1)Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers
List and brief description of conditions:



III.1.2)Economic and financial standing
Selection criteria as stated in the procurement documents
III.1.3)Technical and professional ability
Selection criteria as stated in the procurement documents
III.1.4)Objective rules and criteria for participation
List and brief description of rules and criteria:



III.1.6)Deposits and guarantees required:



III.1.7)Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:



III.1.8)Legal form to be taken by the group of economic operators to whom the contract is to be awarded:



III.2)Conditions related to the contract
III.2.2)Contract performance conditions:



Section IV: Procedure

IV.1)Description
IV.1.1)Type of procedure
Negotiated procedure with prior call for competition
IV.1.3)Information about a framework agreement or a dynamic purchasing system
The procurement involves the establishment of a framework agreement
Framework agreement with a single operator
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: no
IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 26/08/2022
Local time: 10:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
German
IV.2.6)Minimum time frame during which the tenderer must maintain the tender
Duration in months: 5 (from the date stated for receipt of tender)

Section VI: Complementary information

VI.1)Information about recurrence
This is a recurrent procurement: no
VI.3)Additional information:



VI.4)Procedures for review




Permalink


The Lot2 for structural inspections of tunnels (Lot 2) along the railways operated by the Lower Austrian Railways was not awarded. Lot 1 for bridges and underground canals was awarded. Click here for the tender documents. Contact Niederoesterreichische Verkehrsorganisationsges. m.b.H. (NÖVOG), St. Pölten, email vergabe@niederoesterreichbahnen.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028374-2023 . Ref.n. VergV014-2022/May.  03/23.    




Permalink

Austria, Graz - at/82

Ring road

Closing Date: 25.10.2013 (Tender Closed)

Open invitation to tender, deadline 25.10.2013, for 2 km-long four-lane highway construction as extension to B67A ring road including 1,442 m-long tunnel. Contract duration 43 months. Specs and docs from Wolfgang Joebstl at STMK in Graz, tel +43 316877-3873, fax –5579, e-mail abteilung16@stmk.gv.at. Tenders or requests to participate should be sent to Gabriele Apetauer, tel +43 316877-4176, fax –5579, e-mail abteilung16@stmk.gv.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=292487-2013. 36/13.



Permalink

The JV Suedguertel Graz composed of Teerag-Asdag AG/Granit GmbH/Porr Bau of Unterpremstatten secured the contract for 2 km-long four-lane highway construction as extension to B67A ring road including 1,442 m-long tunnel in Graz. Contact from DI Reinhard Hinrichs at Amt der Steiermarkischen Landesregierung in Graz, tel +43 3168774206, e-mail abteilung16@stmk.gv.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=008979-2014. Bid code n. FA18B 026.16/2011-613. 03/14.



Permalink

Austria, Upper Austria - at/81

Highway

Closing Date: 06.09.2013 (Tender Closed)

Open invitation to tender, deadline 06.09.2013, for construction of 4.1 km north-east B1 Wienerstrasse section of Lambach bypass with 912 km-long tunnel, three bridges and farm buildings. Contract duration 37 months. Further information, specs and docs from Peter Pichler at LDZ in Linz, tel +43 732772012330, e-mail baub.post@ooe.gv.at, to whom tenders or requests to participate must be sent. Time limit for accessing documents 06.09.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=240472-2013. NUTS-Code AT31. 30/13.



Permalink

Open invitation to tender, deadline 29.01.2014, for geological and hydrogeological documentation of 4.1 km north-east B1 Wienerstrasse section of Lambach bypass with 912 km-long tunnel, three bridges and farm buildings. Contract duration 13 months after award. Further information from Upper Austria Government, Bridges and tunnels Dept. in Linz, tel +43 732772012330, fax +43 7327720212911, e-mail baub.post@ooe.gv.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=417513-2013. Ref.n. BauB-930001/0153-2013. 51/13.



Permalink

JV Dr. Fuerlinger/GC Geoconsult ZT GmbH of Salzburg secured the contract for geological and hydrogeological documentation of 4.1 km north-east B1 Wienerstrasse section of Lambach bypass with 912 m-long tunnel, three bridges and farm buildings. Contact Eng. Manfred Fellinger, Upper Austria Government, Bridges and tunnels Dept. in Linz, tel +43 732772012330, fax +43 7327720212911, e-mail baub.post@ooe.gv.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=145005-2014. Ref.n. BauB-930001/0153-2013. 18/14.



Permalink

Poyry Infra GmbH of Salzburg secured the contract for geotechnical engineering services of 4.1 km north-east B1 Wienerstrasse section of Lambach bypass with 912 m-long tunnel, three bridges and farm buildings. Contact Eng. Manfred Fellinger, Upper Austria Government, Bridges and tunnels Dept. in Linz, tel +43 732772012330, fax +43 7327720212911, e-mail baub.post@ooe.gv.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=145002-2014. Ref.n. BauB-930001/0164-2013. 18/14.



Permalink

Austria, Salzburg - at/80

Hydro

Closing Date: 30.01.2013 (Tender Closed)

Negotiated invitation to tender, deadline 30.01.2013, for detailed project for exploratory tunnel and holes for cavern of Tauernmoos power plant  in the Pinzgau region. The exploratory tunnel will be used as cavern access. The new pumped-storage scheme will provide additional regulating power for the railway electrical supply grid. Contract duration 01.08.2013-31.12.2013. Contact OEBB, Eng Hubert Schwaiger, Vienna, tel +43 51293000-4290, fax -5088, e-mail hubert.schwaiger@oebb.at. Further information from https://www.ava-online.at, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=017478-2013. 04/13. 



Permalink

Alpine BeMo Tunneling GmbH of Innsbruck secured the EUR2,995,061 contract, excluding VAT, for detailed project for exploratory tunnel and holes for cavern of Tauernmoos power plant  in the Pinzgau region. The exploratory tunnel will be used as cavern access. The new pumped-storage scheme will provide additional regulating power for the railway electrical supply grid. Contact OEBB, Eng Hubert Schwaiger, Vienna, tel +43 51293000-4290, fax -5088, e-mail hubert.schwaiger@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=259875-2013. 32/13.



Permalink

Austria, Upper Austria-Styria - at/79

Motorway

Prior Information Notice for refurbishment of EM equipment in Steinhaus (2.3 km) and Noitzmuehle (1.6 km) bi-tube tunnels on A8 Innkreis motorway. Contact Mrs Ingrid Ellmer at Asfinag in Vienna, tel  +43 50108143-60, fax -62, e-mail ingrid.ellmer@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=012237-2013. 03/13.



Permalink


Open invitation to tender, deadline 23/02/2021, for the upgrading of ventilation equipment in Steinhaus (2.3 km) and Noitzmuehle (1.6 km)twin-tube tunnels on  the A8 Innkreis motorway. Duration of the contract is from 30/04/2021 to 31/12/2027. Contact Asfinag in Vienna, tel  +43 50108-14541, fax  +43 50108-914541, email manuel.schoenhuber@asfinag.at. For further on the tender, please click here and here. 04/21.




Permalink


Open invitation to tender, deadline 09/03/2021, for tender planning for upgrading works in Steinhaus (2.3 km) and Noitzmuehle (1.6 km) twin-tube tunnels on the A8 Innkreis motorway. Duration of the contract is from 05/04/2021 to 31/12/2025. Contact Asfinag in Vienna, tel  +43 50108-14453, fax  +43 50108-14452, email claudia.seyer@asfinag.at. For further on the tender, please click here and here. Ref.n. 2021/PROVIA ID-n. 59532. 07/21. 

 




Permalink


Thermo- and Fluid Dynamics Consulting Engineer e.U., Ingenieurbüro für Maschinenbau HBI Haerter AG  from Eisenkappel secured the EUR217,800 contract, excluding VAT, for the upgrading of ventilation equipment in Steinhaus (2.3 km) and Noitzmuehle (1.6 km)twin-tube tunnels on  the A8 Innkreis motorway. Contact Asfinag in Vienna, tel  +43 50108-14541, fax  +43 50108-914541, email manuel.schoenhuber@asfinag.at. For further on the tender, please click here. 20/21. 

 




Permalink


Ingenieurbüro ste.p ZT-GmbH, Zentrale IL — Ingenieurbüro Laabmayr & Partner ZT GesmbH., Zentrale pA Ingenieurbüro ste.p ZT-GmbH from Vienna secured the EUR 556,690 contract, excluding VAT, for tender planning for upgrading works in Steinhaus (2.3 km) and Noitzmuehle (1.6 km) twin-tube tunnels on the A8 Innkreis motorway. Contact Asfinag in Vienna, tel  +43 50108-14453, fax  +43 50108-14452, email claudia.seyer@asfinag.at. For further on the tender, please click here. Ref.n. 2021/PROVIA ID-n. 59532. 22/21. 





Permalink

 

Open invitation to tender, deadline 12/12/2022, for local construction supervision during the upgrading works of the Steinhaus (2.3 km) and Noitzmuehle (1.6 km) twin-tube tunnels on the A8 Innkreis motorway. Click here for tender documents. Duration of the contract is from 01/03/2023 to 01/03/2028. Contact Asfinag, attn Christian Mietler, Vienna, tel  +43 664/6010814537, fax+43 50108/14522, email christian.mietler@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=617711-2022. Ref.n. 2022/PROVIA n.89887. 45/22. 

Austria-Vienna: Construction supervision services
2022/S 215-617711

Contract notice

Services

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft
Postal address: Schnirchgasse 17
Town: Wien
NUTS code: AT Österreich
Postal code: 1030
Country: Austria
Contact person: BMG / EM, Christian Mietler
E-mail: christian.mietler@asfinag.at
Telephone: +43 664/6010814537
Fax: +43 50108/14522
Internet address(es):
Main address: www.asfinag.at
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: www.provia.at
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted to the abovementioned address
I.4)Type of the contracting authority
Body governed by public law
I.5)Main activity
Other activity: Infrastrukturbetreiber

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

A08 Innkreis Autobahn, Tunnel Steinhaus und Tunnel Noitzmühle - Örtliche Bauaufsicht

Reference number: 2022/PROVIA ID-Nr:89887
II.1.2)Main CPV code
71520000 Construction supervision services
II.1.3)Type of contract
Services
II.1.4)Short description:

Örtliche Bauaufsicht für das Projekt Sanierung A08 Tunnel Steinhaus und Tunnel Noitzmühle.

II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: AT Österreich
Main site or place of performance:

Projektgebiet und Wien

II.2.4)Description of the procurement:

A08 Innkreis Autobahn, Tunnel Steinhaus und Tunnel Noitzmühle - Örtliche Bauaufsicht

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/03/2023
End: 01/03/2028
This contract is subject to renewal: no
II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: yes
Description of options:

Zusätzliches Personal

II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation
III.1.2)Economic and financial standing
Selection criteria as stated in the procurement documents
III.1.3)Technical and professional ability
Selection criteria as stated in the procurement documents
III.2)Conditions related to the contract
III.2.1)Information about a particular profession
Execution of the service is reserved to a particular profession
Reference to the relevant law, regulation or administrative provision:

Es wird ausdrücklich auf die Anforderungen der EWR-Architektenverordnung bzw. der EWR - Ingenieurkonsulentenverordnung hingewiesen.

Section IV: Procedure

IV.1)Description
IV.1.1)Type of procedure
Open procedure
IV.1.3)Information about a framework agreement or a dynamic purchasing system
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: yes
IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 12/12/2022
Local time: 11:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
German
IV.2.7)Conditions for opening of tenders
Date: 12/12/2022
Local time: 11:00

Section VI: Complementary information

VI.1)Information about recurrence
This is a recurrent procurement: no
VI.2)Information about electronic workflows
Electronic ordering will be used
Electronic invoicing will be accepted
Electronic payment will be used
VI.3)Additional information:

Die vom Auftraggeber verlangten Nachweise gem. §§ 80 ff BVergG sind den Ausschreibungsunterlagen zu entnehmen. Auf die Bestimmungen des § 21 BVergG wird ausdrücklich hingewiesen. Auf Grund der durch das Coronavirus hervorgerufenen Ausnahmesituation finden keine Angebotsöffnungen öffentlich statt. Nationale Erkennungsnummer: [L-859552-2b3]

VI.4)Procedures for review
VI.4.1)Review body
Official name: Bundesverwaltungsgericht
Postal address: Erdbergstraße 192-196
Town: Wien
Postal code: 1030
Country: Austria
E-mail: einlaufstelle@bvwg.gv.at
Telephone: +43 1/601490
VI.4.4)Service from which information about the review procedure may be obtained
Official name: Bundesverwaltungsgericht
Postal address: Erdbergstraße 192-196
Town: Wien
Postal code: 1030
Country: Austria
E-mail: einlaufstelle@bvwg.gv.at
Telephone: +43 1/601490
VI.5)Date of dispatch of this notice:
03/11/2022



Permalink


Open invitation to tender, deadline 30/03/2023, for local construction supervision E&M during the E&M upgrading works of the Steinhaus (2.3 km) and Noitzmuehle (1.6 km) twin-tube tunnels on the A8 Innkreis motorway. Click here for tender documents. Duration of the contract is from 01/05/2023 to 01/03/2028. Contact Asfinag, Vienna, tel  +43 05010814520, fax +43 05010814522, email andrea.ginner@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=122337-2023. Ref.n. 2023/PROVIA n.95385. 09/23.  

 

Österreich-Wien: Dienstleistungen von Architektur-, Konstruktions- und Ingenieurbüros und Prüfstellen


2023/S 042-122337

Auftragsbekanntmachung

Dienstleistungen

Rechtsgrundlage:
Richtlinie 2014/24/EU

Abschnitt I: Öffentlicher Auftraggeber

I.1)Name und Adressen
Offizielle Bezeichnung: Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft
Postanschrift: z.H. ASFINAG Bau Management GmbH, Schnirchgasse 17
Ort: Wien
NUTS-Code: AT Österreich
Postleitzahl: 1030
Land: Österreich
Kontaktstelle(n): Elektrotechnische und Maschinelle Ausrüstung
E-Mail: andrea.ginner@asfinag.at
Telefon: +43 05010814520
Fax: +43 05010814522
Internet-Adresse(n):
Hauptadresse: www.asfinag.at
I.3)Kommunikation
Die Auftragsunterlagen stehen für einen uneingeschränkten und vollständigen direkten Zugang gebührenfrei zur Verfügung unter: www.provia.at
Weitere Auskünfte erteilen/erteilt die oben genannten Kontaktstellen
Angebote oder Teilnahmeanträge sind einzureichen an die oben genannten Kontaktstellen
I.4)Art des öffentlichen Auftraggebers
Einrichtung des öffentlichen Rechts
I.5)Haupttätigkeit(en)
Andere Tätigkeit: Infrastrukturbetreiber

Abschnitt II: Gegenstand

II.1)Umfang der Beschaffung
II.1.1)Bezeichnung des Auftrags:


A08, Tunnel Steinhaus/Noitzmühle und Galerie Taxlberg, Örtliche Bauaufsicht E&M


Referenznummer der Bekanntmachung: 2023/PROVIA ID-Nr:95385
II.1.2)CPV-Code Hauptteil
71000000 Dienstleistungen von Architektur-, Konstruktions- und Ingenieurbüros und Prüfstellen
II.1.3)Art des Auftrags
Dienstleistungen
II.1.4)Kurze Beschreibung:


Örtliche Bauaufsicht E&M für das Projekt Sanierung A08 Tunnel Steinhaus und Tunnel Noitzmühle.


II.1.5)Geschätzter Gesamtwert
II.1.6)Angaben zu den Losen
Aufteilung des Auftrags in Lose: nein
II.2)Beschreibung
II.2.3)Erfüllungsort
NUTS-Code: AT Österreich
Hauptort der Ausführung:


Projektgebiet und Wien


II.2.4)Beschreibung der Beschaffung:


Örtliche Bauaufsicht E&M für das Projekt Sanierung A08 Tunnel Steinhaus und Tunnel Noitzmühle.


II.2.5)Zuschlagskriterien
Der Preis ist nicht das einzige Zuschlagskriterium; alle Kriterien sind nur in den Beschaffungsunterlagen aufgeführt
II.2.6)Geschätzter Wert
II.2.7)Laufzeit des Vertrags, der Rahmenvereinbarung oder des dynamischen Beschaffungssystems
Beginn: 01/05/2023
Ende: 01/03/2028
Dieser Auftrag kann verlängert werden: nein
II.2.10)Angaben über Varianten/Alternativangebote
Varianten/Alternativangebote sind zulässig: nein
II.2.11)Angaben zu Optionen
Optionen: ja
Beschreibung der Optionen:


Bauwart und Techniker


II.2.13)Angaben zu Mitteln der Europäischen Union
Der Auftrag steht in Verbindung mit einem Vorhaben und/oder Programm, das aus Mitteln der EU finanziert wird: nein
II.2.14)Zusätzliche Angaben

Abschnitt III: Rechtliche, wirtschaftliche, finanzielle und technische Angaben

III.1)Teilnahmebedingungen
III.1.2)Wirtschaftliche und finanzielle Leistungsfähigkeit
Eignungskriterien gemäß Auftragsunterlagen
III.1.3)Technische und berufliche Leistungsfähigkeit
Eignungskriterien gemäß Auftragsunterlagen
III.2)Bedingungen für den Auftrag
III.2.1)Angaben zu einem besonderen Berufsstand
Die Erbringung der Dienstleistung ist einem besonderen Berufsstand vorbehalten
Verweis auf die einschlägige Rechts- oder Verwaltungsvorschrift:


Es ist ausdrücklich auf die Anforderungen der EWR - Architektenverordnung bzw. der EWR - Ingenieurkonsulentenverordnung hingewiesen.


Abschnitt IV: Verfahren

IV.1)Beschreibung
IV.1.1)Verfahrensart
Offenes Verfahren
IV.1.3)Angaben zur Rahmenvereinbarung oder zum dynamischen Beschaffungssystem
IV.1.8)Angaben zum Beschaffungsübereinkommen (GPA)
Der Auftrag fällt unter das Beschaffungsübereinkommen: ja
IV.2)Verwaltungsangaben
IV.2.2)Schlusstermin für den Eingang der Angebote oder Teilnahmeanträge
Tag: 30/03/2023
Ortszeit: 11:00
IV.2.3)Voraussichtlicher Tag der Absendung der Aufforderungen zur Angebotsabgabe bzw. zur Teilnahme an ausgewählte Bewerber
IV.2.4)Sprache(n), in der (denen) Angebote oder Teilnahmeanträge eingereicht werden können:
Deutsch
IV.2.7)Bedingungen für die Öffnung der Angebote
Tag: 30/03/2023
Ortszeit: 11:00
Ort:


ASFINAG BMG, 1030 Wien, Schnirchgasse 17


Abschnitt VI: Weitere Angaben

VI.1)Angaben zur Wiederkehr des Auftrags
Dies ist ein wiederkehrender Auftrag: nein
VI.2)Angaben zu elektronischen Arbeitsabläufen
Aufträge werden elektronisch erteilt
Die elektronische Rechnungsstellung wird akzeptiert
Die Zahlung erfolgt elektronisch
VI.3)Zusätzliche Angaben:


Die vom Auftraggeber verlangten Nachweise gem. §§ 80ff BVergG sind den Ausschreibungsunterlagen zu entnehmen. Auf die Bestimmungen des §21 BVergG wird ausdrücklich hingewiesen. Nationale Erkennungsnummer: [L-882855-3223]


VI.4)Rechtsbehelfsverfahren/Nachprüfungsverfahren
VI.4.1)Zuständige Stelle für Rechtsbehelfs-/Nachprüfungsverfahren
Offizielle Bezeichnung: Bundesverwaltungsgericht
Postanschrift: Erdbergstraße 192-196
Ort: Wien
Postleitzahl: 1030
Land: Österreich
E-Mail: einlaufstelle@bvwg.gv.at
Telefon: +43 1601490
VI.4.4)Stelle, die Auskünfte über die Einlegung von Rechtsbehelfen erteilt
Offizielle Bezeichnung: Bundesverwaltungsgericht
Postanschrift: Erdbergstraße 192-196
Ort: Wien
Postleitzahl: 1030
Land: Österreich
E-Mail: einlaufstelle@bvwg.gv.at
Telefon: +43 1601490
VI.5)Tag der Absendung dieser Bekanntmachung:
23/02/2023



Permalink


Lechner & Partner ZT KG from Klosterneuburg secured the EUR 3 million contract, excluding VAT, for local construction supervision during the E&M upgrading works of the Steinhaus (2.3 km) and Noitzmuehle (1.6 km) twin-tube tunnels on the A8 Innkreis motorway. Contact Asfinag, Vienna, tel  +43 05010814520, fax +43 05010814522, email andrea.ginner@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=418842-2023. Ref.n. 2023/PROVIA n.95385. 28/23.   



Permalink

Austria, Lower Austria - at/78

Railway

Oebb Infrastruktur, which is upgrading the Westbahn rail line, has awarded Strabag Ag the EUR32.6 million contract to build the section West between St. Poelten and Loosdorf, including construction of the 390 m Radleiten cut/cover tunnel, the Radleiten trough with Wildbruecke bridge, and the 822 m-long Bruendlkapellen tunnel. The project also includes reinforced concrete structures, earthworks and track substructure, drainage facilities, road construction, and noise mitigation measures. The St Poelten–Loosdorf Gap closure (previously St Poelten freight train bypass) will significantly reduce the volume of freight and through traffic for St. Poelten station and local residents from 2017. The new dual track line will take freight trains around the centre of St.Poelten along a length of 24.7 km. The line is being built as part of the four-track upgrade of the Westbahn, and is a component of its Vienna–Salzburg section. In the east, the line links up to the existing Westbahn at Wagram Junction. In the west, it connects to the existing line at Loosdorf (Rohr Junction). Construction time is January, 2013–July, 2015. Visit www.oebb.at and www.strabag.com. 49/12.



Permalink


Open invitation to tender, deadline 04.11.2015, for the supply and installation of ventilation systems for smoke control emergency exits in Pummersdorfer (3.5 km) and Bruendlkapellen (822 m) railway tunnels. Tender period from 04/04/2016 to 31/01/2017. For electronic access to information and for sending in offers visit www.ava-online.at. Contact Oebb-Infrastruktur Aktiengesellschaft, att.ne Ing. Roger Pieler, Vienna, tel +43 19300045705 Fax +43 19300045739, email roger.pieler@oebb.at.Collegarsi to http: //ted.europa.eu/udl? request = Seek-Deliver & language = en & docid = 319701-2015 OJ S 176. Ref. 2015 / @ AVA ID-N41932. 37/15.




Permalink


GETEC GmbH Energie- und Gebäudetechnik from Vienna secured the EUR1.19 million contract, excluding VAT, for the supply and installation of ventilation systems for smoke control emergency exits in Pummersdorfer (3.5 km) and Bruendlkapellen (822 m) railway tunnels. For more information contact Oebb-Infrastruktur Aktiengesellschaft, att.ne Ing. Roger Pieler, Vienna, tel +43 19300045705 Fax +43 19300045739, email roger.pieler@oebb.at. Collegarsi to http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=119096-2016. Ref. 2015/@AVA ID-N41932. 15/16.




Permalink

Austria, Carinthia - at/77

Motorway

Prior information notice of start of award procedures on 18.03.2013 for Phase 1 of the tunnels refurbishment on A2, northern Klagenfurt bypass. The tunnels are Haidach (450 m, 450 m), Reigersdorf (300 m, 300 m), Farchern-Ost (230 m, 230 m), Farchern-West (140 m, 140 m),  Ehrentalerberg (3,345 m, 3,345 m),  Lendorf (800 m, 800 m), Trettnig (450 m, 450 m) and Falkenberg (1,170 m, 1,170 m). Contact Asfinag, att.ne Thomas Nessel, Vienna, tel +43 50108-14563, fax +43 50108-914563, e-mail thomas.nessel@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=375187-2012. 49/12.



Permalink

Open invitation to tender, deadline 29.01.2013, for site supervision during the tunnels refurbishment on A2, northern Klagenfurt bypass. Contract duration 07.02.2013 to 02.10.2015. Contact Asfinag, att.n Joachim Schrunner, Vienna, tel +43 50108-14264, fax +43 50108-14262, e-mail joachim.schrunner@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=390430-2012. 50/12.



Permalink

Austria,  - at/77Closing date: 08.05.2013

Open invitation to tender, deadline 08.05.2013, for renewal of E&M and safety equipment in A2 tunnels on northern Klagenfurt bypass. Contract duration 02.09.2013 to 21.05.2015. Contact ASFINAG Bau Management GmbH, att.n Eng. Thomas Nessel, Vienna, tel +43 5010814563, fax +43 5010814562, e-mail thomas.nessel@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=107089-2013. 14/13.



Permalink

The JV Kastner ZT GmbH & zConsult ZT of Klagenfurt secured the EUR513,175.15 excluding VAT contract for site supervision during the tunnels refurbishment on A2, northern Klagenfurt bypass. Contact Asfinag, att.n Joachim Schrunner, Vienna, tel +43 50108-14264, fax +43 50108-14262, e-mail joachim.schrunner@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=270919-2013. 33/13.



Permalink


Open invitation to tender, deadline 07.12.2016, for Phase 2 (construction and E&M)  for refurbishment of tunnels on the A2, northern Klagenfurt bypass. The tunnels are Ehrentalerberg (3,345 m, 3,345 m),  Lendorf (800 m, 800 m), Trettnig (450 m, 450 m) and Falkenberg (1,170 m, 1,170 m). The contract is composed of 3 lots. Duration of the contract is 13 months from award. Contact Asfinag, att.n Eng. Erich Presslauer, Vienna, tel +43 50108-14255, fax +43 50108-14252, e-mail erich.presslauer@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 218073-2016 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=409547-2016. Ref.n. 2016/PROVIA ID-N.6860. 47/16. 




Permalink


Postponed from 07.12.2016 to 14.12.2016 the deadline for the open invitation to tender for Phase 2 (construction and E&M)  for the refurbishment of tunnels on the A2, northern Klagenfurt bypass. The tunnels are Ehrentalerberg (3,345 m, 3,345 m),  Lendorf (800 m, 800 m), Trettnig (450 m, 450 m) and Falkenberg (1,170 m, 1,170 m). The contract is composed of 3 lots. Duration of the contract is 13 months from award. Contact Asfinag, att.n Eng. Erich Presslauer, Vienna, tel +43 50108-14255, fax +43 50108-14252, e-mail erich.presslauer@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=422484-2016. Ref.n. 2016/PROVIA ID-N.6860. 49/16. 




Permalink


Open invitation to tender, deadline 15/11/2021, for the local management for partial refurbishment  of northern Klagenfurt bypass (A2), including Ehrentalerberg (3,345 m, 3,345 m) and Falkenberg (1,170 m, 1,170 m) tunnels. Duration of the contract is from 20/01/2022 to 30/06/2023. Contact Asfinag, attn Eng. Christian Muthspiel, Vienna, tel +43 50108-14564, fax +43 50108-14562, email christian.muthspiel@asfinag.at . Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=524487-2021. Ref.n. 2021/PROVIA ID-N.71793. 41/21. 

Austria-Vienna: Construction supervision services


2021/S 201-524487

Contract notice

Services

Legal Basis:
Directive 2014/24/EU
Section I: Contracting authority

I.1)
Name and addresses
Official name: Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft
Postal address: ASFINAG Bau Management GmbH, Modecenterstraße 16
Town: Wien
NUTS code: AT Österreich
Postal code: 1030
Country: Austria
Contact person: Christian Muthspiel
E-mail: christian.muthspiel@asfinag.at
Telephone: +43 50108-14564
Fax: +43 50108-14562
Internet address(es):
Main address: www.asfinag.at
I.3)
Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: www.provia.at
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted to the abovementioned address
I.4)
Type of the contracting authority
Body governed by public law
I.5)
Main activity
Other activity: Infrastrukturbetreiber
Section II: Object

II.1)
Scope of the procurement
II.1.1)
Title:
A02 SüdAutobahn - Nordumfahrung Klagenfurt (NUK) Teilsanierung 2022 - ÖBA EM

Reference number: 2021/PROVIA ID-Nr:71793
II.1.2)
Main CPV code
71520000 Construction supervision services
II.1.3)
Type of contract
Services
II.1.4)
Short description:
Örtliche Bauaufsicht für die A02 SüdAutobahn, Teilsanierung Nordumfahrung Klagenfurt (NUK - Ehrentalerbergtunnel, UFT Lendorf, UFT Trettnig, Falkenbergtunnnel)- Durchfahrtsbeleuchtung LED (nur Retro Einheit LED)- Einfahrtsbeleuchtung LED (nur Retro Einheit LED)- Bordsteinbeleuchtung- gegebenenfalls erforderliche Kleinbaumaßnahmen- Tausch von 2 Tunnelkopfrechner (Falkenberg- und Ehrentalerbergtunnel)- Tausch sämtlicher verbauten LStE- Systemupgrade zur Erfüllung sämtlicher Vorgaben gem. geltender NIS-Verordnung

II.1.5)
Estimated total value
II.1.6)
Information about lots
This contract is divided into lots: no
II.2)
Description
II.2.3)
Place of performance
NUTS code: AT Österreich
Main site or place of performance:
Projektgebiet und Kärnten

II.2.4)
Description of the procurement:
A02 SüdAutobahn - Nordumfahrung Klagenfurt (NUK) Teilsanierung 2022 - ÖBA EM

II.2.5)
Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)
Estimated value
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Start: 20/01/2022
End: 30/06/2023
This contract is subject to renewal: no
II.2.10)
Information about variants
Variants will be accepted: no
II.2.11)
Information about options
Options: no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)
Additional information
Section III: Legal, economic, financial and technical information

III.1)
Conditions for participation
III.1.2)
Economic and financial standing
Selection criteria as stated in the procurement documents
III.1.3)
Technical and professional ability
Selection criteria as stated in the procurement documents
III.2)
Conditions related to the contract
III.2.1)
Information about a particular profession
Execution of the service is reserved to a particular profession
Reference to the relevant law, regulation or administrative provision:
Es wird ausdrücklich auf die Anforderungen der EWR-Architektenverordnung bzw. der EWR-Ingenieurkonsulentenverordnung hingewiesen.

Section IV: Procedure

IV.1)
Description
IV.1.1)
Type of procedure
Open procedure
IV.1.3)
Information about a framework agreement or a dynamic purchasing system
IV.1.8)
Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: yes
IV.2)
Administrative information
IV.2.2)
Time limit for receipt of tenders or requests to participate
Date: 15/11/2021
Local time: 09:00
IV.2.3)
Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)
Languages in which tenders or requests to participate may be submitted:
German
IV.2.6)
Minimum time frame during which the tenderer must maintain the tender
Duration in months: 3 (from the date stated for receipt of tender)
IV.2.7)
Conditions for opening of tenders
Date: 15/11/2021
Local time: 09:00
Place:
ABM Villach / Skype

Section VI: Complementary information

VI.1)
Information about recurrence
This is a recurrent procurement: no
VI.2)
Information about electronic workflows
Electronic ordering will be used
Electronic invoicing will be accepted
Electronic payment will be used
VI.3)
Additional information:
Die vom Auftraggeber verlangten Nachweise gem. §§ 80 ff BVergG sind den Ausschreibungsunterlagen zu entnehmen. Auf die Bestimmungen des § 21 BVergG wird ausdrücklich hingewiesen. Nationale Erkennungsnummer: [L-807626-1a12]

VI.4)
Procedures for review
VI.4.1)
Review body
Official name: Bundesverwaltungsgericht
Postal address: Erdbergstraße 192-196
Town: Wien
Postal code: 1030
Country: Austria
E-mail: einlaufstelle@bvwg.gv.at
Telephone: +43 160149-0
VI.4.4)
Service from which information about the review procedure may be obtained
Official name: Bundesverwaltungsgericht
Postal address: Erdbergstraße 192-196
Town: Wien
Postal code: 1030
Country: Austria
E-mail: einlaufstelle@bvwg.gv.at
Telephone: +43 160149-0
VI.5)
Date of dispatch of this notice:
12/10/2021



Permalink


Postponed from 15/11/2021 to 24/11/2021 the deadline of the open invitation to tender for the local management for partial refurbishment  of the northern Klagenfurt bypass (A2), including the Ehrentalerberg (3,345 m, 3,345 m) and Falkenberg (1,170 m, 1,170 m) tunnels. Duration of the contract is from 20/01/2022 to 30/06/2023. Contact Asfinag, attn Eng. Christian Muthspiel, Vienna, tel +43 50108-14564, fax +43 50108-14562, email christian.muthspiel@asfinag.at . Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=595810-2021. Ref.n. 2021/PROVIA ID-N.71793. 47/21.



Permalink


Elcon GmbH from Klagenfurt secured the EUR 238,570 contract, excluding VAT, for the local management for partial refurbishment of the northern Klagenfurt bypass (A2), including Ehrentalerberg (3,345 m, 3,345 m) and Falkenberg (1,170 m, 1,170 m) tunnels. Contact Asfinag, attn Eng. Christian Muthspiel, Vienna, tel +43 50108-14564, fax +43 50108-14562, email christian.muthspiel@asfinag.at . Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103919-2022. Ref.n. 2021/PROVIA ID-N.71793. 08/22.



Permalink

Austria, Carinthia - at/76

Hydro

Poyry has been awarded contracts worth EUR 9.2 million by VERBUND-Austrian Hydro Power AG (AHP) for engineering services and site supervision during construction of the Reisseck II pumped storage plant from June 2010 until completion in third quarter 2014. Reisseck II will connect two existing plants: Reisseck-Kreuzeck storage power plant; and Malta power plant main stage. The existing Reisseck-Kreuzeck reservoir will be used as upper reservoir with Malta main stage providing the lower reservoir. A 5 km-long power tunnel and pressure shaft will be developed to the powerhouse cavern, where two sets of reversible 215 kW Francis-pump turbines will be located. The downstream connection involves a 203 m-long pressure tunnel. Click here for more. 26/10.



Permalink