Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Carrara - it/83

Road

Open call for bids, deadline 8th April, 2003 for construction of lot 1 "Miseglia" of the Marble Road including the 998 m-long 9 m-wide Santa Croce tunnel, single tube, and a 270 m-long emergency tunnel. Tender value €18.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=030187-2003, OJ S 36, or contact Progetto Carrara SpA, Carrara, fax +39 058570842. Also visit www.comune.carrara.ms.it 10/03.Open call for bids, deadline 18th April, 2005 for construction of lot II Aurelia (4.5 km) on the Marble road, including three single bored tunnels: Monte Greco (2,399 m), Corvenale (211 m) and Macina (900 m), and one cut-and-cover tunnel (30 m). Each tunnel will carry two 3.5 m-wide lanes, two 1 m-wide shoulders and two 0.8 m-wide pavements. Drill/blast method with steel arches, welded mesh and shotcrete as support, plus fore piling, bolting and jet grouting when necessary. Tender estimate: EUR68 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040294-2005, OJ S 42, or contact Progetto Carrara SpA, Carrara, fax +39 0585778623. E-mail progettocarrara@progettocarrara.191.it and view a video at www.comune.carrara.ms.it/Allegati/380.wmv 11/05.



Permalink

Italy, Turin - it/82

Road

Preinformation notice for the construction of the SR 23 bypass in Pinerolo, San Secondo, Porte and San Germano including two tunnels: Craviale (1,043 m) and Turina (660 m). Tender value: €55-€57 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=010222-2003 or contact Agenzia per lo svolgimento dei XX Giochi Olimpici Invernali Torino 2006, Turin, fax +39 0115221214. Also visit www.agenziatorino2006.it 05/03.Open call for bids, deadline 5th June, 2003 for construction of the Porte bypass including the Craviale and Turina tunnels, lengths of 1,043 m and 660 m respectively. Engineering studies by Studio Corona / Geodata / Infratec / Italtec Ingegneria / Franco Grasso / Vincenzo Procopio / Pietro Rousset. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=077531-2003, OJ S 87, or contact Agenzia per lo svolgimento dei XX Giochi Olimpici invernali, Turin, fax +39 0115221214. Also visit www.agenziatorino2006.it 20/03.The Porte bypass to trunk road SS 23 in Sestriere will be built by Baldassini Tognozzi Costruzioni for €42.5 million. Includes two tunnels in Turina (660 m) and Craviale (1,043 m). Visit www.baldassinitognozzi.it 37/03.Preinformation notice for construction of the Avigliana bypass, including a 1.7 km tunnel connecting Buttigliera and Avigliana and a 250 m tunnel under the Torino-Modane railway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=003963-2004, OJ S 5, or contact Agenzia per lo svolgimento dei XX Giochi Olimpici invernali, Turin, fax +39 0115221214. Also visit www.agenziatorino2006.it 03/04.Baldassini Tognozzi acquired a new three-boom Rocket Boomer WL3 C supplied by Atlas Copco to drive the 1,060 m-long Craviale tunnel. To date, 200 m has been driven on the east drive. Two blasts per day. The local residents are warned prior to each blast. Later on, the machine will start the west drive, where construction of the portal is under way, to allow for concreting on the east drive. Atlas Copco also supplied a two-boom Rocket Boomer 353 for the 600 m Turina tunnel. First blast scheduled for mid-March. Portals under way. Explosives supplied by SEI. Visit www.atlascopco.com, www.sei-spa.com and www.baldassinitognozzi.it 10/04.Agenzia Torino 2006 awarded to Grassetto, CO.GE.FA, Kopa Engineering, Euroimpianti Electronic, and Torino Elettrica Costruzioni contract 1 of the road 589 bypass in Avigliana, which will connect motorway A32 Turin-Bardonecchia. The contract is worth EUR53 million. Contract 1 includes a 1,960 m bored tunnel under Mount Cuneo and a cut-and-cover tunnel under Bachiasso interchange. Visit www.agenziatorino2006.it and www.grassetto.it 30/04.



Permalink

Italy, Rome - it/81

Metro

  Open call for bids, deadline 24th February, 2003 for 2.7 km-long line B extension from Rebibbia to GRA with stations in Tor Cervera, San Basilio and GRA. Cut-and-cover method. Tender value: €146.5 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=001234-2003, OJ S 2, or contact Comune di Roma, Rome, fax +39 065740033. E-mail p.donia@comune.roma.it. Visit http://www.comune.roma.it/dipvii/traspub/linea_b/home.html#1 03/03.Open call for bids, deadline 14th April, 2003 for engineering services for the design of the 2.7 km cut-and-cover extension from Rebibbia to GRA on Line B. Tender value: €3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=030737-2003, OJ S 36, or contact Comune di Roma, Rome, fax +39 065740033. E-mail p.donia@comune.roma.it 09/03.A JV between C. Lotti & Associati, Geodata, Siteco, and A2GP is the winner of a €2.6 million contract for the preliminary design of the 2.7 km Rebibbia-GRA extension to Line B. Visit www.lottiassociati.com and www.geodata.it 02/04.



Permalink

Open invitation to tender, deadline 01.12.2009, for design and construction of the 3.8 km-long Rome metro line B extension from Rebibbia to Casal Monastero, including three new stations. Contract value EUR447.6 million. Contact Ing. Luigi Napoli, Roma Metropolitane, Rome, tel +39 (0)6 454640-100, fax -321. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185228-2009. 29/09.



Permalink

Postponed deadline, from 01.12.2009 to 08.03.2010, of the open invitation to tender for design and construction of the 3.8 km-long Rome metro line B extension from Rebibbia to Casal Monastero, including three new stations. Contract value EUR447.6 million. Contact Ing. Luigi Napoli, Roma Metropolitane, Rome, tel +39 (0)6 454640-100, fax -321. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=330878-2009. 50/09.



Permalink

Deadline postponed from 01.12.2009 to 08.07.2010 for open invitation to tender for design and construction of 3.8 km-long line B extension from Rebibbia to Casal Monastero, including three new stations. Contract value EUR447.6 million. For written information, deadline 08.06.2010, contact fax +39 (0)6 454640321. Contact Ing. Luigi Napoli, Roma Metropolitane, Rome, tel +39 (0)6 454640-100, fax -321. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=069522-2010. 11/10.



Permalink

Additional information for open invitation to tender, deadline 08.07.2010, for design and construction of 3.8 km-long line B extension from Rebibbia to Casal Monastero, including three new stations. Contact Ing. Luigi Napoli, Roma Metropolitane, Rome, tel +39 (0)6 454640-100, fax -321. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=098100-2010. 14/10.



Permalink

The JV Salini Costruttori/Vianini Lavori/Ansaldo STS secured the contract for design and construction of the 3.8 km-long Rome metro line B extension from Rebibbia to Casal Monastero, including three new stations. Contract value EUR443.3 million excluding VAT. Contact Arch. Domenico Sandri, Roma Metropolitane, Rome, tel +39 (0)6 454640100, fax +39 (0)6 454640321. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=303490-2011.40/11.



Permalink


Open invitation to tender, deadline 04.05.2016, for the upgrading design and the building of tunnel lighting and for the construction of fire detection equipment in stations on line B of the Rome Metro. Duration of the contract is 345 days from award. The contract value is EUR12.39 million, excluding VAT. For electronic access to information and submission of tenders http://atac.i-faber.com. For further information contact ATAC SpA,  Roma, tel +39 064695-3785/4649, fax +39 0646954407. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=74743-2016. Bid n. 32/2016 10/16.




Permalink

Open invitation to tender, deadline 08.04.2019, for dynamic surveys with laser scanner technology and for thermographic surveys (of only the sections inside tunnels) of the A and B metro lines of Rome Metro, including the relative explanations and reports. Duration of the contract is 231 days, the value of the contract is EUR527,275.6, excluding VAT.  For bid documents http://www.romametropolitane.it/articolo.asp?CodMenu=430&CodArt=650.

Contact Roma Metropolitane Srl, attn Eng. Piero Lattanzi, tel +39 06454640100, email p.lattanzi@romametropolitane.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=100838-2019.

 10/19.



Permalink

ETS Srl from Rome secured the EUR315,246.46 contract, excluding VAT, for dynamic surveys with laser scanner technology and for thermographic surveys (of only the sections inside tunnels) of the A and B metro lines of Rome Metro, including the relative explanations and reports. Contact Roma Metropolitane Srl, attn Eng. Piero Lattanzi, Rome, tel +39 06454640100, email p.lattanzi@romametropolitane.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=303658-2019.

27/19.



Permalink


Salcef SpA (Roma)/IM.A.F. srl (Napoli) Joint Venture secured the contract for ordinary and extraordinary maintenance work on the metro lines B and B1 superstructures. Contact Atac SpA,  attn Sata Talone, Rome,  email protocollo@cert2.atac.roma.it. For further on the tender, please click here. Ref.n. 60/2020. 03/21.  

 




Permalink



Open invitation to tender, deadline 08/03/2021, for the emergency service for the suction of liquids due to flooding in stations, underpasses with tracks, railway tunnels, underground lines A, B, B1 and C, Rome Lido, Rome Viterbo and Rome Giardinetti regional railways.  The value of the contract is EUR491,839.30, excluding VAT. The duration of the contract is 36 months. Contact ATAC Spa, attn Ilaria Ranieri, Rome,  email protocollo@cert2.atac.roma.it. Click here for bid documents and here for further on TED Tender. Ref. n. 07/2021. 06/21. 

 




Permalink


ADC 76 srl from Rome secured the EUR 315,108.53 contract, excluding VAT, to provide emergency service for the suction of liquids due to flooding in stations, underpasses with tracks, railway tunnels, underground lines A, B, B1 and C, Rome Lido, Rome Viterbo and Rome Giardinetti regional railways.  Contact ATAC Spa, Rome,  email protocollo@cert2.atac.roma.it. Click here for further on TED Tender. Ref. n. 07/2021. 28/21.  

 




Permalink


Open invitation to tender, deadline 20/04/20221, for  the maintenance service of electrical distribution in tunnels, stations and depots.  The value of the contract is EUR3.51 million, excluding VAT. The duration of the contract is 36 months. Contact ATAC Spa, attn Serenella Anselmo, Rome,  , tel + 39064695, fax  +39064695, email serenella.anselmo@atac.roma.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=125648-2022. Ref.n. 24/2022. 11/22.

Italy-Rome: Repair and maintenance services of electrical distribution equipment

2022/S 048-125648

Contract notice – utilities

Services

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: ATAC S.P.A. AZIENDA PER LA MOBILITÀ
Postal address: VIA PRENESTINA, 45
Town: Roma
NUTS code: ITI43 Roma
Country: Italy
Contact person: Serenella anselmo
E-mail: serenella.anselmo@atac.roma.it
Internet address(es):
Main address: http://www.atac.roma.it/
I.6)Main activity
Urban railway, tramway, trolleybus or bus services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Servizio di manutenzione della Distribuzione Elettrica in galleria, nelle stazioni e nei depositi.

II.1.2)Main CPV code
50532400 Repair and maintenance services of electrical distribution equipment
II.1.3)Type of contract
Services
II.1.5)Estimated total value
Value excluding VAT: 3 506 270.61 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ITI43 Roma
II.2.6)Estimated value
Value excluding VAT: 3 506 270.61 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 36
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 20/04/2022
Local time: 12:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Italian

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
04/03/2022



Permalink


Danieletti Impianti Srl from Pavone del Mella (BS) secured the EUR2.28 million contract, excluding VAT, for the maintenance service of electrical distribution in tunnels, stations and depots. Contact ATAC Spa, attn Serenella Anselmo/Massimo Forgia, Roma, tel + +39 0646954132/4719, fax  +39 0646954553, email massimo.forgia@atac.roma.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=715289-2022. Ref.n. 24/2022. 52/22. 



Permalink

Prior information notice for the renewal of the completion of the track system on metro Line A in Rome.Estimated date of publication of contract notice 22/02/2023. Contact Giubileo 2025 Spa, attn Silvia Burani, Rome, email silvia.burani@societagiubileo2025.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=082545-2023. 06/23.



Permalink

Italy, Lyon-Turin - it/80

High Speed Railway

Restricted invitation to tender, deadline 14th February, 2003 for core drilling for the 12 km-long Bussoleno tunnel. Lot 1 is for eight vertical boreholes in alluvial ground spread out on a length of 580 m with a maximum depth of 150 m, or ten vertical boreholes on a length of 840 m, maximum depth 200 m. Lot 2 is for six vertical boreholes in rock, length of execution 2,140 m and maximum depth 540 m, or seven vertical boreholes, length 2,720 m and maximum depth 580 m. Lot 3 is for five vertical boreholes in rock on a length of 2,530 m at a maximum depth of 870 m, or four vertical boreholes, maximum depth 950 m, plus one 400 m horizontal borehole, to be executed on a length of 3,100 m. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=202642-2002, OJ S 252, or contact Lyon Turin Ferroviaire, Chambéry, tel. +33 479685666 or 67 and +39 0115579221. E-mail pierre.dhe@ltf-sas.com, franco.gallara@ltf-sas.com and xavier.dermendrail@ltf-sas.com 02/03.Restricted call for bids, deadline 4th July, 2003 for geophysical investigation for the 52 km base tunnel and the 12 km Bussoleno tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=099075-2003, OJ S 110, or contact Lyon Turin Ferroviaire, Chambéry, fax +33 479609704. E-mail pierre.dhe@ltf-sas.com and nathalie.monon@ltf-sas.com 25/03.Open call for bids, deadline 24th July, 2003 for aeraulics study as part of the draft design of the 12 km Bussoleno tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=099055-2003, OJ S 110, or contact Lyon Turin Ferroviaire, Chambéry, fax +33 479686097 or 5675. E-mail pierre.dhe@ltf-sas.com and eddy.verbesselt@ltf-sas.com 25/03.Restricted procedure, deadline 29th September, 2003 for construction of the 7 km-long 6 m-diameter Venaus exploratory tunnel, with option for three more kilometres. Overburden of 2 km and 2.5 km for the optional 3 km. To be driven mainly using a hard rock gripper TBM. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=150092-2003 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=150093-2003, OJ S 163, or contact Lyon Turin Ferroviaire, Chambéry, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com and lorenzo.brino@ltf-sas.com 37/03.Two contracts have been awarded for core drills for the 12 km-long Bussoleno tunnel in Italy. RCT won contract 1 for eight vertical boreholes in alluvial ground spread out on a length of 580 m with a maximum depth of 150 m, or ten vertical boreholes on a length of 840 m, maximum depth 200 m. Amount: €323,200. More from rct@mi.nettimo.it. Contract 2 is for six vertical boreholes in rock, length of execution 2,140 m and maximum depth 540 m, or seven vertical boreholes, length 2,720 m and maximum depth 580 m. It is won by Geotecno for €1.9 million. More from mfo@geotecnosrl.it. Contract 3 has been declared void for failing to attract bids within the client's budget. This contract is for five vertical boreholes in rock on a length of 2,530 m at a maximum depth of 870 m, or four vertical boreholes, maximum depth 950 m, plus one 400 m horizontal borehole, to be executed on a length of 3,100 m. Visit www.ltf-sas.com 42/03.Restricted call for bids, deadline 21st November, 2003 for core drilling and exploratory boring for the Bussoleno tunnel (12 km). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=180607-2003, OJ S 200, or contact Lyon Turin Ferroviaire, Chambéry, fax +33 479685683. E-mail pierre.dhe@ltf-sas.com or xavier.darmendrail@ltf-sas.com 44/03.A JV between Scetauroute and Metropolitana Milanese has secured a €108,700 contract to conduct an aeraulics study as part of the draft design of the 12 km Bussoleno tunnel. Visit www.scetauroute.fr and www.metropolitanamilanese.it 44/03.Restricted invitation to tender, deadline 8th December, 2003 for environmental measurements for the Venaus exploratory tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=185215-2003, OJ S 205, or contact Lyon Turin Ferroviaire, Chambéry, fax +33 479685683 and +39 0122641052. E-mail pierre.dhe@ltf-sas.com and piergiuseppe.gilli@ltf-sas.com 45/03.Open invitation to tender, deadline 5th January, 2004 for a 500 m vertical or inclined core drill. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=192010-2003, OJ S 213, or contact Lyon Turin Ferroviaire, Chambéry, fax +33 479685683. E-mail sgt.dde-isere@equipement.gouv.fr 46/03.Geophysik GGD won a €191,720 contract for preparing seismic profiles from core drills F65 and F75 for the base tunnel, a €184,460 contract for preparing seismic profiles from core drills S42, S49 and S8 for the Bussoleno tunnel, and a €55,260 contract for evaluation of the depth of the vertical faults for the base tunnel. Visit www.geophysik-ggd.com 51/03.Geoexpert won a €42,700 contract for two hybrid seismic profiles, 1 km and 600 m in length, for the base tunnel. Visit www.geoexpert.ch 51/03.Geoinvest won a €33,600 contract for electrical profiles for the Bussoleno tunnel. Visit www.geoinvest.it and www.ltf-sas.com 51/03.Open invitation to tender, deadline 14th April, 2004 for project construction management for the Venaus exploratory tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=026791-2004, OJ S 30, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com 10/04.Negotiated procedure, deadline 2nd July, 2004 for assistance to the client for the reference draft design, the detail design of the Italian part and the public inquiry in France and Italy. Contract 5 deals with tunnels. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=087067-2004, OJ S 106, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com or lorenzo.brino@ltf-sas.com 25/04.Negotiated procedure, deadline 19th July, 2004 for assistance to the client for the reference draft design for the international section of the base tunnel between Saint-Jean-de-Maurienne, France and Bruzolo, Italy. The reference draft design is an intermediate stage between the conceptual design and the detail design. There are seven contracts. Contract 0 is for general coordination. Contract A1 deals with operation and maintenance, contract A2 with safety, contract B1 with civil engineering, contract B2 with geology, contract B3 with railway and non-railway equipment and contract B4 with environment. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=094328-2004, OJ S 112, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com or geraldine.berthier@ltf-sas.com 25/04.Negotiated procedure, deadline 28th June, 2004 for making compatible urbanism documents (land use plan, development plan, maps, etc.) between Saint-Jean-de-Maurienne and the Italian border as part of the public inquiry. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=094345-2004, OJ S 112, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com, jacques-ricard@ltf-sas.com, geraldine.berthier@ltf-sas.com or nicole.delbe@ltf-sas.com 25/04.Information meetings will be held in Paris on 17th June and in Rome on 18th June. Visit www.ltf-sas.com/fr/couponreponseapr.pdf for registration to these meetings. 25/04.Qualification procedure for safety studies as part of the reference draft design for the international section of the base tunnel between Saint-Jean-de-Maurienne, France and Bruzolo, Italy. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=095916-2004, OJ S 114, or contact LTF, Chambery, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com, stephane.bouquier@ltf-sas.com, geraldine.berthier@ltf-sas.com or nicole.delbe@ltf-sas.com 26/04.Negotiated procedure, deadline 15th September, 2004 for compliance control of the reference draft design of the French-Italian section between Saint-Jean-de-Maurienne and Bruzolo. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107876-2004, OJ S 127, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com, lorenzo.brino@ltf-sas.com, geraldine.berthier@ltf-sas.com or nicole.delbe@ltf-sas.com 29/04.Negotiated procedure, deadline 1st September, 2004 for construction by means of a TBM of the 7 km Venaus exploratory tunnel with a cover of 2 km, with option for three more kilometres with a cover of 2.5 km. This is a re-tender as the previous tender process has been declared void. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=129218-2004, OJ S 149, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. 35/04.The construction of the 6 m-diameter Venaus investigatory tunnel under the Ambin massif near Susa has been commissioned to a JV headed by CMC and including Strabag, Bentini Costruzioni, Cogeis and Geotecna for EUR84.3 million. The contract awarded by Lyon Turin Ferroviaire (LTF) is for a 7 km tunnel, with option for a further 3 km. Cover above the tunnel of approximately 2,000 m (2,500 m for the optional three kilometres). A hard rock Gripper TBM will be used. Work to commence next spring to last three years. Visit www.ltf-sas.com, www.cmcra.it, www.strabag.at and www.cogeis.it 07/05.Geodata, SNCF Ingenierie and Systra secured a contract estimated at EUR2.9 million for project construction management for the Venaus exploratory tunnel and the follow-up of measurements and tests. This is a 7 km-long 6 m-diameter Venaus exploratory tunnel, with option for three more kilometres. Visit www.geodata.it and www.systra.com 21/05.Socotec secured a EUR1.4 million contract for the compliance control of the reference draft design of the French-Italian section between Saint-Jean-de-Maurienne and Bruzolo. Visit www.socotec.fr 42/05.Geos and D'Appolonia secured a EUR509,000 contract for safety studies as part of the reference draft design for the international section of the base tunnel between Saint-Jean-de-Maurienne, France and Bruzolo, Italy. Visit www.geos.tm.fr and www.dappolonia.it 43/05.Negotiated procedure, deadline 14th June, 2006 for geological surveying, measurements and mapping in several areas of the international section of the Lyon-Turin base tunnel. Read E-News Weekly 2/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=110595-2006, OJ S 103, or contact LTF, Chambery, fax +33 479685683. E-mail geraldine.decarre@ltf-sas.com 24/06.Negotiated procedure, deadline 22nd September, 2006 for environmental impact study on the Italian part of the Lyon-Turin base tunnel from the border to the portal of the Gravio tunnel in Borgone. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=162449-2006, OJ S 150, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. E-mail delphine.croizer@ltf-sas.com 33-34/06.A consortium of Golder EEIG, AI Engineering, TEMI, and TEI has been contracted to undertake the environmental impact study on the Italian part of the Lyon-Turin base tunnel from the border to the portal of the Gravio tunnel in Borgone. The contract is estimated at EUR950,000. Visit www.golder.it, www.temiambiente.it and www.tei.it 11/07.Negotiated call for tenders, deadline 10th September, 2007 for engineering services for the approx. 80 km international cross-border section between Saint-Jean-de-Maurienne in France and Susa valley in Italy. The 53 km base tunnel is the major challenge on that section. The studies deal with operation and maintenance (lot 1), safety (lot 2), civil engineering, geology and environment (lot 3), railway technology and other equipment (lot 4), construction follow-up (lot 5), specialised consultancy (lot 6), economic and socio-economic studies (lot 7), geodesy and topography (lot 8), soil and rock exploration and surface exploration (lot 10). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=194966-2007, OJ S 156, or contact LTF, Chambery, fax +33 479685683. E-mail michel.bogacz@ltf-sas.com 34/07.Negotiated procedure, deadline 01.12.2008, for contract to review project studies for the joint working party of the Lyon-Turin railway. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=285629-2008, OJ S 214, or contact Stéphanie Nicoud at Lyon Turin Ferroviaire, Chambery, fax +33 4 79 68 56 83, e-mail stephanie.nicoud@ltf-sas.com 45/08.



Permalink

France- Rhone-Alps - fr/11 & Italy Lyon-Turin - it/80

The awarding procedure for the invitation to tender by negotiated procedure for two lots of exploration work involving underground test drilling and tunnelling for Saint-Martin la Porte in Val de Maurienne has been discontinued. Contact Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax -83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=367332-2011. 48/11.



Permalink

Invitation to tender by negotiated procedure, deadline 16.09.2013, for framework agreement for site preparation work at Bussoleno-Susa site (phase 1) for the new rail link Lyon-Turin. The framework agreement, with 25 maximum participants, will run for 48 months after award, value EUR24-85 million. The contract comprises four lots. Further information, specs and docs from Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Time limit for accessing documents 09.09.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=242506-2013. Framework agreement n.14. 30/13.



Permalink

Invitation to tender by restricted procedure, deadline 16.09.2013, for framework agreement covering procedures, studies, construction management, control compliance/validation studies, coordination of safety and health protection, technical-administrative, static and functional control during construction, environmental supervision for site preparation work at Bussoleno-Susa site (phase 1) for the new rail link Lyon-Turin. The framework agreement, with 25 maximum participants, will run for 48 months after award, value EUR13-47 million. The contract comprises seven lots. Further information, specs and docs from Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Time limit for accessing documents 09.09.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=242641-2013. Framework agreement n.13. 30/13.



Permalink

Invitation to tender by restricted procedure, deadline 14.02.2014, for framework agreement covering financial studies for the cross border section for the new rail link Lyon-Turin and for the associates assistance to LTF and Commission Intergouvernementale (CIG). The framework agreement will run for 45 months, value EUR200-600,000, excluding VAT. Further information, specs and docs from Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Time limit for accessing documents 07.02.2014. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 437907-2013. 52/13.



Permalink

Invitation to tender by restricted procedure, deadline 16.04.2014, for framework agreement covering assistance to the project management for traffic, economic and socio-economic studies for the new Lyon-Turin rail link. The framework agreement will run for 42 months, value EUR150,000, excluding VAT. Further information, specs and docs from Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Time limit for accessing documents 09.04.2014. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=100073-2014. 14/14.



Permalink

Negotiated procedure, deadline 29.08.2014, for the certification of the project costs for the cross border section for the new rail link Lyon-Turin. Duration of contract 24  months, value EUR150,000-350,000, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 22.08.2014. Contact Stephanie Nicoud at Lyon Turin Ferroviaire, Chambery, tel +33 479685669, fax +33 479685683, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=250362-2014. 30/14.



Permalink

Invitation to tender using negotiated procedure, deadline 15.09.2014, for framework agreement covering construction-site supervision services for the new Lyon-Turin rail link. Contract duration 48 months from award, value EUR1,310,000-6,450,000, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 08.09.2014.Contact Stephanie Nicoud at LTF Sas in Chambery, tel +33 479685669, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 255999-2014. 31/14.



Permalink

Invitation to tender by restricted procedure, deadline 01.09.2014, for environmental coordination of geological works from Saint-Martin-la-Porte, during the construction period of the new Lyon-Turin rail link. Value of contract EUR160-750,000, excluding VAT, duration 120 days from award. Time limit for accessing documents 25.08.2014. Contact Stephanie Nicoud at LTF Sas in Chambery, tel +33 479685669, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=255994-2014. 32/14.



Permalink

SEA Coop/EG Team (Turin) secured the EUR187,111.50 contract, excluding VAT, for auscultation of water resources on the Italian side of the new Lyon-Turin rail link. Contact Stephanie Nicoud at LTF Sas in Chambery, tel +33 479685669, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=256018-2014. Ref. n. C14098. 32/14



Permalink

Finance Consult of Paris secured the EUR350,000 contract, excluding VAT, for framework agreement covering financial studies for the cross border section for the new rail link Lyon-Turin and for the associates assistance to LTF and Commission Intergouvernementale (CIG). Contact Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 313671-2014. Ref. n.C14122. 38/14.



Permalink

Awarded the contract for framework agreement covering procedures, studies, construction management, control compliance/validation studies, coordination of safety and health protection, technical-administrative, static and functional control during construction, environmental supervision for site preparation work at Bussoleno-Susa site (phase 1) for the new rail link Lyon-Turin. Contact Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=318296-2014. Framework agreement n.13. 39/14.



Permalink


Fenice Spa of Cascine Vica (Rivoli, TO) secured the contract for environmental controls for Maddalena survey tunnel and its storage site. Contact Lyon Turin Ferroviaire SAS, att.n Stephanie Nicoud, Chambery, tel +33 479685669, fax +33 479685683, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=348846-2014




Permalink

Awarded the AC19 framework agreement covering test drilling, engineering, environmental, geological and geophysical consultancy services to complete dossier for the new Lyon-Turin rail link between Saint-Jean-de-Maurienne and Bussoleno. Contact Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=418039-2014. 52/14.



Permalink

The Group Tractebel Engineering SA/TUC Rail of Bruxelles secured the EUR350,000 contract, excluding VAT, for the certification of the project costs for the cross border section for the new rail link Lyon-Turin. Contact Stephanie Nicoud at Lyon Turin Ferroviaire, Chambery, tel +33 479685669, fax +33 479685683, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=64122-2015. 09/15.



Permalink

Artelia Ville & Transport of Lentilly secured the EUR750,000 contract, excluding VAT, for environmental coordination of geological works from Saint-Martin-la-Porte during construction of the new Lyon-Turin rail link. Contact Stephanie Nicoud at LTF Sas in Chambery, tel +33 479685669, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=34665-2015. 09/15.



Permalink

Fama has signed with the JV Spie Batignolles, Ghella, Cogeis, CMC Ravenna, Eiffage TP, which has as project director Florent Martin, the contract for the supply of the production segments and their accessories for the construction of the New Transalpine Railway Turin-Lyon as far as Saint Martin La Porte. Visit http://www.famaspa.it/en/News/44/Firma-del-contratto-per-la-realizzazione-della-Nuova-Linea-Ferroviaria-Transalpina-Torino---Lione/ and http://tunnelbuilder.com/suppliers/FAMA/. 21/15.



Permalink


The awarding procedure for framework agreement covering construction-site supervision services for the new Lyon-Turin rail link has been discontinued. Contact Stephanie Nicoud at LTF Sas in Chambery, tel +33 479685669, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=224170-2015. 27/15.




Permalink

Negotiated invitation to tender, deadline 03.07.2017, for general management during the construction of the tunnel, Italian side, for the new Lyon-Turin rail link. Value of the contract is EUR19.5 million, excuding VAT, for a 129 months duration. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479684240, fax

+33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215900-2017 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215897-2017. Ref. n. S29 . 24/17.



Permalink

Open invitation to tender, deadline 04.09.2017, for providing safety coordination (CSE) during  the preparation for the construction of railway trusses and maintenance of the Maddalena exploratory tunnel in Chiomonte (To). The duration of the contract is  12 months.  Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=297866-2017. Ref. n. TEN-T-2014-EU-TM.0401.M. 31/17.



Permalink


Open invitation to tender, deadline 06.10.2017, for the monitoring of water resources 2018-2020, on the Italian side, before the main works of the cross-border section for the new Lyon-Turin rail link. Value of the contract is EUR400,000, excluding VAT, duration of the contract is for 36 months. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479684240, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=361081-2017. Ref. n. S29 . Ref.n. TENT-T-2014-EU-TM.0401.M. 37/17.




Permalink

The contract for safety coordination (CSE) during  the preparation, construction of railway trusses and maintenance of Maddalena exploratory tunnel in Chiomonte (To) has not been awarded.  Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=443364-2017.



Permalink

Open invitation to tender, deadline 26.02.2018, for works of protection and maintenance of the TELT worksites for the Logistic support to the Forces of the Order (FF.O) in Italy. The contract is composed of 3 parts. Duration of the contract is for 24 months. Contact Tunnel Euralpin Lyon Turin SAS, attn Marjorie Chevelard, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=019184-2018

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=019177-2018.

Ref.n. TEN-T 2014-EU-TM.0401.M. 03/18.



Permalink

Negotiated invitation to tender, deadline 23.03.2018, for the assistance to the contracting authority and for studies during the construction of the transborder section for the new Lyon-Turin rail link. Value of the contract is EUR25 million, excuding VAT, for 168 months duration.  Contact TELT sas, Le Bourget du Lac, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=038092-2018 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=038078-2018. 05/18.



Permalink

The Group Pini Swiss Engineers SA/Pini Swiss Engineers SARL from Lugano secured the EUR580,294 contract, excluding VAT, for the preparation of the project. The project management of the works for the digging out of the places to pass and the inner layout of the Maddalena tunnel, for the transport and the depositing of the excavated materials as well as for support to the police. Contact TELT SAS, Le Bourget du Lac, , tel +33 479444240, fax +33 479685683, email fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=024386-2018.06/18.



Permalink

Negotiated invitation to tender, deadline 19.03.2018, for the construction of intersections and reversal of trains. Also for the equipment inside the Maddalena tunnel, the transport and the depositing of the excavated materials at Chiomonte (Italy) for the new Lyon-Turin rail link. Value of the contract is EUR52million, excuding VAT, the  contracts duration will be for 24 months.  Contact TELT sas, Le Bourget du Lac, fax +33 479685683, email fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=061721-2018 and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=061730-2018.

07/18.



Permalink

Additional information for the negotiated invitation to tender, deadline 19.03.2018, for the construction of intersections and reversal of trains.

Also for the equipment inside the Maddalena tunnel, the transport and the depositing of the excavated materials at Chiomonte (Italy) for the new Lyon-Turin rail link. Value of the contract is EUR52million, excluding VAT, the  contracts duration will be for 24 months.  Contact TELT sas, Le Bourget du Lac, fax +33 479685683, email fonction.marches@ltf-sas.com.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=081453-2018. 08/18.



Permalink

Negotiated invitation to tender, deadline 26.03.2018, for works management, for the management and development of the excavation materials on the Italian side of the cross-border section of the Turin-Lyon railway project (operational site n. 10). The value of the contract is EUR8.84 million, excluding VAT, duration for 112 months from this  autumn.  Contact TELT sas, Le Bourget du Lac, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=079321-2018.

Ref.n. 2014-EU-TM-0401-M. 08/18.



Permalink

Open invitation to tender, deadline 04.04.2018, for  the ante-operam environmental monitoring (duration 12 months before the construction site beginning as defined by Italian legislation) concerning the construction of the railway junction and the Torrazza Piemonte storage site, for the new Lyon-Turin rail link. Duration of the contract is 16 months.  Contact TELT sas, Le Bourget du Lac, fax +33 479685683, email fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104181-2018 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104177-2018. 10/18.



Permalink

Postponed from 04.04.2018 to 09.04.2018 the deadline of the open invitation to tender(before the start of the construction work)  for  the environmental monitoring (duration 12 months before the construction site beginning as defined by Italian legislation). With regards to the construction of the railway junction and the Torrazza Piemonte storage site, for the new Lyon-Turin rail link.

Duration of the contract is 16 months.  Contact TELT sas, Le Bourget du Lac, fax +33 479685683, email fonction.marches@ltf-sas.com. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=138415-2018

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=138421-2018.

13/18.



Permalink

Postponed from 11.06.2018 to 21.06.2018 the deadline of the open invitation to tender for the design and management of the environmental monitoring plan (PMA) for the construction of the works of the future Turin-Lyon rail link, Italian side. The value of the contract is EUR920.000, excluding VAT, duration for 156 months. Contact TELT sas, Le Bourget du Lac, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=229676-2018.

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=238355-2018Ref.n. S34. 22/18.



Permalink

The joint venture between Effedue Srl,  BBE Srl from Susa, Piemonte Disgaggi Opere Speciali Srl from Avigliana, Ghiggia Ingegneria d’Impianti Srl from Scarmagno (Turin), EMMEVI SRL from Ravenna and Geotecna Srl from Milan have been awarded the EUR3 million contract for the maintenance works at Chiomonte site by TELT, the duration will be 24 months. Visit http://www.telt-sas.com/it/affidato-appalto-mantenimento-chiomonte/.23/18.



Permalink

Postponed from 21.06.2018 to 03.07.2018 the deadline of the open invitation to tender for the design and management of the environmental monitoring plan (PMA) for the construction of the works of the future Turin-Lyon rail link, Italian side. The value of the contract is EUR920.000, excluding VAT, duration of the contract is for 156 months. Contact TELT sas, Le Bourget du Lac, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=262724-2018. Ref.n. S34. 22/18.



Permalink

Open invitation to tender, deadline 05.11.2018, for environmental monitoring (EMA) on the Italian sites of the new Lyon-Turin rail link.

Value contract EUR 37 million, excluding VAT. Duration of the contract is from 01/07/2019 to 30/06/2031.  Further information from http://telt.achatpublic.com/accueil/. Contact TELT sas, Le Bourget du Lac, email fonction.marches@ltf-sas.com. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=393394-2018

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=393395-2018.

Ref. n. S35. 37/18.



Permalink

Negotiated invitation to tender, deadline 07.03.2019, for environmental coordination on the Italian side site for the new Turin-Lyon high-speed railway. Value of the contract is EUR3 million, excluding VAT.

Duration of the contract is 144 months. For further information please visit https://telt.achatpublic.com/accueil/. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget-du-Lac, email fonction.contrats@telt-sas.com. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=574773-2018

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=574819-2018.

01/19.



Permalink

HPC Italia Srl (Milan) and Pro iter Srl (Milan) secured the contract for the design and management of the environmental monitoring plan (PMA) for the construction works for the future Turin-Lyon rail link, Italian side. Contact TELT sas, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Click here for more .

Ref.n. S34. 11/19.



Permalink

Negotiated invitation to tender, deadline 24.05.2019, for general management and high surveillance for the operational construction sites CO1 - interconnection tunnel (Bussoleno) and CO2 - outdoor works (Susa plain) for the new Turin-Lyon high-speed railway. Value of the contract is EUR18.7 million, excluding VAT. The contract is composed by 2 lots. For further information please visit https://telt.achatpublic.com/accueil/ where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget-du-Lac, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=168989-2019

(French) and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=169023-2019

(Italian). Ref. S42.16/19.



Permalink

The open invitation to tender for the ante-operam environmental monitoring concerning the construction of the railway junction and the Torrazza Piemonte storage site, for the new Lyon-Turin rail link has not been awarded. Contact TELT sas, Le Bourget du Lac, fax +33 479685683, email fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188586-2019

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188570-2019.

17/19.




Permalink

Open invitation to tender, deadline 19.07.2019, for environmental investigations and assessments for the construction of the new Turin-Lyon line, on the Italian side. Value of the contract is  EUR442,999, excluding VAT.

Duration of the contract is 12 months  Further information from http://telt.achatpublic.com/accueil/. Contact TELT sas, Le Bourget du Lac, email fonction.contrats@telt-sas.com. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=288386-2019

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=292604-2019.

26/19.



Permalink

Negotiated invitation to tender, deadline 16.09.2019, for construction works on operational worksites n.3 (boring by TBM of the base tunnel from the Chiomonte site, direction Susa), n. 4 (boring by NATM of the base tunnel from the Chiomonte site, direction France) and n. 10 (reclamation of the earth and rocks excavated from all sites on Italian territory) under the new Lyon-Turin railway link project. The contract is composed by 2 lots: Lot 1: composed by CO3 and CO4, value EUR 802,025,000 excluding VAT; Lot 2: composed by CO10, value EUR 216,440,000, excluding VAT. Duration contract 108 months. For further information please visit  https://telt.achatpublic.com/accueil/ where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget-du-Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=303963-2019. Ref. T13. 27/19. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=314636-2019)   



Permalink

Open invitation to tender, deadline 14.10.2019, for safety coordination during the Design and Construction for all sites on Italian territory under the new Lyon-Turin railway link project. Duration of the contract is 108 months. For further information please visit https://telt.achatpublic.com/accueil/ where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget-du-Lac, email contrats.csps@telt-sas.com. Click here for more information.

Ref. S36. 30/19.



Permalink

The Consortium Artelia Ville & Transport (Choisy-le-Roi, F), Tuc Rail (Bruxelles, B), Aecom (Madrid, E) and Geodes (Torino) secured the contract for the assistance to the contracting authority and for studies during the construction of the transborder section for the new Lyon-Turin rail link. Contact TELT sas, Le Bourget du Lac, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=341192-2019 and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=343446-2019.

Ref.n. C17306.  30/19.



Permalink

Postponed from 16/09/2019 to 25/09/2019 the deadline of the negotiated invitation to tender for construction works on operational worksites n.3 (boring by TBM of the base tunnel from the Chiomonte site, direction Susa), n. 4 (boring by NATM of the base tunnel from the Chiomonte site, direction France) and n. 10 (reclamation of the earth and rocks excavated from all sites on Italian territory) under the new Lyon-Turin railway link project. The contract is composed of 2 lots: Lot 1: composed of CO3 and CO4, value EUR 802,025,000 excluding VAT; Lot 2: composed of CO10, value EUR 216,440,000 excluding VAT. Duration of the  contract is 108 months. For further information please visit  https://telt.achatpublic.com/accueil/ where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget-du-Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Click here for more information.

Ref. T13. 34/19.



Permalink

Negotiated invitation to tender, deadline 16.09.2019, for construction works on operational worksites n.3 (boring by TBM of the base tunnel from the Chiomonte site, direction Susa), n. 4 (boring by NATM of the base tunnel from the Chiomonte site, direction France) and n. 10 (reclamation of the earth and rocks excavated from all sites on Italian territory) under the new Lyon-Turin railway link project.

The contract is composed of 2 lots: Lot 1: composed by CO3 and CO4, value EUR 802,025,000 excluding VAT; Lot 2: composed by  CO10, value EUR 216,440,000, excluding VAT. Duration of the contract is 108 months. For further information please visit https://telt.achatpublic.com/accueil/ where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget-du-Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Click here for more information. Ref. T13. 27/19.



Permalink

Postponed from 16/09/2019 to 25/09/2019 the deadline of the negotiated invitation to tender for construction works on operational worksites n.3 (boring by TBM of the base tunnel from the Chiomonte site, direction Susa), n. 4 (boring by NATM of the base tunnel from the Chiomonte site, direction France) and n. 10 (reclamation of the earth and rocks excavated from all sites on Italian territory) under the new Lyon-Turin railway link project.

The contract is composed of 2 lots: Lot 1: composed by CO3 and CO4, value EUR802,025,000, excluding VAT; Lot 2: composed by  CO10, value EUR216,440,000, excluding VAT. Duration of the contract is 108 months. For further information please visit https://telt.achatpublic.com/accueil/ where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget-du-Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Click here for more information.

Ref. T13. 35/19.



Permalink

Open invitation to tender, deadline 08/10/2019, for maintenance of TELT’s telepresence system for the new Lyon-Turin railway link project. Duration of the contract is 36 months. For bid documents
https://telt.achatpublic.com/accueil/ where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax  +33 479685683, email Fonction.contrats@telt-sas.com. Click here and here for more information. Ref. Maint_TP. 39/19.



Permalink

Open invitation to tender, deadline 28/10/2019, for works management during the construction of interchange niches, the inner arrangement of the Maddalena tunnel, the transport and storage of excavation material for the new Lyon-Turin railway link project. Value of the contract is EUR438,000  excluding VAT. Duration of the contract is 60 months. For bid documents click here  where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax  +33 479685683, email Fonction.contrats@telt-sas.com. For bid documents click here  40/19.



Permalink

Open invitation to tender, deadline 11/12/2019, for the audit of the information systems of TELT. Value contract EUR 50,000, excluding VAT.

Duration of the contract is 6 months. For bid documents https://telt.achatpublic.com/accueil/ where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, email fonction.contrats@telt-sas.com. For further tender information please click here .47/19.



Permalink


Open invitation to tender, deadline 08/01/2020, for works to protect and maintain the TELT worksites for the Logistic support to the Forces of the Order (FF.O) in Italy. The contract is composed of 4 parts.

The value of the contract is EUR 5.5 million, excluding VAT. The duration of the contract is for 40 months. For bid documents https://telt.achatpublic.com/accueil/ where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax

+33 479685683, email fonction.contrats@telt-sas.com. For further tender documents please click here

Ref.n. TEN-T 2014-EU-TM.0401.M. 47/19.



Permalink


The JV RTI Italferr SPA (Rome)/Systra SA (Paris)/ SETEC TPI (Paris)/ Pini Swiss Engineers SA (Lugano) secured the EUR20.64 million contract, excluding VAT, for general management during the construction of a tunnel, (Italian side) for the new Lyon-Turin rail link. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, email fonction.contrats@telt-sas.com. For tender documents please click here

Ref.n. S29. 47/19.



Permalink


Negotiated invitation to tender, deadline 03/12/2019, for TELT functional, organizational and technical audit services. The contract is composed of 2 lots. The value of the contract is EUR1million, excluding VAT. Duration of the contract is 48 months. For tender documents https://telt.achatpublic.com/accueil/ where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, email fonction.contrats@telt-sas.com. For further tender documents please click here and here.

 Ref. S47 47/19.



Permalink

Connect SpA  from  Pianezza (TO)  secured the EUR82,266 contract, excluding VAT, for maintenance of TELT’s telepresence system for the new Lyon-Turin railway link project. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax  +33 479685683, email Fonction.contrats@telt-sas.com. For tender documents please click here .

Ref. Maint_TP. 04/20.



Permalink

TELT awarded to the Joint Venture Salini Impregilo, Vinci Constructions France TP, CSC Entreprise de Constructions and  Dodin Campenon Bernard the EUR40 million contract, excluding VAT,  for the construction of  23 interchange niches ,  30 to 40-m-long and 3-m-deep areas, at Chiomonte for the new Lyon-Turin rail link.  The niches will be excavated using the traditional method over a period of 19 months. Today, the construction site variant foresees that the excavation of the base tunnel will start from Chiomonte instead of Susa and therefore it is necessary to adapt the tunnel in order to allow construction vehicles to pass through.  Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax  +33 479685683, email Fonction.contrats@telt-sas.com. For tender information please click here.  04/20.



Permalink

Open invitation to tender, deadline 24/02/2020, for the technical-administrative testing for the La Maddalena site.  Value of the contract is EUR400,000, excluding VAT. Duration of the contract is 60 months. For bid documents https://telt.achatpublic.com/accueil/ where tenders have to be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax  +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=038027-2020.   04/20.



Permalink

The JV Salini Impregilo SPA (Milan)/CSC Entreprise de constructions SA (Lugano)/VINCI Constructions France TP Lyon (Villeurbanne)/Dodin Campenon Bernard (Toulouse) secured the EUR40.09 million contract, excluding VAT, for the construction of intersections and reversal of trains. Also to provide  the equipment inside the Maddalena tunnel, the transport and the depositing of the excavated materials at Chiomonte (Italy) for the new Lyon-Turin rail link. Contact TELT sas, Le Bourget du Lac, fax +33 479685683, email fonction.marches@ltf-sas.com. For tender information please click here. 16/20.



Permalink

Open invitation to tender, deadline 09/07/2020, for assistance to the General Management for economic and socio-economic studies of the cross-border section of the Lyon-Turin railway line. Value of the contract is EUR412,000, excluding VAT. Duration of the contract is 12 months. For bid documents https://telt.achatpublic.com/accueil/  where tenders have to be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel+33 479685650, fax  +33 479685683, email fonction.contrats@telt-sas.com. For tender information please click here.22/20.



Permalink

Open invitation to tender, deadline 06/07/2020, for land drilling surveys on the Italian side for the new Lyon-Turin railway link project. Value of the contract is EUR5,193,000  excluding VAT. Duration of the contract is 60 months. For tender documents click here  where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, email fonction.contrats@telt-sas.com . For further TED documents click here.  24/20.



Permalink

The  EUR10.23 million contract, excluding VAT for Project management services for the management and use of excavated materials on the Italian side of the cross-border section of the Lyon-Turin rail project (operational site No 10) has been awarded. Contact TELT sas, Le Bourget du Lac, email fonction.contrats@telt-sas.com. For tender information please click here. Ref.n. FM5003. 24/20.



Permalink

Lombardi Ingénieurs conseils, Arcadis ESG, Amberg Engineering, BG Ingénieurs conseils and Neosia secured the EUR8.5 million contract, excluding VAT for works management, for the management and development of the excavation materials on the Italian side of the cross-border section of the Turin-Lyon railway project (operational site n. 10). Contact TELT sas, Le Bourget du Lac, email fonction.contrats@telt-sas.com. For tender information please click here and here

Ref.n. FM5003. 24/20.



Permalink

The JV Labanalysis Srl, Laser Lab Srl and S.I.N.A. Spa secured the EUR16.3 million contract for environmental monitoring (EMA) on the Italian sites of the new Lyon-Turin rail link. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit https://www.telt-sas.com/. 25/20.

 




Permalink

The JV Borio Giacomo Srl, Ecoval Srl and IG ingegneria Geotecnica Srl secured the EUR5.4 million contract for the construction of barriers and assistance to any needs indicated by the police (FF.O) in Italy.  Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax

+33 479685683, email fonction.contrats@telt-sas.com. Visit

https://www.telt-sas.com/. 25/20.






Permalink


The JV IEC Srl, GAE Engineering Srl, SI.ME.TE Srl, Gestione Progetti Srl, Socotec, Eng. Fausto Cioci and Eng. M. Vania Abbinante secured the EUR7.8 million contract for coordination of the safety and health protection of workers on construction sites in Italy during the planning and execution of works. The contract includes risk analysis and prevention, assistance to the safety function through the preparation of specific documents and monitoring on safety during the work phase. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit https://www.telt-sas.com/. 25/20.



Permalink

The JV SI.ME.TE Srl, Ingantonio Turco and Geo Engineering Srl secured the EUR260,000 contract for the test of interchange niches in the Maddalena tunnel at Chiomonte. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit https://www.telt-sas.com/. 25/20.



Permalink

The JV Labanalysis Srl, Laser Lab Srl and S.I.N.A. Spa secured the EUR16.3 million contract for environmental monitoring (EMA) on the Italian sites of the new Lyon-Turin rail link. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. For further information click here and visit https://www.telt-sas.com/. 25/20.

 

https://www.telt-sas.com/fr/attribution-de-marches-pour-plus-de-250-millions-deuros/



Permalink


The JV AI Engineering Srl/AI Studio from Turin secured the EUR 3.46 million contract, excluding VAT,  for environmental coordination on the Italian side site for the new Turin-Lyon high-speed railway. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget-du-Lac, email fonction.contrats@telt-sas.com. For further information please click here and here. 51/20. 

 




Permalink


The contract for TELT functional, organizational and technical audit services was not awarded Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, email fonction.contrats@telt-sas.com. For further tender documents please click here.  Ref. S47. 02/21. 

 




Permalink


Open invitation to tender, deadline 26/03/2021, for works to protect and maintain the TELT worksites for the Logistic support to the Forces of the Order (FF.O) in Italy. The contract is composed of 3 parts. The value of the contract is EUR4.96 million, excluding VAT. The duration of the contract is for 24 months. For tender documents click here, where  offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax+33 479685683, email fonction.contrats@telt-sas.com. For further on the TED tender, please click here. Ref.n. MT18. 08/21. 

 




Permalink


Open invitation to tender, deadline 26/03/2021, for works to protect and maintain the TELT worksites for the Logistic support to the Forces of the Order (FF.O) in Italy. The contract is composed of 3 parts. The value of the contract is EUR4.96 million, excluding VAT. The duration of the contract is for 24 months. For tender documents click here, where  offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax+33 479685683, email fonction.contrats@telt-sas.com. For further on the  tender, please click here. Ref.n. MT18. 08/21. 

 




Permalink


Open invitation to tender, deadline 23/02/2022, for the completion of the technological and mechanical systems of the Visitors' Center built at the TELT La Maddalena site in the municipality of Chiomonte (To). For tender documents https://telt.achatpublic.com/accueil/, where tenders must be sent.  Duration of the contract will be 18 months. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=021976-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=664571-2021. Ref. n. MT20. 04/22. 

France-Le Bourget-du-Lac: Building installation work

2022/S 010-021976

Corrigendum

Notice for changes or additional information

Works

(Supplement to the Official Journal of the European Union, 2021/S 250-664571)

Legal Basis:
Directive 2014/25/EU

Section I: Contracting authority/entity

I.1)Name and addresses
Official name: Tunnel Euralpin Lyon Turin SAS
Postal address: Savoie Technolac - Bâtiment Homère - 13 allée du Lac de Constance - BP 281
Town: Le Bourget du Lac
NUTS code: FRK27 Savoie
Postal code: 73375
Country: France
Contact person: Fonction Contrats
E-mail: fonction.contrats@telt-sas.com
Telephone: +33 479685650
Fax: +33 479685683
Internet address(es):
Main address: www.telt-sas.com
Address of the buyer profile: https://telt.achatpublic.com/accueil/

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Travaux de réalisation des équipements technologiques et mécaniques de l'espace visiteurs sur le chantier TELT La Maddalena

Reference number: MT20
II.1.2)Main CPV code
45300000 Building installation work
II.1.3)Type of contract
Works
II.1.4)Short description:

Le présent marché public a pour objet la réalisation des travaux relatifs à la finalisation des équipements technologiques et mécaniques de l’espace visiteurs construit sur le chantier TELT « La Maddalena » sur la commune de Chiomonte (Turin).


Le présent marché public est un accord-cadre mono-attributaire qui donne lieu à l’émission de bons de commande en application des articles R.2162-1 à R.2162-6 et R.2162-13 à R.2162-14 du Code de la Commande Publique.


Le présent accord-cadre est conclu sans minimum mais avec un montant maximal de 5 349 000 € sur la durée totale du marché.

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
11/01/2022
VI.6)Original notice reference
Notice number in the OJ S: 2021/S 250-664571

Section VII: Changes

VII.1)Information to be changed or added
VII.1.2)Text to be corrected in the original notice
Section number: IV.2.2
Instead of:
Date: 04/02/2022
Local time: 14:00
Read:
Date: 23/02/2022
Local time: 14:00
Section number: IV.2.7
Instead of:
Date: 07/02/2022
Local time: 14:00
Read:
Date: 24/02/2022
Local time: 11:00
VII.2)Other additional information:



Permalink


The Joint Venture Italferr (Gruppo FS Italiane) with SYSTRA France and Pini Group SA secured the EUR18 million contract for general management and surveillance for the operational construction sites CO1 - interconnection tunnel (Bussoleno) and CO2 - outdoor works (Susa plain) for the new Turin-Lyon high-speed railway. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget-du-Lac, email fonction.contrats@telt-sas.com. Visit https://www.telt-sas.com and  https://www.italferr.it/. Ref. S42. 15/22. 

 




Permalink


Open invitation to tender, deadline 20/06/2022, for updating of the LTF2004 geodesic system and the reference points’ coordinates of the operational sites on the new Turin-Lyon railway line. For tender documents please click here, where tenders must be sent. Value of the contract is EUR 430,500 excluding VAT. Duration of the contract will be 12 months. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=245745-2022. Ref. n. MS70 - C210348. 20/22.

 

France-Le Bourget-du-Lac: Topographical services

2022/S 089-245745

Contract notice – utilities

Services

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: Tunnel Euralpin Lyon Turin SAS
Postal address: Savoie Technolac - Bâtiment Homère - 13 allée du Lac de Constance - BP 281
Town: Le Bourget du Lac
NUTS code: FRK27 Savoie
Postal code: 73375
Country: France
Contact person: Direction Achats
E-mail: fonction.contrats@telt-sas.com
Telephone: +33 479685650
Fax: +33 479685683
Internet address(es):
Main address: www.telt-sas.com
Address of the buyer profile: https://telt.achatpublic.com/accueil/
I.6)Main activity
Railway services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

ACTUALISATION DU SYSTEME GEODESIQUE LTF2004 ET MISE A JOUR DES COORDONNEES DES POINTS DE REFERENCE DES CHANTIERS OPERATIONNELS

Reference number: MS70 - C210348
II.1.2)Main CPV code
71351810 Topographical services
II.1.3)Type of contract
Services
II.1.5)Estimated total value
Value excluding VAT: 430 500.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.2)Additional CPV code(s)
71356300 Technical support services
II.2.3)Place of performance
NUTS code: FRK27 Savoie
NUTS code: ITC1 Piemonte
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 12
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 20/06/2022
Local time: 13:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
French, Italian

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
03/05/2022



Permalink


Negotiated procedure with prior call for competition, deadline 02/09/2022, for external topographic control services of the new Lyon-Turin base tunnel. For tender documents please click here, where tenders must be sent. Value of the contract is EUR 6 million, excluding VAT. Duration of the contract will be 96 months. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=348328-2022. Ref. n. S57. 26/22.  

  

France-Le Bourget-du-Lac: Topographical services

2022/S 122-348328

Contract notice – utilities

Services

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: tunnel Euralpin Lyon Turin SAS
National registration number: 43955695200026
Postal address: savoie Technolac - bâtiment Homère - 13 allée du Lac de Constance - bP 281
Town: Le Bourget-du-Lac
NUTS code: FRK27 Savoie
Postal code: 73375
Country: France
E-mail: fonction.contrats@telt-sas.com
Telephone: +33 479685650
Fax: +33 479685683
Internet address(es):
Main address: http://www.telt-sas.com
Address of the buyer profile: https://telt.achatpublic.com
I.6)Main activity
Railway services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

contrôle extérieur topographique du tunnel de base

Reference number: s57
II.1.2)Main CPV code
71351810 Topographical services
II.1.3)Type of contract
Services
II.1.5)Estimated total value
Value excluding VAT: 6 000 000.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.2)Additional CPV code(s)
71351810 Topographical services
II.2.3)Place of performance
NUTS code: FRK27 Savoie
NUTS code: ITC1 Piemonte
II.2.6)Estimated value
Value excluding VAT: 6 000 000.00 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 96
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 02/09/2022
Local time: 12:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Italian, French

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
23/06/2022



Permalink


Open invitation to tender, deadline 08/07/2022, for the assistance to Commitment for the consultation documents (CD) for the Virtual infrastructure manager’s contract for TELT. For tender documents please click here, where tenders must be sent. Value of the contract is EUR 200,000 excluding VAT. Duration of the contract will be 24 months. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=351171-2022http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=319825-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=272448-2022. Ref.n. MS81. 27/22.  

  

France-Le Bourget du Lac: Infrastructure works consultancy services

2022/S 123-351171

Corrigendum

Notice for changes or additional information

Services

(Supplement to the Official Journal of the European Union, 2022/S 098-272448)

Legal Basis:
Directive 2014/25/EU

Section I: Contracting authority/entity

I.1)Name and addresses
Official name: Tunnel Euralpin Lyon Turin SAS
Postal address: Savoie Technolac - Bâtiment Homère - 13 allée du Lac de Constance - BP 281
Town: Le Bourget du Lac
NUTS code: FRK27 Savoie
Postal code: 73375
Country: France
Contact person: Fonction contrats de projet France
E-mail: fonction.contrats@telt-sas.com
Telephone: +33 479685650
Fax: +33 479685683
Internet address(es):
Main address: www.telt-sas.com
Address of the buyer profile: https://telt.achatpublic.com/accueil/

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Missions d'Assistance à maîtrise d'ouvrage (AMO) pour la rédaction des documents de la consultation (DC) du marché public de "Gestionnaire d'infrastructure virtuelle" pour TELT

Reference number: MS81
II.1.2)Main CPV code
71311300 Infrastructure works consultancy services
II.1.3)Type of contract
Services

Section VI: Complementary information

VI.6)Original notice reference
Notice number in the OJ S: 2022/S 098-272448

Section VII: Changes

VII.1)Information to be changed or added
VII.1.2)Text to be corrected in the original notice
Section number: IV.2.2
Instead of:
Date: 01/07/2022
Local time: 13:00
Read:
Date: 08/07/2022
Local time: 13:00
Section number: IV.2.7
Instead of:
Date: 01/07/2022
Local time: 15:00
Read:
Date: 08/07/2022
Local time: 15:00
VII.2)Other additional information:



Permalink


Sogen Srl from Cuorgnè (TO) secured the EUR 456,159.41 contract, excluding VAT, for the completion of the technological and mechanical systems of the Visitors Center built at the TELT La Maddalena site in the municipality of Chiomonte (To). Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=438425-2022. Ref. n. MT20. 32/22.



Permalink


Negotiated procedure with prior call for competition, deadline 19/09/2023, for the design and execution of secondary civil engineering works and equipment (railway and non-railway) necessary for the commissioning of the cross-border section of the new Lyon-Turin railway line - scheduled for 31/12/2032. The contract also includes the design and implementation of maintenance for at least seven years following its commissioning. For tender documents please click here, where tenders must be sent. Value of the contract is EUR2.93 bn, excluding VAT. Duration of the contract will be 255 months. Contact Tunnel Euralpin Lyon Turin SAS, Chambery, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=380665-2023. Ref. n. T15. 26/23.   

 





Permalink


Negotiated procedure with prior call for competition, deadline 28/09/2023, for the construction of the interconnection tunnel at Bussoleno with the NATM method -  2 tubes with a 1.9km length – which are part of the new Lyon-Turin railway line project. For tender documents please click here, where tenders must be sent. Value of the contract is EUR140 million, excluding VAT. Duration of the contract will be 86 months. Contact Tunnel Euralpin Lyon Turin SAS, Chambery, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=433901-2023. Ref. n. T17. 29/23.   

 




Permalink


Open invitation to tender, deadline 29/09/2023, for the executive design of the Environmental Monitoring Plan on the Italian side, relating to the construction of the future NLTL (New railway Line Turin-Lyon). The involved Italian sites are: C.O. 01 - Interconnection Susa – Bussoleno, C.O. 02 - Susa plain, C.O. 3 and 4 - Maddalena base tunnel – Susa, C.O. 10 - Sites for storage and valuation of materials, C.O. 12 - Technological systems and buildings. For tender documents please click here, where tenders must be sent. Value of the contract is EUR 428,900, excluding VAT. Duration of the contract will be 96 months. Contact Tunnel Euralpin Lyon Turin SAS, Chambery, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=499089-2023. Ref.n. MS93_Conception PMA IT. 33/23.   




Permalink



TELT has awarded to the Joint Venture Itinera (leader), Ghella and Spie Batignolle the EUR 1.1 bn contract for CO3/4 lot for the excavation of the Italian Chiomonte-Susa section of the base tunnel under the new Lyon-Turin railway link project: This will be a 28.5 km tunnel.  

The involved sites will be at Chiomonte where the TBMs will be launched and at Salbertrand where the segments factory will be built.  

The 2 bimodal TBMs will be used for driving 18 km through 6 geological formations: first rock, then unknown ground below the water, which will require the use of a freezing technique and then there will be rock again. In the last 400 m in Susa, the serpentinites could contain a small percentage of asbestos. If this were the case, the rocks will be packed in big bags and stored in the Maddalena tunnel, without ever going outside.  

The first TBM will start in 2025 and will excavate 10.5 km, the second TBM will start in 2027 and will excavate 7.4 km.  

In Salbertrand an area of approximately 11,800 m2 will allow the storage of up to 1680 segments equivalent to 210 rings. The manufacturing plant will have a production capacity of 70 -105 segments per day.  The works will last approximately 91 months and will start after the formalization of the contract (1-1.5 months) and the issuance of the executive order (2 months). 

Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget-du-Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit https://www.telt.eu/ and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=753973-2023.  Ref. T13. 35/23. 




Permalink


The consortium consisting of the Piedmont-based companies Cogeis, CO.GE.FA., TRA.MA., Cavit, M.S. Plant Technology and the Swiss company Hupac Intermodal have been awarded the EUR 648.2 million contract for the management and reuse of rock extracted during the excavation of the Mont Cenis base tunnel in Italy. More than 50% of the 7 million tonnes of rock extracted on Italian territory will be reused in the work during excavation of the cross-border section. The rocks will be classified at the exit of the tunnel in Chiomonte to determine the type of reuse and will then reach the industrial area of Salbertrand by motorway. Here a part will be used for the production of concrete with which the lining segments of the main tunnels will be made; another part will be used for railway embankments, i.e. the bases of the tracks. Finally, the material lacking the appropriate geomechanical characteristics is instead transported by train to Torrazza Piemonte and Caprie, where the rock will be used as backfill for disused quarries. Visit https://www.telt.eu/it/. 06/24.




Permalink

Italy, Genoa - it/79

Flood Relief

Fifteen core drills to cost €121,000 are to commence in Santa Margherita Ligure on the alignment of a 2,430 m-long 4.8 m-diameter flood relief tunnel to channel the San Siro stream. €450,000 detailed design in late 2003 or early 2004 for work start in 2005 and commissioning in 2007. Full cost €17 million. 01/03.



Permalink

Italy, Veneto - it/78

Highway

Tenders invited for the final design, construction and maintenance under a concession contract of the 64.4 km-long Pedemontana Veneta highway between Dueville, Vicenza province and Spresiano, Treviso province. Deadline 14th January, 2003. There will be 9 cut-and-cover tunnels. Construction is estimated at €701 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=191125-2002, OJ S 240, or contact Regione Veneto, Venice, fax +39 0412792259. E-mail trasporti@regione.veneto.it 51/02.Preinformation notice, deadline 28th April, 2004 for design, construction and operation under a concession contract of the 94.9 km-long Pedemontana Veneta toll highway connecting the A31 in Thiene (Vicenza province) and the A27 highway in Spresiano (Treviso province). Includes nine cut-and-cover tunnels. The project also plans to lenghten the A31 in Vicenza province to connect it with the A4 in Montebello with slipways in Malo, Castelgomberto and Montecchio. There will be a new 6.5 km double-tube tunnel from Castelgomberto to Malo. Work to start in end-2006 for opening July 2011. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=020814-2004, OJ S 24, or contact Regione del Veneto, Venezia, fax +39 0412792259. E-mail trasporti@regione.veneto.it 07/04.Notice of works concession, deadline 12th December, 2006 for design, construction and operation of the "Pedemontana Veneta" toll highway. The new highway will join highways A4, A31 and A27. It will start from the A4 in Montecchio Maggiore in Vicenza province to connect with the A31 and the A27 Mestre-Belluno in Spresiano in the province of Treviso. Tender estimate is EUR2.15 billion. The new highway will be approx. 90 km long, whereof 54.2 km of cut-and-cover and deep trenches. The 2 x 6.5 km Priabona tunnel is planned in Vicenza province between the Agro and Leo Leogra valleys. The new roadway will carry two lanes per direction, 3.75 m wide each, left and right shoulders of 0.75 and 2.5 m and central reservation of 3.5 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=218224-2006, OJ S 205, or contact Region of Veneto, Venice, fax +39 0412794660. E-mail trasporti@regione.veneto.it 45/06.By the end of the year, the so-called Pedemontana highway project in Veneto is expected to be awarded. Pedemontana means foothills in Italian. A "pedemontana" is generally a road at the foot of a mountain or hills. There are two bidders. The first candidate includes Cintra (68%), Merloni Finanziaria (32%) and Ferrovial. Cintra is the concession arm of Ferrovial. The second joint venture includes Sacyr Vallehermoso, Sacyr's concession arm Itinere Infraestructuras, Sipal and INC general contractor. Final design and land expropriation will take place in 2008. Construction would start presumably in 2009 and be concluded in 2012. The route is 64.4 km, running from the A31 Valdastico junction near Dueville to the junction with the A27 Mestre-Belluno near Spresiano. Nine false tunnels are planned (Fosse, Schiavonesca, FS Bassano-Padova, FS Bassano-Castelfranco, Altivole, Riese, Trevignano, Montebelluna and Villorba). The Priabona, under the Vicenza Prealps, would be 6 km long. This toll highway will accomodate each way two 3.75 m lanes, a 3 m emergency lane, a 0.50 m shoulder and a 2.5 m central reservation. 45/07.Impregilo is leading a consortium of companies including Pedemontana Veneta, Autostrada Brescia-Padova, Autostrade per l'Italia, Autovie Venete, Grandi Lavori Fincosit, Costruzioni Maltauro, Rizzani de Eccher, Carron, Consorzio Cooperative Costruzioni (CCC), Mantovani, Intercantieri Vittadello and Serenissima Costruzioni, who has been awarded the concession contract for the design, construction and operation of the Pedemontana highway. The concession plans the construction of an approx. 90 km two-lane dual carriageway and an emergency lane between Montecchio (Vicenza) on highway A4 and Spresiano (Treviso) on highway A27. The road artery will run partially underground (approx. 15 kilometres of tunnel), whereof two bored tunnels, one in Malo (Priabona tunnel, 6,503 m) and the other in Sant' Urbano (1.7 km), and nine cut-and-cover tunnels. The overall investment is nearly EUR2 billion. The concession duration is 39 years. Construction of the infrastructure from the design phase will take 76 months. Impregilo's share represents a share of EUR630 million. Work is set to commence in the second semester of 2008. Opening is scheduled for 2013. Visit www.impregilo.it, www.glf.it, www.gruppomaltauro.com, www.rizzanideeccher.com, www.carron.it, www.ccc-acam.it, www.fip-group.it, www.intercantieri.com, www.autobspd.it, www.autostrade.it and www.autovie.it 50-51/07.



Permalink

Italy, Bologna - it/77

Metro Line 2

The preliminary design of the second line between the airport and the central station plans 6 km of tunnel and eight stations. Route will cross the Reno and Navile rivers. TBM start near the Reno up to Piazza dell'Unití  where the line will intersect with Line 1 Fiera-Staveco. Cost estimated at €284 million. Approval by the government expected in June 2003. 49/02.



Permalink

Italy, Bologna - it/76

Metro Line 1

Construction of first line Fiera-Staveco (6 km) will be staggered with construction of first section Fiera-Stazione Centrale (3.5 km), to cost €171 million, and then Stazione Centrale-Staveco. Italian government to finance 60% and city 40%. TBM to bore double-track tunnel starting from the Michelino car park at the line head in Fiera and exiting in Piazza XX Settembre near the central station where connection to the high speed line will be possible. Work to commence in spring 2004. 49/02.A joint venture headed by Geodata, with Tecnicoop, Siteco, Policreo and Ineco as partners, won the tender to carry out the final design of Phase 1 of the metrotram in Bologna, offering a discount of EUR625,000, or 25% less than the tender estimate of EUR2.5 million. The contract is for the final design of the section running from the central railway station to Maggiore Hospital and updating the final design carried out by the city of Bologna for the 3.5 km section from Fiera Michelino to the central railway station. Visit www.geodata.it, www.tecnicoop.it, www.policreo.it and www.ineco.esThe most challenging problem is the tunnel that runs from Fiera Michelino to Maggiore Hospital, which is also the costliest part of the project. For that section, a single tube tunnel solution has been preferred under Indipendenza Street and Bassi Street, with a curve radius of just 35 metres. The proposed technical solution envisages in particular to reuse the underpass at Maggiore Square as access ramp to the stop there so that disrupting excavation works will be partly avoided in a central part of the city. In addition to the benefit of the existing underpass, Maggiore Square station will not have platforms placed in front of each other but one in Indipendenza Street and another in Bassi Street, both before the sharp bend to allow trainsets to negotiate the bend slowly without reducing running times. 36/07.



Permalink

Italy, Parma - it/75

Gas Pipe

Snam Rete Gas has awarded to Condotte d'Acqua the second section of the Pontremoli-Parma methane gas pipe which includes the 1,263 m-long Montecucchero tunnel, 4.25 m outer diameter and 3.6 m inner diameter, cross section 14.25 sq m, eight percent ascending gradient. Geology consisting of marls and sandstone in layers with variable thickness ranging from a few centimetres to several metres and compression strength of the sandstone that may reach 100 Mpa. The contractor will use a refurbished Lovat TBM previously used in Arezzo to bore four tunnels totalling 7 km. Concrete segmental rings comprising four hexagonal honeycomb 25 cm-thick segments, no key. As the tunnel progresses, the space between the segments and the tunnel face will be filled with cement grout. Basic design and work supervision by Snamprogetti. Project planning by Condotte d'Acqua. Preparatory work under way with tunnelling start planned for January 2003 for completion in May 2003. Installation of the gas pipe and filling of the tunnel with aerated concrete to be completed in November 2003. Cost €6.5 million financed by Snam Rete Gas. Visit www.condottespa.it, www.lovat.com and www.snamretegas.it 45/02.



Permalink

Italy, Venice - it/74

Metro

Preinformation notice for construction of a metro link under the lagoon between Tessera, Murano and Arsenale. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=157620-2002, OJ S 200, or contact City of Venice, fax 39 0412748712. Also visit www.comune.venezia.it/gare. Read E-News Weekly # 4. 43/02.



Permalink