Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Campania - it/279

Hydro

Closing Date: 15.05.2023 (Tender Closed)


Competitive procedure with negotiation, deadline 15/05/2023,  for theworjs and engineering services  for the drinking use of the water of Campolattarodam. The contract is composed by 3 lots. For bid documents click here, where tenders must be sent. Value of contract EUR529.27 million, excluding VAT. Duration of contract 96 months. Contact Giunta Regionale della Campania - Ufficio Speciale Grandi Opere , attn Salvatore Aversano, Naples, tel 39 0817964450, email salvatore.aversano@regione.campania.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=265089-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=202649-2023. Ref.n. 3593/RI/2023. 18/23. 




Permalink


The Joint Venture composed of Ghella (leader), TunnelPro, Itinera, within the ASTM Group, RDR and  IdroAmbiente has been awarded two of the three lots put out to tender for the design and execution of the works for the Campolattaro Dam, located in Campania, Italy. Value of contract is 410 million euros. Completion of the work will enable the enhancement of drinking water supply for more than 2.5 million people, as well as the irrigation of about 15,000 hectares for agricultural production. 

The first lot, whose value is approximately 277 million euros, will foresees the realization of a 7.5km diversion tunnel with a TBM, the construction of a drinking water treatment plant and a 30,000 cubic meters depositary reservoir. With the second lot, which is worth approximately 133 million euros, a potable adductor line will be built and the aqueducts in the area will be strengthened and integrated. 

Visit https://www.ghella.com. 41/23. 



Permalink

Italy, Campania - it/278

Railway

Closing Date: 15.09.2023 (Tender Closed)


Restricted invitation to tender, deadline 15/09/2023,  for the design, construction and equipment of the new  Afragola Napoli (LAN) line, from Afragola Centro to Piazza Carlo III at Naples. The contract includes design, supply and maintenance (full service).  

The construction works are composed of three parts: 

  1. The 9.5km main line with 10 stations and 2 interchanges with the existent railway at Vittorio and Casoria/Afragola. The single tube bi-track will be mainly driven by TBM EPB-S.  
  2. Optional 1.90 km extension to  Afragola High Speed station-Deposit with 1 Stations, a pedestrian interchange with RFI High Speed network, manufacts (ventilation chambers and safety exits), a depot, a interchange parking near Afragola High Speed station.  
  3. Optional 1.20 km extension to the center of Naples with 1 stations and manufacts (ventlation chambers and safety exits).  

For tender documents, click here. Value of the contract is  EUR1.61 bn, excluding VAT, with EUR 592.40 million belonging to  OG4 category. Duration of contract 2787 days. Contact Ente Autonomo Volturno Srl, attn Filippo Porzio, Naples, tel +39 0817722006, fax +39 0817722522, email f.porzio@eavsrl.it. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=438598-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=347100-2023http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=263605-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=198708-2023. 29/23. 




Permalink

Italy, Trentino-South Tyrol - it/277

Railway

Closing Date: 29.08.2023 (Tender Closed)


Open invitation to tender, deadline 29/08/2023, for the executive design and the construction of the new Virgolo railway tunnel - three tracks from km149+100 to km149+635 on the Verona-Brennero line, of the new sections(BD) of the Verona - Brennero line (km148+735 - km149+771), of the extension of the Meranese track (km 0+651 – km 1+763). Click here for tender documents, where tenders must be sent. Value of contract will be EUR78.55 million, excluding VAT, with EUR22.36 million belonging to OG4 category. Duration of the contract is 1655 days. Contact RFI SpA, attn Luca Lancieri, Rome, email l.lancieri@rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=388028-2023 . Ref. n. DAC.0134.2023. 27/23.  

 




Permalink

Italy, Liguria - it/276

Metro

Closing Date: 20.02.2023 (Tender Closed)

Open invitation to tender, deadline 20/02/2023, for the executive design and completion works of the Corvetto station, part of the Genoa subway. For tender documents please click here, where tenders must be sent. Value of the contract will be EUR38.39 million. Duration of the contract is 1181 days. Contact Comune di Genova, attn Eng. Manuela Sciutto, Genoa, tel +039 0105573325, fax +039 3346589853, email direzionemobilita@comune.genova.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=053864-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=726003-2022. Rif.n. 01-21-5039.  05/23. 

 



Permalink

Italy, South Tyrol - it/275

Road

Closing Date: 28.04.2022 (Tender Closed)


Open invitation to tender, deadline 28/04/2022, for the general management and safety coordination during construction of the Perca bypass on SS 49 Val Pusteria. For tender documents, please click here. Value of contract is EUR3.50 million, excluding VAT. Duration of contract will be 1700 days. Contact Provincia Autonoma di Bolzano, attn Umberto Simone, email umberto.simone@provinz.bz.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=204436-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=192606-2022. Ref.n. TB/IS 3/2022. 16/22. 

 




Permalink


Open invitation to tender, deadline 09/03/2022, for the construction of the Perca bypass on SS49 Val Pusteria, including a 2317 tunnel, 632 m of which in cut&cover. For tender documents, please click here. Value of the contract is EUR 79.99 million contract,  excluding VAT. Duration of the contract will be 1470 days. Contact Provincia Autonoma di Bolzano, email generaldirektion@provinz.bz.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=073133-2022.  Ref.n. TB IS-01 2022. 07/22. 

 




Permalink


Open invitation to tender, deadline 17/11/2022, for technical-administrative, static and plant testing (including fire testing) during and at the end of construction for the Perca bypass on SS49 Val Pusteria, including a 2317 tunnel. For tender documents, please click here. Value of the contract is EUR1.23 million contract,  excluding VAT. Duration of the contract will be 1700 days. Contact Provincia Autonoma di Bolzano, attn Arno Brancalion, email arno.brancalion@provincia.bz.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=612262-2022, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=598502-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=575651-2022.  Ref.n. TB IS-10 2022. 45/22. 

 




Permalink


The Joint Venture Valdemarin Srl from Bressanone (BZ),  EUT Engineering GmbH from Bressanone (BZ), Bergmeister GmbH from Varna (BZ),  PLAN TEAM GmbH  from Bolzano and Pfeifer Partners GmbH from Appiano (BZ) have secured the EUR 1.69 million contract,  excluding VAT, for the general management and safety coordination during construction of the Perca bypass on SS 49 Val Pusteria. Contact Provincia Autonoma di Bolzano, attn Umberto Simone, email umberto.simone@provinz.bz.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=648791-2022.  47/22.



Permalink


The Joint Venture Strabag AG, Alpenbau GmbH, Unionbau AG and Moser & Co have secured the EUR 73.51 million contract for the construction of the Perca bypass on the SS49 Val Pusteria, including a 2317 tunnel, 632 m of which is cut & cover. Contact Provincia Autonoma di Bolzano, email generaldirektion@provinz.bz.it. Visit https://news.provincia.bz.it. Ref.n. TB IS-01 2022. 47/22. 

 




Permalink

Italy, Basilicata - it/274

Railway

Closing Date: 02.11.2022 (Tender Closed)


Open invitation to tender, deadline 02/11/2022, for the executive design and completion, extraordinary maintenance, integration and adaptation of the existing works of the new Ferrandina - Matera La Martella line. The contract includes the construction of the following new infrastructures: Basento 1 viaduct, rock tunnel for the emergency exit from the 6.5km Miglionico tunnel, extension of the cut&cover sections at the Miglionico tunnel entrances, new technological buildings, railway equipment with armament, signaling and telecommunication systems, light and driving power, contact line, mechanical systems and electrical substations. For tender documents please click here, where tenders must be sent. Value of the contract is EUR311.71 million, excluding VAT, with EUR 79.87 million belonging to OG4. The duration of the contract will be 1170 days. Contact Rete Ferroviaria Italiana, attn Alessio Sammartino, Rome, email rfi-ad-dac.ba@pec.rfi.it.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=433258-2022. Ref.n. DAC.0128.2022_GPA_Ferrandina-Matera. 32/22

 

Italy-Rome: Railway construction works


2022/S 151-433258

Contract notice – utilities

Works

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: Rete Ferroviaria Italiana – Società con socio unico soggetta alla direzione e coordinamento di Ferrovie dello Stato Italiane S.p.A. a norma dell’art. 2497 sexies Codice Civile e del D.Lgs. 112/2015. Direzione Acquisti – Sede di Roma
Postal address: Via dello Scalo Prenestino, 25
Town: Roma
NUTS code: ITI43 Roma
Postal code: 00159
Country: Italy
Contact person: Responsabile del Procedimento per la fase di affidamento: Alessio Sammartino
E-mail: rfi-ad-dac.ba@pec.rfi.it
Internet address(es):
Main address: www.gare.rfi.it
I.6)Main activity
Railway services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


Progettazione esecutiva ed esecuzione dei lavori per completamento, manutenzione straordinaria, integrazione e adeguamento delle opere esistenti della nuova linea Ferrandina–Matera La Martella


Reference number: DAC.0128.2022 - CUP J81H92000020001 - CIG 93350062A6
II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.5)Estimated total value
Value excluding VAT: 311 708 426.85 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ITF52 Matera
II.2.6)Estimated value
Value excluding VAT: 311 708 426.85 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in days: 1170
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 02/11/2022
Local time: 12:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Italian

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
03/08/2022




Permalink


Postponed from 02/11/2022 to 21/11/2022 the deadline of the open invitation to tender for the executive design and completion, extraordinary maintenance, integration and adaptation of the existing works of the new Ferrandina - Matera La Martella line. The contract includes the construction of the following new infrastructures: Basento 1 viaduct, rock tunnel for the emergency exit from the 6.5km Miglionico tunnel, extension of the cut & cover sections at the Miglionico tunnel entrances, new technological buildings, railway equipment, signaling and telecommunication systems, light and driving power, contact line, mechanical systems and electrical substations. For tender documents please click here, where tenders must be sent. Value of the contract is EUR 311.71 million, excluding VAT, with EUR 79.87 million belonging to OG4. The duration of the contract will be 1170 days. Contact Rete Ferroviaria Italiana, attn Alessio Sammartino, Rome, email rfi-ad-dac.ba@pec.rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=605004-2022 . Ref.n. DAC.0128.2022_GPA_Ferrandina-Matera. 44/22 

 




Permalink

Italy, Abruzzo and Lazio - it/273

Motorway


Prior information notice for the design, implementation and construction of a dynamic monitoring system for the remote control of bridges, viaducts, tunnels and geotechnical support works, of Smart Road Technological Systems and of a Processing Control Center Station, data management and monitoring for the A24 and A25 motorways. Value of the contract is EUR200 million, excluding VAT. Estimated date of publication of the contract notice: 31/12/2021. Contact Italferr SpA, attn Massimo Scalzi, Rome, tel +39 0649752087, email  gareappalti.italferr.it@legalmail.it

Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=493227-2021. 41/21.  

Italy-Rome: Road-maintenance works

2021/S 191-493227

Prior information notice

This notice is for prior information only

Works

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Italferr S.p.A., Società con socio unico, soggetta all'attività di direzione e coordinamento di Ferrovie dello Stato Italiane S.p.A. in nome e per conto del Commissario Straordinario Autostrade A24-A25 nominato ai sensi dell’art.206, c.1 D.L. 19/05/2020, n.34, convertito in L. 17/07/2020 n.77
Postal address: Via Vito Giuseppe Galati, 71
Town: Roma
NUTS code: IT Italia
Postal code: 00155
Country: Italy
Contact person: Massimo Scalzi
E-mail: gareappalti.italferr.it@legalmail.it
Telephone: +39 0649752087
Internet address(es):
Main address: www.acquistionline.italferr.it
Address of the buyer profile: http://www.italferr.it
I.3)Communication
Additional information can be obtained from the abovementioned address
I.4)Type of the contracting authority
Body governed by public law
I.5)Main activity
Other activity: Servizi

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Autostrade A24-A25

II.1.2)Main CPV code
45233141 Road-maintenance works
II.1.3)Type of contract
Works
II.1.4)Short description:

Progettazione, implementazione e realizzazione di un Sistema di “MONITORAGGIO DINAMICO” per il controllo da remoto di ponti, viadotti, tunnel ed opere geotecniche di sostegno, di Sistemi Tecnologici “SMART ROAD” e di una “STAZIONE CENTRO DI CONTROLLO” di elaborazione, gestione e monitoraggio dei dati per le AUTOSTRADE A24 e A25.

II.1.5)Estimated total value
Value excluding VAT: 200 000 000.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ITF1 Abruzzo
NUTS code: ITI4 Lazio
Main site or place of performance:

Autostrade A24-A25

II.2.4)Description of the procurement:

Progettazione, implementazione e realizzazione di un Sistema di “MONITORAGGIO DINAMICO” per il controllo da remoto di ponti, viadotti, tunnel ed opere geotecniche di sostegno, di Sistemi Tecnologici “SMART ROAD” e di una “STAZIONE CENTRO DI CONTROLLO” di elaborazione, gestione e monitoraggio dei dati per le AUTOSTRADE A24 e A25.

II.2.14)Additional information
II.3)Estimated date of publication of contract notice:
31/12/2021

Section IV: Procedure

IV.1)Description
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: no

Section VI: Complementary information

VI.3)Additional information:

Criterio di aggiudicazione: Offerta Economicamente più Vantaggiosa.


Il Bando di gara potrà prevedere la suddivisione in lotti.


Categorie di lavori: prevalente OS19. Altre categorie saranno indicate nel Bando di gara.


Nell'appalto sono compresi, oltre ai lavori, i servizi e le forniture.

VI.5)Date of dispatch of this notice:
27/09/2021



Permalink


Open invitation, deadline 05/06/2023, for fire protection services on the A24-A25 motorway sections, in inadequate tunnels falling within the ANAS sphere. The contract is divided into 3 lots: 

Lot 1 - tunnels: Stonio, Ara Salere, Roviano, Pietrasecca, Colle Mulino 

Lot 2 - tunnels: Genzano, San Giacomo, Gran Sasso, Colledara, Collurania 

Lot 3 - tunnels: Monte Sant'Angelo, San Rocco, San Domenico, Colle Castiglione 

For tgender documents click here, where tenders must be sent. Value of the contract is EUR 17.27 million, excluding VAT. Contact ANAS Spa, Roma, email acquisti@postacert.stradeanas.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=230941-2023. Ref.n. DGACQ 23-23. 19/23.   




Permalink

Italy, National - it/272

Railway and Road

Closing Date: 06.10.2021 (Tender Closed)


Open invitation to tender, deadline 06/10/2021, for 5 framework agreements contracts on qualified support for the Technical and Economic Feasibility Design and the Final Design of railway and road infrastructures in Italy:  Lot 1 - RdA-45692 - Regions Valle d’Aosta, Piedmont, Liguria; Lot 2 - RdA-45693 - Regions Lombardy, Veneto, Emilia Romagna; Lot 3 - RdA-45695 - Regions Trentino Alto Adige, Friuli Venezia Giulia; Lot 4 - RdA-45696 - Regions Tuscany, Umbria, Marche, Lazio, Abruzzo, Molise, Campania; Lot 5 - RdA-45697 - Regions Puglia, Basilicata, Calabria, Sicily, Sardegna. Value of the contract is EUR 20 million, excluding VAT. Duration of the contract will be 24 months. For tender documents https://www.acquistionline.italferr.it/esop/toolkit/opportunity/current/3252/detail.si where tendes must be sent. Contact Italferr SpA, attn Angelo Putaturo, Rome, tel +39 0649752446/05, email gareappalti.italferr.it@legalmail.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=450309-2021. Ref.n. RdA45692 - RdA45693 - RdA45695 - RdA45696 - RdA45697. 36/21.

Italy-Rome: Railway engineering services

2021/S 172-450309

Contract notice – utilities

Services

Legal Basis:

Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses

Official name: Italferr S.p.A., Società con socio unico, soggetta all'attività di direzione e coordinamento di Ferrovie dello Stato Italiane S.p.A.
Postal address: Via Vito Giuseppe Galati, 71
Town: Roma
NUTS code: IT Italia
Postal code: 00155
Country: Italy
Contact person: Angelo Putaturo
E-mail: gareappalti.italferr.it@legalmail.it
Telephone: +39 0649752446/05
Internet address(es):
Main address: www.acquistionline.italferr.it
Address of the buyer profile: http://www.italferr.it

I.6)Main activity

Railway services

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

RdA-45692 - RdA-45693 - RdA-45695 - RdA-45696 - RdA-45697

II.1.2)Main CPV code

71311230 Railway engineering services

II.1.3)Type of contract

Services

II.1.5)Estimated total value

Value excluding VAT: 20 000 000.00 EUR

II.1.6)Information about lots

This contract is divided into lots: yes

II.2)Description

II.2.1)Title:

RdA-45692 - CIG: 88160556BB

Lot No: 1

II.2.2)Additional CPV code(s)

71311230 Railway engineering services

II.2.3)Place of performance

NUTS code: IT Italia

II.2.6)Estimated value

Value excluding VAT: 4 000 000.00 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 24

This contract is subject to renewal: no

II.2)Description

II.2.1)Title:

RdA-45693 - CIG: 88160724C3

Lot No: 2

II.2.2)Additional CPV code(s)

71311230 Railway engineering services

II.2.3)Place of performance

NUTS code: IT Italia

II.2.6)Estimated value

Value excluding VAT: 4 000 000.00 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 24

This contract is subject to renewal: no

II.2)Description

II.2.1)Title:

RdA-45695- CIG: 8816085F7A

Lot No: 3

II.2.2)Additional CPV code(s)

71311230 Railway engineering services

II.2.3)Place of performance

NUTS code: IT Italia

II.2.6)Estimated value

Value excluding VAT: 4 000 000.00 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 24

This contract is subject to renewal: no

II.2)Description

II.2.1)Title:

RdA-45696 - CIG: 8816097963

Lot No: 4

II.2.2)Additional CPV code(s)

71311230 Railway engineering services

II.2.3)Place of performance

NUTS code: IT Italia

II.2.6)Estimated value

Value excluding VAT: 4 000 000.00 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 24

This contract is subject to renewal: no

II.2)Description

II.2.1)Title:

RdA-45697 - CIG: 88161071A6

Lot No: 5

II.2.2)Additional CPV code(s)

71311230 Railway engineering services

II.2.3)Place of performance

NUTS code: IT Italia

II.2.6)Estimated value

Value excluding VAT: 4 000 000.00 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 24

This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information

IV.2.2)Time limit for receipt of tenders or requests to participate

Date: 06/10/2021

Local time: 13:00

IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates

IV.2.4)Languages in which tenders or requests to participate may be submitted:

Italian

Section VI: Complementary information

VI.5)Date of dispatch of this notice:

01/09/2021





Permalink

Italy, Veneto - it/271

High Speed Railway


Qualification system with call for competition for the construction of the 44.2km section (2.1 km of which in tunnel) from Verona to Bivio Vicenza (Lot 1) of the high-speed/high-capacity railway between Verona and Padua. Click here for sending tenders or requests to participate. Duration of the qualification system from 01/03/2021 to 31/12/2025. Contact Consorzio Iricav Due, attn Giovanni Luzzi, San Martino Buon Albergo (VR), email info.rup@iricavdue.it.   For further on TED tender, please click here. 11/21.  

 




Permalink

Italy, Trentino-South Tyrol/Veneto - it/270

High Speed Railway

Closing Date: 12.10.2020 (Tender Closed)


Open invitation to tender, deadline 12/10/2020, for the design and construction of the quadrupling of the current Fortezza-Verona railway, section Fortezza-Ponte Gardena (Lot 1). The new 25 km from the Fortezza interconnection to the Ponte Gardena station, will include the two bi-tube tunnels Scaleres (15.4 km)  and Gardena (6.3 km), joined by a viaduct over the Eisack River. Value of the contract will be EUR1.17 billion, excluding VAT, of which EUR 858.47 million, excluding VAT, belonging to OG4 category. Contact RFI SpA, Rome, attn Giuseppe Albanese, email rfi-ad-dac.ge@pec.rfi.it. For tender document click here and here where tenders must be sent. Ref.n.DAC.0132.2020. 34/20.






Permalink


The consortium Webuild Group (51% lead)/Implenia (49%) have been selected as best bidder for the design and construction of the quadrupling of the current Fortezza-Verona railway, section Fortezza-Ponte Gardena (Lot 1). The new 25 km from the Fortezza interconnection to the Ponte Gardena station, will include the two twin tube tunnels Scaleres (15.4 km)  and Gardena (6.3 km), joined by a viaduct over the Eisack River. Value of the contract EUR 1.07 bn, excluding VAT. Contact RFI SpA, Rome, attn Giuseppe Albanese, email rfi-ad-dac.ge@pec.rfi.it. For further visit https://www.webuildgroup.com/en  and https://implenia.com/en/ and click here. Ref.n.DAC.0132.2020. 09/21. 

 




Permalink


The Consortium Dolomiti Webuild Implenia from Fortezza have secured the EUR 1.07 bn contract, excluding VAT, for the design and construction for the quadrupling of the current Fortezza-Verona railway, section Fortezza-Ponte Gardena (Lot 1). The new 25 km from the Fortezza interconnection to the Ponte Gardena station, will include the two twin -tube tunnels Scaleres (15.4 km)  and Gardena (6.3 km), joined by a viaduct over the Eisack River. Contact RFI SpA, Rome, attn Giuseppe Albanese, email rfi-ad-dac.ge@pec.rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=462217-2022. Ref.n.DAC.0132.2020. 34/22. 



Permalink


Open invitation to tender, deadline 14/11/2022, for the design and construction of the Trento railway bypass (Lot 3A), part of the quadrupling of the current Fortezza-Verona railway, The contract includes the bi-tube rock tunnel Trento (10.5 km)  and 0.5km of cut&cover tunnels. For tender documents please click here, where tenders must be sent. Value of the contract will be EUR985.75 million, excluding VAT, of which EUR522,37 million, excluding VAT, belonging to OG4 category. Duration contract 1278 days. Contact RFI SpA, Rome, attn Luca Lancieri, email l.lancieri@rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=521812-2022, Ref.n. DAC.0153.2022. 39/22. 

Italy-Rome: Railway construction works

2022/S 184-521812

Contract notice – utilities

Works

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: Rete Ferroviaria Italiana in sigla «RFI SpA» — Società con socio unico soggetta alla direzione e coordinamento di Ferrovie dello Stato italiane SpA a norma dell’art. 2497 sexies cod. civ. e del D.Lgs. n. 112/2015. Direzione acquisti — Sede di Roma
Postal address: Via dello Scalo Prenestino, n.25
Town: ROMA
NUTS code: ITI43 Roma
Postal code: 00159
Country: Italy
Contact person: Responsabile del Procedimento per la fase di affidamento: Luca Lancieri
E-mail: l.lancieri@rfi.it
Internet address(es):
Main address: http://www.gare.rfi.it
I.3)Communication
Access to the procurement documents is restricted. Further information can be obtained at: https://www.acquistionlinerfi.it
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted electronically via: https://www.acquistionlinerfi.it
Tenders or requests to participate must be submitted to the abovementioned address
I.6)Main activity
Railway services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

GPA - Progettazione esecutiva ed esecuzione dei lavori relativi alla realizzazione del Lotto 3A, Circonvallazione di Trento, del quadruplicamento della linea ferroviaria Fortezza-Verona CIG 9410535B24

Reference number: DAC.0153.2022 - Circonvallazione di Trento
II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.4)Short description:

GPA - Progettazione esecutiva ed esecuzione dei lavori relativi alla realizzazione del Lotto 3A, Circonvallazione di Trento, del quadruplicamento della linea ferroviaria Fortezza-Verona dalla chilometrica 84+287 di linea storica Verona - Brennero a sud di Trento (coincidente con la chilometrica 0+000 binario dispari della circonvallazione) fino alla chilometrica 98+100 di linea storica a nord (coincidente con il km 13+991,2 binario dispari della circonvallazione). L’intervento è caratterizzato da opere prevalentemente in galleria naturale ed è comprensivo della realizzazione di due tratti in variante della Linea Storica Verona – Brennero in stretto affiancamento, nei tratti dell’intervento di interconnessione iniziale (dal km 84+287 al km 85+834) e finale (dal 95+765 al Km 97+542 per il binario dispari e al km 97+870 per il binario pari), dell’armamento ferroviario, degli impianti meccanici, degli impianti di trazione elettrica, e della realizzazione di un tratto di deviazione della linea a singolo binario Trento – Malè (dalla chilometrica 0+000 alla chilometrica 1+088,6) - CIG: 9410535B24 - CUP: J41C09000000005

Importo posto a base di gara Euro 977.635.147,10 al netto IVA, di cui Euro 42.974.196,22 per oneri relativi all’attuazione dei piani di sicurezza, non soggetti a ribasso.

Validazione del progetto avvenuto con nota prot. RFI-NEMI.DIN.DINE.VR\VERB\P\2022\0000106 del 15/09/2022.

Per una puntuale descrizione dell'appalto si rinvia al contenuto dell'oggetto dello schema di convenzione allegato al disciplinare di gara.

II.1.5)Estimated total value
Value excluding VAT: 985 749 267.10 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ITH20 Trento
Main site or place of performance:

Trento



Permalink


Open invitation to tender, deadline 14/11/2022, for the design and construction of the Trento railway bypass (Lot 3A), part of the quadrupling of the current Fortezza-Verona railway, The contract includes the twin-tube rock tunnel Trento (10.5 km)  and 0.5km of cut&cover tunnels. For tender documents please click here, where tenders must be sent. Value of the contract will be EUR985.75 million, excluding VAT, of which EUR522,37 million, excluding VAT, belonging to OG4 category. Duration contract 1278 days. Contact RFI SpA, Rome, attn Luca Lancieri, email l.lancieri@rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=521812-2022, Ref.n. DAC.0153.2022. 39/22. 


Italy-Rome: Railway construction works

2022/S 184-521812

Contract notice – utilities

Works

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: Rete Ferroviaria Italiana in sigla «RFI SpA» — Società con socio unico soggetta alla direzione e coordinamento di Ferrovie dello Stato italiane SpA a norma dell’art. 2497 sexies cod. civ. e del D.Lgs. n. 112/2015. Direzione acquisti — Sede di Roma
Postal address: Via dello Scalo Prenestino, n.25
Town: ROMA
NUTS code: ITI43 Roma
Postal code: 00159
Country: Italy
Contact person: Responsabile del Procedimento per la fase di affidamento: Luca Lancieri
E-mail: l.lancieri@rfi.it
Internet address(es):
Main address: http://www.gare.rfi.it
I.3)Communication
Access to the procurement documents is restricted. Further information can be obtained at: https://www.acquistionlinerfi.it
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted electronically via: https://www.acquistionlinerfi.it
Tenders or requests to participate must be submitted to the abovementioned address
I.6)Main activity
Railway services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

GPA - Progettazione esecutiva ed esecuzione dei lavori relativi alla realizzazione del Lotto 3A, Circonvallazione di Trento, del quadruplicamento della linea ferroviaria Fortezza-Verona CIG 9410535B24

Reference number: DAC.0153.2022 - Circonvallazione di Trento
II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.4)Short description:

GPA - Progettazione esecutiva ed esecuzione dei lavori relativi alla realizzazione del Lotto 3A, Circonvallazione di Trento, del quadruplicamento della linea ferroviaria Fortezza-Verona dalla chilometrica 84+287 di linea storica Verona - Brennero a sud di Trento (coincidente con la chilometrica 0+000 binario dispari della circonvallazione) fino alla chilometrica 98+100 di linea storica a nord (coincidente con il km 13+991,2 binario dispari della circonvallazione). L’intervento è caratterizzato da opere prevalentemente in galleria naturale ed è comprensivo della realizzazione di due tratti in variante della Linea Storica Verona – Brennero in stretto affiancamento, nei tratti dell’intervento di interconnessione iniziale (dal km 84+287 al km 85+834) e finale (dal 95+765 al Km 97+542 per il binario dispari e al km 97+870 per il binario pari), dell’armamento ferroviario, degli impianti meccanici, degli impianti di trazione elettrica, e della realizzazione di un tratto di deviazione della linea a singolo binario Trento – Malè (dalla chilometrica 0+000 alla chilometrica 1+088,6) - CIG: 9410535B24 - CUP: J41C09000000005

Importo posto a base di gara Euro 977.635.147,10 al netto IVA, di cui Euro 42.974.196,22 per oneri relativi all’attuazione dei piani di sicurezza, non soggetti a ribasso.

Validazione del progetto avvenuto con nota prot. RFI-NEMI.DIN.DINE.VR\VERB\P\2022\0000106 del 15/09/2022.

Per una puntuale descrizione dell'appalto si rinvia al contenuto dell'oggetto dello schema di convenzione allegato al disciplinare di gara.

II.1.5)Estimated total value
Value excluding VAT: 985 749 267.10 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ITH20 Trento
Main site or place of performance:

Trento

II.2.4)Description of the procurement:

Importi delle categorie di cui si compone l’opera:

OG04 522.366.487,52 €

OS21 172.235.649,99 €

OG03 157.166.006,31 €

OS29 36.355.775,48 €

LAR-003 13.546.235,66 €

OS34 11.837.173,05 €

OG10 8.527.447,93 €

LTE-002 7.792.171,83 €

LTE-001 5.639.889,55 €

OS18-A 4.060.777,72 €

LTE-004 3.676.813,93 €

OS19 3.568.581,98 €

OG01 3.195.574,79 €

OS23 2.297.271,38 €

OS08 2.250.884,26 €

OG06 1.545.000,00 €

LIS-C 1.356.292,61 €

OG08 1.309.437,81 €

OS28 1.167.786,79 €

OS03 1.115.966,31 €

OS30 393.503,03 €

OG12 385.634,31 €

OS18-B 233.454,91 €

OS12-A 147.187,47 €

OS24 141.157,47 €

OS20-B 65.055,58 €

BOE 2.458.507,27 €



Permalink

The value of the contract awarded to the Consortium Dolomiti Webuild Implenia from Fortezza for the design and construction for the quadrupling of the current Fortezza-Verona railway, section Fortezza-Ponte Gardena (Lot 1) including the two twin -tube tunnels Scaleres (15.4 km) and Gardena (6.3 km), has been modified, by adding EUR330,388.95, excluding VAT, Contact RFI SpA, Rome, attn Damiano Beschin, tel +39 458024164, email rfi-din-dine.vr@pec.rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=081548-2023. Ref.n.DAC.0132.2020. 06/23.



Permalink

The consortium Webuild (leader, 51%), Ghella (35%), Collini Lavori (10%) and Seli Overseas (4%) secured the EUR934 million contract, excluding VAT, for the design and construction of the Trento railway bypass (Lot 3A), part of the quadrupling of the current Fortezza-Verona railway, The contract includes the twin tube rock tunnel Trento (10.5 km) to be built by 4 TBMs with 0.5km of cut&cover tunnels. Contact RFI SpA, Rome, attn Luca Lancieri, email l.lancieri@rfi.it. Visit https://www.rfi.it/ and https://www.webuildgroup.com/. Ref.n. DAC.0153.2022. 06/23.



Permalink