Ukraine

Ukraine, Dnipropetrovsk - ua/15

Metro

Closing Date: 30.07.2013 (Tender Closed)

Prior information notice of EUR366 million project to extend Dnipropetrovsk metro using EBRD seed capital of EUR152 million. Tendering commences Q3/2012. Interested suppliers, contractors and consultants contact Viktor Sitonin, tel +380 562 423768, fax +380 56 7786533, e-mail metro@dniprorada.gov.ua. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=254684-2012. 33/12.



Permalink

Invitation to tender using restricted procedure, deadline 22.11.2012, for contract no 1A completion of construction of metro in Dnipropetrovsk comprising design and construction of 4 km of tunnels with three stations and associated works as part of EUR366 million project to extend metro using EBRD seed capital of EUR152 million. Prequalification documents from Sitonin Viktor Ivanovich, Metro office, 8 Kurchatova Street, Dnipropetrovsk, Ukraine 49038, tel +380 562 423768, fax +380 56 7786533, e-mail metro@dniprorada.gov.ua. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=328043-2012. 42/12.



Permalink

Invitation for expressions of interest, deadline 12.11.2012, to contract a lender's technical supervisor to assist EBRD in monitoring Dnipropetrovsk Metro Extension project. The assignment is expected to start in Q1/2013 and last for 5 years. The Assignment may be extended at the end of five years depending on the progress of the project. Cost estimate for the Assignment: EUR295,000, excluding VAT. Contact Georgia Vasiliadis, EBRD, London, tel + 44 20 7338 7750, fax +44 20 7338 7451, e-mail vasiliag@ebrd.com.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=344556 -2012. 44/12.



Permalink

Invitation to tender using restricted procedure, deadline 10.12.2012, for Engineer to supervise construction of metro in Dnipropetrovsk comprising design and construction of 4 km of tunnels with three stations and associated works as part of EUR366 million project to extend metro using EBRD seed capital of EUR152 million. Contract to commence Q3/2013, duration 48 months. Prequalification documents from Sitonin Viktor Ivanovich, Metro office, 8 Kurchatova Street, Dnipropetrovsk, Ukraine 49038, tel +380 562 423768, fax +380 56 7786533, e-mail metro@dniprorada.gov.ua. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=366431-2012. 47/12.



Permalink

Ukraine, Autonomous Republic of Crimea - ua/14

Water main and wastewater

Closing Date: 04.07.2013 (Tender Closed)

Prior Information Notice, deadline 04.07.2013, for a project to finance the rehabilitation and upgrade of water and wastewater treatment facilities and system in the Autonomous Republic of Crimea, including rehabilitation of Schastlivoye tunnel water main. Tendering in Q4/2012, total estimated value EUR18 million. Contact Production Enterprise of Water and Wastewater Management Utility of the South Coast of Crimea, Yalta, Ms Larissa Zhaliy, tel +380 654 342892, fax +380 654 275167, e-mail zhaliy@bk.ru. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=218160-2012. 29/12.



Permalink

Ukraine, Transcarpathia - ua/13

High Speed Railway

Invitation for expressions of interest, deadline 15th March, 2007 for consultancy services for the Beskyd railway tunnel. The project encompasses construction of a new railway tunnel alongside the existing 1,736 m Beskyd tunnel, which is one of the major bottlenecks on trans-European corridor V between Ukraine and Western Europe. The existing tunnel is currently restricted to one line, in an advanced state of deterioration and has a speed limit of 15 km/h. The assignment requires the following services: preparation of tender documents for the procurement of the tunnel construction works; implementation of an open tendering; and supervision of works. The assignment is expected to start during the third quarter of 2007 and last about three years. Visit www.ebrd.com/oppor/procure/opps/consult/070213a.htm or contact Ukrzaliznytsia (UZ), Kiev, tel. +380 444653770, fax +380 444653772. 08/07.Invitation to prequalify, deadline 21st July, 2008 for design and construction (civil and track works) and for design and installation of electrical and mechanical works for the new Beskyd tunnel, a double-track railway tunnel with a length of 1,822 m and an excavation cross-section of up to 115 sq m. The tunnelling method is to be determined by the design. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=151944-2008, OJ S 113, or contact Ukrainian Railways, Kiev, fax +380 444653772. E-mail piu@lotus.uz.gov.ua 25/08.



Permalink

Open invitation to tender, deadline 02.09.2010, for design and construction of estimated 1.8 km-long, 115 sq m Beskyd tunnel as part of Ukrainian Railways Fast Passenger Trains Project, financed by EBRD. Design period 140 days, construction period 800 days. Tender documents cost USD200.00. Security of EUR1.5 million to accompany each tender. More from Yuriy Simchuk at PIU in Kiev, tel +380 44 465 37-70, fax -72, e-mail piu@lotus.uz.gov.ua. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=204881-2010. 28/10.



Permalink

Open invitation to tender, deadline 01.12.2011, for feasibility study of options for design and construction of estimated 1.8 km-long, 115 sq m Beskyd tunnel as part of Ukrainian Railways Fast Passenger Trains Project, financed by EBRD. Contract starts 01.01.2012 for completion within four months. More information from TPU in Lviv, tel +380 32 226-4709, -4554, -3997 and -3916. Tenders to TPU, Office 517, Lystopadovoho Chynu St, 22, Lviv, Ukraine 79000. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=349739-2011. 45/11.



Permalink

Ukraine, Krasnodar - ua/12

Marine Railway

Three single-track tunnels totalling 8.8 km designed by Espo, value $70 million on 42-month construction contract, for Crimean government to transport oil under Kerch Strait. Start search at www.crimea.ua 22/01.



Permalink

Ukraine, Donetsk - ua/11

Metro

Work commenced on six-station line with launch of 5.6 m TBM from Proletarski. Completion planned for 2005. April 1999.



Permalink

United Arab Emirates

United Arab Emirates, Dubai - ae/21

Hydro

Dubai Electricity and Water Authority (Dewa), awarded the Strabag Dubai LLC, Strabag AG, Andritz Hydro (Austria) and Ozkar Insaat (Turkie) consortium the EUR340 million (AED1.437 bn) design, build and commission contract for the Hatta pumped storage power plant, located in the Hajar Mountains, 140 km southeast of the city of Dubai.

The project includes:

-              a turbine shaft with a diameter of approximately 36 m and a depth of almost 70 m to house two Francis turbines with a power output of 250 MW;

-              a 1.2 km long pressure tunnel connecting the existing lower reservoir, to be upgraded, to the new upper reservoir.

-              the upper reservoir to be constructed with two roller-compacted concrete dams with a height of approximately 35 m and 70 m.

-              two road tunnels, length 470 m and 440 m, to be built by drill & blast.

-              the reinforced concrete outflow and intake structures;

-              several ancillary buildings as well as their extension and E&M systems.

The project, the first of its kind in the region, will generate 250 MW and it is scheduled to be commissioned by February 2024. Visit https://www.strabag.com, https://www.andritz.com/ and http://www.ozkarins.com.tr/Default.aspx. 40/19.





Permalink

United Arab Emirates, Dubai - ae/20

Route 2020

Dubai’s Roads and Transport Authority (RTA) has announced the award of the EUR2.6 bn contract (AED10.6 bn) to the ExpoLink Consortium, led by France’s Alstom and including Spain’s ACCIONA and Turkey’s Gulermak for Route 2020 project. The  15 km Route 2020 line will start at the Nakheel & Harbor station on Red Line: 11.8 km on a viaduct and 3.2 km underground, with 7 stations (one interchange station, one station at EXPO site, 3 elevated stations and 2 underground stations).Visit https://www.acciona.com/pressroom/news/2016/june/acciona-design-construct-dubai-metro-extension-project-worth-26-billion/.

26/16.



Permalink

United Arab Emirates, Dubai - ae/19

Airport


Lane Construction Corporation (60%), a U.S. subsidiary of the Salini Impregilo Group, with the National Contracting Transportation Corp of Sharjah (40%) has won contracts in the United Arab Emirates (UAE) related to the Al Maktoum International Airport Expansion Project in Dubai. Value of the project is EUR117.5 million (USD125 million) project. The project entails new terminal facilities, concourses, runways, roads and tunnels. Once completed, the expanded airport is expected to accommodate more than 220 million passengers a year, making it the world’s biggest in terms of size and passenger capacity by 2050. Visit http://www.salini-impregilo.com.50/16.




Permalink

United Arab Emirates, Dubai - ae/18

Sewer

Dubai Municipality  has awarded to Parsons Overseas Ltd (USA) the contract for consultancy and supervision of the EUR3.01 billion (AED 12.5 billion) Dubai Strategic Sewerage Tunnel project. The contract includes feasibility studies, preliminary design, tender preparation and support followed by project management of detailed design and construction supervision once the main contractor is appointed. The main construction contract will be tendered within the next 12 months. However, the scope and number of packages will not be clear until after Parsons finishes its early designs.

The project includes construction of two deep wastewater tunnels and associated link sewers. The total combined length of the tunnels will be 75 km, reaching depths of up to 90 m and supported by 135 km of link sewers and key pumping stations. Visit https://www.wam.ae/en/news/emirates/1395295489854.html and https://www.parsons.com. 20/16.



Permalink

United Arab Emirates, Abu Dhabi - ae/17

Metro rail

Invitation for expressions of interest with outline proposals, deadline 13.04.2009, for consultancy services for concept design, feasibility study, design review and preliminary engineering, preparation of tender documents, and awarding and formalizing construction contracts for Abu Dhabi Metro Rail Study. Contact Department of Transport www.transportabudhabi.ae, or download 160 pp pdf file of development plan at www.upc.gov.ae. Consultants for the Surface Transport Master Plan are Mott MacDonald www.mottmac.com and Steer Davies Gleave www.steerdaviesgleave.com. 09/09.