Qatar,
Al Wakrah
- qt/15
Sewer
Closing Date:
07.04.2020 (Tender Closed)
Invitation to tender, deadline 07/04/2020, for the design and build contract for Wakrah and Wukair drainage tunnel. The contract for Drainage Tunnel (DT) is approximately 13 km in length and is in the vicinity of the New Orbital Highway and Truck Route and terminates at the Al Wakrah & Al Wukair Sewage Treatment Plant (STP), which will be under construction simultaneously. The duration of the contract is 1260 calendar days from the Commencement Date, together with 400 calendar days of Maintenance Period from the date of issuance of the Completion Certificate. Contact Public Works Authority Ashghal, Doha, Qatar, fax (+974) 44950777, email esd.tenders@ashghal.gov.qa. For tender information please click here. Ref.n. PWA/GTC/085/2019. 14/20.
Postponed from 07/04/20 to 28/04/20 the deadline of the invitation to tender for the design and build contract for Wakrah and Wukair drainage tunnel. The contract for Drainage Tunnel (DT) is approximately 13 km in length and is in the vicinity of the New Orbital Highway and Truck Route and terminates at the Al Wakrah & Al Wukair Sewage Treatment Plant (STP), which will be under construction simultaneously. The duration of the contract is 1260 calendar days from the Commencement Date, together with 400 calendar days of Maintenance Period from the date of issuance of the Completion Certificate. Contact Public Works Authority Ashghal, Doha, Qatar, fax (+974) 44950777, email esd.tenders@ashghal.gov.qa. For tender information please click here. Ref.n. PWA/GTC/085/2019. 17/20.
Qatar,
Doha
- qt/14
Sewer
Hotchief Solutions Middle East Qatar, Al Sraiya Strabag for Roads and Infrastructure and Petroserv Ltd signed the EUR256 million contract (QR1,065,765,88) for design and construction of the central section of the new sewerage network under the capital of Qatar. The client is the Public Works Authority (ASHGHAL).
The construction contract is part of an extensive refurbishment and expansion of the overloaded sewerage system in the historic south of Doha. The system, which serves an area of 680 sq km, is required as the result of rapid population growth. The overall project includes several smaller connections to the existing sewer system.
For constructing the 14.7 km-long tunnel, two TBMs will be used. After installation of the tunnel outer shell an inner lining will be added to protect the concrete from aggressive gases by means of an HDPE membrane, thus ensuring a project life of 100 years. The sewer tunnel will have an interior diameter of 4.5 m. In addition to the tunnel, shafts up to 45 m-deep will be built, some of which will serve as connectors to other IDRIS construction contracts. The joint venture is responsible for the execution planning for this demanding project which is scheduled to be completed by the beginning of 2019, a construction period of 45 months. Visit http://www.hochtief.com, http://www.strabag.com and http://www.petroserv-limited.com/. 20/15.
The Qatar Public Works Authority has awarded two contracts for the design and construction of two sewage tunnels in Doha to Bouygues Travaux Publics (a subsidiary of Bouygues Construction), in partnership with a local contractor UrbaCon Trading & Contracting. The two contracts are worth approximately €550 million.
The north section (MTS01) will be 16 km long and 3 m wide. The south section (MTS03) will be 14 km long and 4.5 m wide. End of work is scheduled for 2019. These contracts are part of the strategic project for sewage collection, pumping and treatment services in the south of Doha, known as “IDRIS” (Inner Doha Resewerage Implementation Strategy). Visit http://www.ashghal.gov.qa/ and http://www.bouygues-construction.com. 41/15.
Qatar,
Doha
- qt/13
Metro
The Doha Metro is part of the EUR27bn Qatar Integrated Rail Programme (QIRP), which also includes: the EUR2.13 bn Lusail City LRT, 38.8 km with 36 stations to be completed in 2016; the EUR2.1 bn West Bay people-mover, a 10 km dual-track, single-bore tunnel with 19 underground stations, linking the new Doha Convention Centre with the West Bay area; a high-speed passenger line; and a 340 km freight rail line.
Qatar Railways Company signed five contracts at a total cost of EUR314 million to signal the beginning of the phase 1 of the state’s integrated railways project within the first quarter of 2013.The Qatar integrated railways project will incorporate a metro system and a long-distance passenger travel and freight transport network.
The US firm Jacobs Engineering Group secured the contract to manage the metro's Red Line; the consortium Louis Berger (USA)/Egis Rail (France) secured the contract to manage the Gold Line and main stations; and Hill International Company has received a four-year EUR9.7 million contract to provide project management services in connection with construction of the Green Line/Phase 1; Porr (Austria)-Saudi Binladin Group (SBG)-HBK Contracting (local) consortium won a EUR61 million contract to provide site facilities, civil structures and remove utilities in preparation for the tunnelling and major stations packages; and Britain's Lloyd's Register won a contract for independent safety assessment worth EUR11.7 m.
Phase 1 of the QIRP involves construction of 76.3 km including 53.3 km of underground lines in single bore tunnels and 26 stations, expected to be complete by October 2019 and to be operational for FIFA World Cup 2022. The contract to undertake design on tunnelling work will be awarded in the first quarter of 2013, Click here for the network map and here for Qatar Railways Company presentation. Click here for more on the project. 41/12.
The JV led by Impregilo SpA (Italy) and including SK Engineering & Construction Co Ltd (Korea) and Galfar AI Misnad Engineering & Contracting W.L.L. (Oman) secured the EUR1.73 billion contract for Design and Build Package 1 of Red Line North Underground of the Doha Metro. EUR630 million will be spent on the metro design phase with EUR1.1billion budgeted for preparatory works, electromechanical systems, and architectural works. Tender n. RTC/038/2012.
The JV QDVC (51 percent Qatari Diar Real Estate Investment Company and 49 percent Vinci Construction Grands Projets) - GS Engineering & Construction Corp (South Korea) - AI-Darwish Engineering W.L.L. (Qatar) secured the EUR1.69 billion contract for Design and Build Package 2 of Red Line South Underground. It will build the underground sections of the 12 km-long Red Line South between Doha city centre and the airport. Tender n. RTC/039/2012.
The JV Porr Bau GmbH (Austria) - Saudi Binladin Group Company Ltd - Hamad Bin Khalid Contracting Co. W.L.L. (Qatar) secured the EUR1.69 billion contract for Design and Build Package 4 of Green Line Underground of the Doha Metro. It will build the 15 km-long underground section for the Green Line, which runs north-south through the city. Tender n. RTC/041/2012.
The JV OHL Group (Spain), Samsung C & T (South Korea) and Qatar Building Company have won a contract worth EUR845.27 million to build the Mshaireb and Education City Stations of the Doha Metro. Tender n. RTC/042/2012. Visit www.qr.com.qa. 23/13.
The FCC-led consortium, which comprises Archirodon (Greece), Yuksel (Turkey) and Petroserv Ltd (Qatar) has won the EUR506 million contract to build a section of Doha Metro red line. The execution period is 31 months. The metro is due for completion in 2019. The contract includes building three elevated stations (Barwa Village, Al Wakrah and Qatar Economic Zone) and a 6.97-km section, plus tunnelizing the road at the entrance to Al Wakrah. The total budget for the Doha Metro project exceeds EUR20 billion. Visit http://www.fcc.es/fccweb/actualidad/CSCP088630_EN.html?iddc=CSCP088630_EN. 13/14.
The JV composed of Greece’s Aktor SA (32 percent), India’s Larsen &Toubro, Turkey’s Yapi Merkezi (Yapi Merkezi Insaat ve Sanayi Anonim Sirketi) and STFA (Sezai Turkes Feyzi Akkaya Marine Construction) and Qatar’s Al Jaber Engineering signed the EUR3.2 billion contract (RTC/040/2012) for the design and construction of the project “Gold Line Underground” in Doha, Qatar. Gold Line will traverses Doha from east to west and will connect the airport’s northern part with Souq Waqif, Msheireb, Bin Mahmoud, Al Sadd and Al Waab. The project includes 32km of 6 m-diameter bored tunnelling lined with approximately 128,000 segments, six TBMs utilized simultaneously, 13 underground stations fitted out with high-end finishes and state of the art mechanical, engineering and plumbing (MEP) systems, 2.5 million cu m of excavations for the stations and one million cu m of concreting. The project also includes traffic and utilities diversions. The project duration is 54 months and is due to be completed August, 2018. Visit http://www.qr.com.qa/English/Procurement/Pages/Details.aspx?ItemID=RTC/040/2012. 24/14.
Qatar Rail has awarded the Manufacture, Supply & Install (MSI) and Systems Maintenance (SM) contract for Systems, Rolling Stock and Trackwork on Phase 1 of the Doha metro to Mitsubishi Heavy Industries Ltd (leader) - Mitsubishi Corporation - Hitachi Ltd – Kinki Sharyo Co Ltd – Thales Canada Inc. Consortium. The consortium will supply the power distribution system, platform screen doors, tracks and tunnel ventilation work, and will also undertake overall project management and system integration. The contract includes maximum 20-year maintenance services for the metro system after its completion. Visit http://www.mitsubishicorp.com/jp/en/pr/archive/2015/html/0000026741.html and http://www.qr.com.qa. Ref.n. RTC/075/2013. 09/15.
Romania,
Oltenia & Banat
- ro/24
Railway
Closing Date:
03.07.2023 (Tender Closed)
Open invitation to tender, deadline 03/07/2023, for the design and rehabilitation works of the Craiova-Drobeta Turnu Severin-CaransebeÈ™ railway, part of the East/East-Mediterranean corridor, Lot 3 Igiroasa (Cap Y) – Drobeta Turnu Severin (Cap X), km 331 +000- km 362+632. The lot includes the new twin-tube Balota tunnel, length 6189 m to be built by TBM. Click here for the tender documents. Value of the contract will be EUR680.02 million (RON3.38 bn), excluding VAT. Duration of contract is 135 months. Contact Compania Nationala de Cai Ferate CFR SA, attn Mirela Toma, Bucarest, tel +40 372843221, fax +40 213192401, email mirela.toma@cfr.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=329245-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=307503-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=290983-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=222472-2023. Ref.n. 17.A/1/425/15.03.2023. 22/23.
Open invitation to tender, deadline 03/07/2023, for the design and rehabilitation works for Lot 4 and Lot 5 of the Craiova-Drobeta Turnu Severin-CaransebeÈ™ railway, part of the East/East-Mediterranean corridor.
- Lot 4, Drobeta Turnu Severin (Cap X) - Cap X Baile Herculane, km 362+632 -km 404+250, including the following 7 tunnels Motu (150m), Baba (83 m), Vir (93 m), Virciorova (92 m), Bahna (115 m), Alion (199 m) and Tufari (399 m) to be modernizated. Value of contract EUR323.15 million (RON1.61 bn), excluding VAT. Duration of contract 135 months.
- Lot 5, Cap X Baile Herculane - Cap X Po Nou Poarta, km 404+250- km 436+887, including the Rachitoberg tunnel (496 m) to be modernizated and the new cut&cover Poarta I tunnel (1279 m). Value of contract EUR321.26 million (RON1.60 bn), excluding VAT. Duration of contract 123 months.
Click here for tender documents. Contact Compania Nationala de Cai Ferate CFR SA, attn Mariana Ilie, Bucarest, tel +40 372843255, fax +40 213192401, email mariana.i.ilie@cfr.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 308027-2023. Ref.n. 17.A/1/671/26.04.2023. 22/23.
Open invitation to tender, deadline 26/06/2023, for the design and rehabilitation works for the Craiova-Drobeta Turnu Severin-CaransebeÈ™ railway, part of the East/East-Mediterranean corridor, Lot 6 Cap X Po Nou Poarta - Caransebes, km 436 +887- km 474+046,53. The lot includes the 2 new cut&cover tunnels Poarta II (500 m) and Poarta III (305 m) and the tunnels Fenes (271 m) and Tampa (268 m) to be upgraded and modernised. Click here for the tender documents. Value of the contract is EUR293.23 million (RON1.46bn), excluding VAT. Duration of the contract will be 135 months. Contact Compania Nationala de Cai Ferate CFR SA, attn Oana Otilia Mandras, Bucarest, tel +40 91122148, fax +40 213192401, email Oana.Mandras@cfr.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=268887-2023. Ref.n. 17.A/1/663/25.04.2023. 22/23.
Postponed to 25/09/2023 the deadline of the open invitation to tender for the design and rehabilitation works for Lot 4 and Lot 5 of the Craiova-Drobeta Turnu Severin-CaransebeÈ™ railway, part of the East/East-Mediterranean corridor.
Lot 4, Drobeta Turnu Severin (Cap X) - Cap X Baile Herculane, km 362+632 -km 404+250, including the following 7 tunnels Motu (150m), Baba (83 m), Vir (93 m), Virciorova (92 m), Bahna (115 m), Alion (199 m) and Tufari (399 m) to be modernizated. Value of contract EUR 323.15 million (RON1.61 bn), excluding VAT. Duration of contract 135 months.
Lot 5, Cap X Baile Herculane - Cap X Po Nou Poarta, km 404+250- km 436+887, including the Rachitoberg tunnel (496 m) to be modernizated and the new cut&cover Poarta I tunnel (1279 m). Value of contract EUR321.26 million (RON1.60 bn), excluding VAT. Duration of contract 123 months.
Click here for tender documents. Contact Compania Nationala de Cai Ferate CFR SA, attn Mariana Ilie, Bucarest, tel +40 372843255, fax +40 213192401, email
mariana.i.ilie@cfr.ro. Visit
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=535564-2023,
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=517207-2023,
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=457761-2023 and
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=359592-2023. Ref.n. 17.A/1/671/26.04.2023. 38/23.
Postponed to 25/09/2023 the deadline of the open invitation to tender for the design and rehabilitation works of the Craiova-Drobeta Turnu Severin-CaransebeÈ™ railway, part of the East/East-Mediterranean corridor, Lot 3 Igiroasa (Cap Y) – Drobeta Turnu Severin (Cap X), km 331 +000- km 362+632. The lot includes the new twin-tube Balota tunnel, length 6189 m to be built by TBM. Click here for the tender documents. Value of the contract will be EUR680.02 million (RON3.38 bn), excluding VAT. Duration of contract is 135 months. Contact Compania Nationala de Cai Ferate CFR SA, attn Mirela Toma, Bucarest, tel +40 372843221, fax +40 213192401, email mirela.toma@cfr.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 534379-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=519247-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=361444-2023. Ref.n. 17.A/1/425/15.03.2023. 38/23.
The contract for the design and rehabilitation works of the Igiroasa (Cap Y) - Drobeta Turnu Severin (Cap X) section, km 331 +000- km 362+632 (Lot 3) of the Craiova-Drobeta Turnu Severin-CaransebeÈ™ railway has been not awarded. Click here for further information. Contact Compania Nationala de Cai Ferate CFR SA, attn Mirela Toma, Bucarest, tel +40 372843221, fax +40 213192401, email mirela.toma@cfr.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=589269-2023. Ref.n. 17.A/1/425/15.03.2023. 40/23.
The contract for the design and rehabilitation works of Drobeta Turnu Severin (Cap X) - Cap X Baile Herculane section, km 362+632 -km 404+250 (Lot 4) and of Cap X Baile Herculane - Cap X Po Nou Poarta section, km 404+250- km 436+887 (Lot 5) of the Craiova-Drobeta Turnu Severin-CaransebeÈ™ railway has not been awarded
Click here for further information. Contact Compania Nationala de Cai Ferate CFR SA, attn Mariana Ilie, Bucarest, tel +40 372843255, fax +40 213192401, email mariana.i.ilie@cfr.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=588198-2023. Ref.n. 17.A/1/671/26.04.2023. 40/23.
The contract for the design and rehabilitation works of the section Cap X Po Nou Poarta - Caransebes, km 436 +887- km 474+046,53 (Lot 6) on the Craiova-Drobeta Turnu Severin-CaransebeÈ™ railway has been not awarded. For further information click here. Contact Compania Nationala de Cai Ferate CFR SA, attn Oana Otilia Mandras, Bucarest, tel +40 91122148, fax +40 213192401, email Oana.Mandras@cfr.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=586388-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=549034-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=517126-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=420966-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=394592-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=357306-2023. Ref.n. 17.A/1/663/25.04.2023. 40/23.
Romania,
Bucharest
- ro/23
Motorway
Closing Date:
09.06.2022 (Tender Closed)
Open invitation to tender, deadline 09/06/2022, for the design and construction of the Lugoj-Deva section, motorway A1, Lot 2 (km27 + 620 – km 56 + 220): sub-section E and for the completing of the 9.13 km sub-section D, including a 2.13 km tunnel. Click here for tender documents. Value of the contract will be EUR524.37 million (RON2.59 bn), excluding VAT: Duration of the contract is 117 months.Contact Nationala de Admnistrare a Infrastructurii Rutiere SA, attn Horia Mihai Nicolae, Bucarest, tel +40 212643299, fax +40 212643298, email achizitiipublicebuget@andnet.ro. Visit
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=216992-2022 . Ref.n. 16054368/2022/2983/S/12. 17/22.
The Joint Venture Spedition Umb from Bacau, SC SA & PE Construct Srl from Bacau, Tehnostrade Srl from Bacau and Euro-Asfalt from Sarajevo have secured the EUR 372.03 million (RON1.83 bn) contract, excluding VAT, for the design and construction of the Lugoj-Deva section, motorway A1, Lot 2 (km27 + 620 – km 56 + 220): sub-section E and for the completing of the 9.13 km sub-section D, including a 2.13 km tunnel. Contact Nationala de Admnistrare a Infrastructurii Rutiere SA, attn Horia Mihai Nicolae, Bucarest, tel +40 212643299, fax +40 212643298, email achizitiipublicebuget@andnet.ro. Visit
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=600164-2022. Ref.n. 16054368/2022/2983/S/12. 44/22.
Romania,
Transylvania
- ro/22
Metro
Prior information notice for the design and execution of Infrastructure works, Traffic automation, Power supply connection related to the project of the Giluu - Floresti - Cluj-Napoca - Baciu - Apahida - Jucu - Bonțida metro/train - stage I of the Cluj fast metropolitan transport system. Estimated date of publication of the contract notice will be 11/03/2022. The value of the contract is EUR 1.48 bn (RON7.33 bn), excluding VAT. Contact Municipiul Cluj-Napoca from Cluj-Napoca, tel +40 264596030, fax +40 264431575, email achizitiipublice@primariaclujnapoca.ro and/or Comuna Floresti, attn Marius Manu, Floresti, tel +40 0264265101, email primaria@floresticluj.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=086324-2022. Ref. n. 4305857-2022-19. 07/22.
Romania-Cluj-Napoca: Underground railway works
This notice is for prior information only
Legal Basis:
Directive 2014/24/EU
Section I: Contracting authority
I.1)Name and addresses
Official name: Municipiul Cluj-Napoca
National registration number: 4305857
Postal address: Strada Moţilor, Nr. 1-3
Town: Cluj-Napoca
NUTS code: RO113 Cluj
Postal code: 400001
Country: Romania
Contact person: VIRGIL PORUTIU, RAMONA GABOR , LUCIA LUPEA, MARIA OPRIS
E-mail:
achizitiipublice@primariaclujnapoca.ro
Telephone: +40 264596030
Fax: +40 264431575
Internet address(es):
Main address:
www.primariaclujnapoca.ro
Address of the buyer profile:
www.primariaclujnapoca.ro
I.1)Name and addresses
Official name: COMUNA FLORESTI
National registration number: 4485391
Postal address: Strada: AVRAM IANCU , nr. 170, Sector: -, Judet: Cluj, Localitate: Floresti, Cod postal: 407208
Town: Floresti
NUTS code: RO113 Cluj
Postal code: 407208
Country: Romania
Contact person: MARIUS MANU
E-mail:
primaria@floresticluj.ro
Telephone: +40 0264265101
Internet address(es):
Main address:
www.floresticluj.ro
I.2)Information about joint procurement
The contract involves joint procurement
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at:
Additional information can be obtained from the abovementioned address
I.4)Type of the contracting authority
Regional or local authority
I.5)Main activity
General public services
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Proiectare și Execuție lucrări de Infrastructură (structură de rezistență, cale de rulare, finisaje, sisteme de instalații), Automatizare trafic, Racordare alimentare cu energie electrică) aferente obiectivului de investiție Magistrala I de metrou Cluj
Reference number: 4305857-2022-19
II.1.2)Main CPV code
45234122 Underground railway works
II.1.3)Type of contract
Works
II.1.4)Short description:
Proiectare și Execuție lucrări de Infrastructură (structură de rezistență, cale de rulare, finisaje, sisteme de instalații), Automatizare trafic, Racordare alimentare cu energie electrică aferente obiectivului de investiție
„Tren metropolitan Gilău – FloreÈ™ti – Cluj-Napoca – Baciu – Apahida – Jucu – BonÈ›ida – etapa I a sistemului de transport metropolitan rapid Cluj: Magistrala I de metrou È™i tren metropolitan, inclusiv legătura dintre acestea. Componenta 1. Magistrala I de metrou Cluj”
II.1.5)Estimated total value
Value excluding VAT: 7 331 922 737.00 RON
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: RO113 Cluj
Main site or place of performance:
MUNICIPIUL CLUJ-NAPOCA si COMUNA FLORESTI, JUD CLUJ
II.2.4)Description of the procurement:
Proiectare și Execuție lucrări de Infrastructură (structură de rezistență, cale de rulare, finisaje, sisteme de instalații), Automatizare trafic, Racordare alimentare cu energie electrică aferente obiectivului de investiție
„Tren metropolitan Gilău – FloreÈ™ti – Cluj-Napoca – Baciu – Apahida – Jucu – BonÈ›ida – etapa I a sistemului de transport metropolitan rapid Cluj: Magistrala I de metrou È™i tren metropolitan, inclusiv legătura dintre acestea. Componenta 1. Magistrala I de metrou Cluj”
II.2.14)Additional information
II.3)Estimated date of publication of contract notice:
11/03/2022
Section IV: Procedure
IV.1)Description
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: yes
Section VI: Complementary information
VI.3)Additional information:
Documentatia de atribuire care face obiectul acestei proceduri va fi pusa la dispozitie celor interesati prin intermediul anuntului de participare.
VI.5)Date of dispatch of this notice:
15/02/2022
Open invitation to tender, deadline 24/06/2022, for the design and execution of infrastructure works, traffic automation and power supply connection. The project is the Giluu - Floresti - Cluj-Napoca - Baciu - Apahida - Jucu - Bonțida metro/train - stage I of the Cluj fast metropolitan transport system. For tender documents, please click here. The value of the contract is EUR1.35 bn (RON6.67 bn), excluding VAT. Duration of the contract will be 96 months. Contact Municipiul Cluj-Napoca from Cluj-Napoca, tel +40 264596030, fax +40 264431575, email achizitiipublice@primariaclujnapoca.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=211218-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=139764-2022. Ref. n. 4305857-2022-19. 17/22.
Romania-Cluj-Napoca: Underground railway works
2022/S 079-211218
Notice for changes or additional information
Legal Basis:
Directive 2014/24/EU
Section I: Contracting authority/entity
I.1)Name and addresses
Official name: Municipiul Cluj-Napoca
National registration number: 4305857
Postal address: Strada: Moţilor, nr. 1-3
Town: Cluj-Napoca
NUTS code:
RO113 Cluj
Postal code: 400001
Country: Romania
Contact person: VIRGIL PORUTIU, RAMONA GABOR, LUCIA LUPEA, MARIA OPRIS
E-mail:
achizitiipublice@primariaclujnapoca.ro
Telephone: +40 264596030
Fax: +40 264431575
Internet address(es):
Main address:
www.primariaclujnapoca.ro
Address of the buyer profile:
www.e-licitatie.ro
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Proiectare și Execuție lucrări de Infrastructură (structură de rezistență, cale de rulare, finisaje, sisteme de instalații), Automatizare trafic, Racordare alimentare cu energie electrică aferente obiectivului de investiție Magistrala I de metrou Cluj
Reference number: 4305857-2022-19
II.1.2)Main CPV code
45234122 Underground railway works
II.1.3)Type of contract
Works
Section VI: Complementary information
VI.6)Original notice reference
Section VII: Changes
VII.1)Information to be changed or added
VII.1.2)Text to be corrected in the original notice
Section number: IV.2.2
Instead of:
Date: 09/05/2022
Read:
Date: 24/06/2022
Section number: IV.2.7
Instead of:
Date: 09/05/2022
Read:
Date: 24/06/2022
Section number: IV.2.6
Instead of:
Date: 09/03/2023
Read:
Date: 24/04/2023
VII.2)Other additional information:
Postponed to 22/09/2022 the deadline of the open invitation to tender for the design and execution of infrastructure works, traffic automation and power supply connection. The project is the Giluu - Floresti - Cluj-Napoca - Baciu - Apahida - Jucu - Bonțida metro/train - stage I of the Cluj fast metropolitan transport system. For tender documents, please click here. The value of the contract is EUR 1.35 bn (RON6.67 bn), excluding VAT. Duration of the contract will be 96 months. Contact Municipiul Cluj-Napoca from Cluj-Napoca, tel +40 264596030, fax +40 264431575, email achizitiipublice@primariaclujnapoca.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=463331-2022, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=343209-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=317413-2022. Ref. n. 4305857-2022-19. 37/22.
Postponed from 22/09/2022 to 28/10/2022 the deadline of the open invitation to tender for the design and execution of infrastructure works, traffic automation and power supply connection. The project is the Giluu - Floresti - Cluj-Napoca - Baciu - Apahida - Jucu - Bonțida metro/train - stage I of the Cluj fast metropolitan transport system. For tender documents, please click here. The value of the contract is EUR 1.35 bn (RON6.67 bn), excluding VAT. Duration of the contract will be 96 months. Contact Municipiul Cluj-Napoca from Cluj-Napoca, tel +40 264596030, fax +40 264431575, email achizitiipublice@primariaclujnapoca.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=522850-2022. Ref. n. 4305857-2022-19. 39/22.
The Joint Venture Gulermak Agır Sanayi Insaat ve Taahhut AS from Ankara, S.C. Alstom Transport SA from Bucurest, Gulermak Spolka z Ograniczna Odpowiedzialnoscia from Warsaw, Arcada Company from Galati have secured the EUR1.82 bn (RON9.06 bn) contract, excluding VAT, for the design and execution of infrastructure works, traffic automation and power supply connection. The project is the Giluu - Floresti - Cluj-Napoca - Baciu - Apahida - Jucu - Bonțida metro/train - stage I of the Cluj fast metropolitan transport system. Contact Municipiul Cluj-Napoca, attn Virgil Porutiu, Ramna Gabor, Lucia Lupea, Maria Opris, Cluj-Napoca, tel +40 264596030, fax +40 264431575, email achizitiipublice@primariaclujnapoca.ro and Comuna Floresti, attn Marius Manu, Floresti, tel +40 0264265101, fax +40 0264265101, email primaria@floresticluj.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=323158-2023. Ref. n. 4305857-2022-19. 22/23.
Romania,
Transylvania
- ro/21
Motorway
Closing Date:
11.01.2021 (Tender Closed)
Restricted invitation to tender, deadline 11/01/2021, for the design and construction of the Brașov-Targu Mureș-Cluj-Oradea motorway, section 3B: Mihaiești-Suplacu de Barcau, subsection 3B3: Porta Salajului-Zalau, km 25 + 500-km 40 + 637, including 2.89km twin-tube tunnel Meseș and subsection 3B4: Zalau-Nusfalau km 40 + 660 (km 40 + 637 3B3) -km 66 + 500. Duration of the contract is 108 months. The value of the contract is EUR916.12 million (RON4.46 bn), excluding VAT. Contact CNAIR (Compania Naționala de Administrare a Infrastructurii Rutiere), attn Valentin Florin Trifan, Bucarest, tel +40 212643299, fax +40 212643298, email achizitiipublicebuget@andnet.ro For further information on the tender click here and here. Ref n. 16054368/2020/1999/S/10. 47/20.
The estimated date of dispatch of invitations to tender to selected candidates for the design and construction of the Brașov-Targu Mureș-Cluj-Oradea motorway, section 3B, has been postponed from 19/02/2021 to 29/03/2021. Contact CNAIR (Compania Naționala de Administrare a Infrastructurii Rutiere), attn Valentin Florin Trifan, Bucarest, tel +40 212643299, fax +40 212643298, email achizitiipublicebuget@andnet.ro. For further information on the tender click here and here. Ref n. 16054368/2020/1999/S/10. 05/21.
Not awarded the contract for the restricted invitation to tender, deadline 29/03/2021, for the design and construction of the Brașov-Targu Mureș-Cluj-Oradea motorway, section 3B: Mihaiești-Suplacu de Barcau, subsection 3B3: Porta Salajului-Zalau, km 25 + 500-km 40 + 637, including 2.89km twin-tube tunnel Meseș and subsection 3B4: Zalau-Nusfalau km 40 + 660 (km 40 + 637 3B3) -km 66 + 500. Contact CNAIR (Compania Naționala de Administrare a Infrastructurii Rutiere), attn Valentin Florin Trifan, Bucarest, tel +40 212643299, fax +40 212643298, email achizitiipublicebuget@andnet.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=202525-2023. Ref n. 16054368/2020/1999/S/10. 14/23.
Romania,
Muntenia
- ro/20
Motorway
Closing Date:
04.06.2019 (Tender Closed)
Open invitation to tender, deadline 04.06.2019, for the
design and construction of the 9.86 km Tigveni- Curtea de Arges, Section4 (km
81 + 900 - km 91 + 761), on the Sibiu-Pitest motorway, including the 1.35 Momaia
tunnel. Duration of the contract is 120 months. The value of the contract is EUR420
million (LEU2 bn), excluding VAT. Contact Compania Naționala de
Administrare a Infrastructurii Rutiere SA, attn Horia Nicolae, Bucarest, tel
+40 212643299, fax +40 212643298, email laura.axente@andnet.ro.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=111621-2019
and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=218011-2019.
Ref n. 16054368/2019/2219S10. 20/19.
Postponed to 23.07.2019 the deadline of the open invitation to tender for the design and construction of the 9.86 km Tigveni- Curtea de Arges, Section4 (km 81 + 900 - km 91 + 761), on the Sibiu-Pitest motorway, including the 1.35 Momaia tunnel. Duration of the contract is 120 months.
The value of the contract is EUR420 million (LEU2 bn), excluding VAT.
Contact Compania Nationala de Administrare a Infrastructurii Rutiere SA, attn Horia Nicolae, Bucarest, tel +40 212643299, fax +40 212643298, email laura.axente@andnet.ro. Visit
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=299640-2019
and
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=262491-2019.
Ref n. 16054368/2019/2219S10. 26/19.
The following 10 companies/associations have submitted offers for the design and construction of the 9.86 km Tigveni- Curtea de Arges, Section4 (km 81 + 900 - km 91 + 761), on the Sibiu-Pitest motorway, including the 1.35 Momaia tunnel:
- Aktor Technical Societe Anonyme (Aktor SA);
- Asocierea Alsim Alarko Sanayi Tesisleri Ve Ticaret AS - Makyol Insaat Sanayi Turizm Ve Ticaret AS;
- China Railway 14th Bureau Group CO, LTD;
- Asocierea IC Ictas Insaat Sanayi Ve Ticaret AS - Constructii SA;
- Impresa Pizzarotti & C SpA;
- Asocierea Kalyon Insaat Sanayi Ve Ticaret AS - Met-Gun Insaat Taahhut Ve Ticaret AS;
- Mapa Insaat Ve Ticaret AS;
- Porr Construct SRL;
- Strabag SRL;
- Asocierea Rizzani de Eccher SpA - Tirrena Scavi SpA - Ozgun Insaat Taahhut Sanayi Ve Ticaret Limited Sirketi.
The value of the contract is EUR420 million (LEU2 bn), excluding VAT. The duration of the contract is 60 months: 16 months for the design and 44 months for the construction. Contact Compania Naționala de Administrare a Infrastructurii Rutiere SA, attn Horia Nicolae, Bucarest, tel +40 212643299, fax +40 212643298, email laura.axente@andnet.ro. Visit http://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/10-oferte-pentru-proiectarea-%C8%99i-execu%C8%9Bia-sec%C8%9Biunii-4.
Ref n. 16054368/2019/2219S10. 36/19.
Restricted invitation to tender, deadline 23/11/2020, for the design and construction of the 37.4 km Cornetu - Tigveni , Section 3 (km 44 + 500 - km 81 +900) on the Sibiu-Pitesti motorway, including a 1.7km tunnel. Duration of the contract is 137 months. The value of the contract is EUR1.19 bn (RON5.81 bn), excluding VAT. Contact CNAIR (Compania Naționala de Administrare a Infrastructurii Rutiere), attn Valentin Florin Trifan, Bucarest, tel +40 212643299, fax +40 212643298, email achizitiipublicebuget@andnet.ro. For bid documents click here and for further information on the tender here, here, here and here. Ref n. 16054368/2020/2002/S10. 46/20.
Postponed from 23/11/2020 to 27/11/2020 the deadline of the restricted invitation to tender for the design and construction of the 37.4 km Cornetu - Tigveni , Section 3 (km 44 + 500 - km 81 +900) on the Sibiu-Pitesti motorway, including a 1.7km tunnel. Duration of the contract is 137 months. The value of the contract is EUR1.19 bn (RON5.81 bn), excluding VAT. Contact CNAIR (Compania Naționala de Administrare a Infrastructurii Rutiere), attn Valentin Florin Trifan, Bucarest, tel +40 212643299, fax +40 212643298, email achizitiipublicebuget@andnet.ro. For further information on the tender click here. Ref n. 16054368/2020/2002/S10. 47/20.
Restricted invitation to tender, deadline 29/01/2021, for the design and construction of the 30.35 km Boita - Cornetu , Section 2 (km 14 + 150 - km 44 +500) on the Sibiu-Pitesti motorway, including 7 tunnels which will be 4335 m in total. Duration of the contract is 148 months. The value of the contract is EUR1.08 bn (RON5.27 bn), excluding VAT. Contact CNAIR (Compania Naționala de Administrare a Infrastructurii Rutiere), attn Valentin Florin Trifan, Bucarest, tel +40 212643299, fax +40 212643298, email achizitiipublicebuget@andnet.ro. For bid documents click here and for further information on the tender here. Ref n. 16054368/2020/2021/S/10. 50/20.
Postponed from 29/01/2021 to 16/02/2021 the deadline of the restricted invitation to tender for the design and construction of the 30.35 km Boita - Cornetu , Section 2 (km 14 + 150 - km 44 +500) on the Sibiu-Pitesti motorway, including 7 tunnels which will be 4335 m in total. Duration of the contract is 148 months. The value of the contract is EUR1.08 bn (RON5.27 bn), excluding VAT. Contact CNAIR (Compania Naționala de Administrare a Infrastructurii Rutiere), attn Valentin Florin Trifan, Bucarest, tel +40 212643299, fax +40 212643298, email achizitiipublicebuget@andnet.ro. For tender documents click here and for further information on the tender here. Selected companies will be invited to send offers by 26/03/2021 instead of by 09/03/2021. Ref n. 16054368/2020/2021/S/10. 05/21.
Porr Construct from Bucharest have secured the EUR 339.47 million (RON1.68 bn) contract, excluding VAT, for the design and construction of the 9.86 km Tigveni- Curtea de Arges, Section4 (km 81 + 900 - km 91 + 761), on the Sibiu-Pitest motorway, including the 1.35 Momaia tunnel. Contact Compania Naționala de Administrare a Infrastructurii Rutiere SA, attn Horia Nicolae, Bucarest, tel +40 212643299, fax +40 212643298, email achizitiipublicebuget@andnet.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=065300-2022. Ref n. 16054368/2019/2219S10. 06/22.
The Joint venture Mapa Insaat ve Ticaret Anonim Sirketi (Ankara) and Cengiz Insaat Sanayi ve Ticaret AS (İstanbul) secured the EUR 858.63 million (ROI4.25 bn) contract, excluding VAT, for the design and construction of the 30.35 km Boita - Cornetu , Section 2 (km 14 + 150 - km 44 +500) on the Sibiu-Pitesti motorway, including 7 tunnels which will be 4335 m in total. Contact CNAIR (Compania Naționala de Administrare a Infrastructurii Rutiere), attn Valentin Florin Trifan, Bucarest, tel +40 212643299, fax +40 212643298, email achizitiipublicebuget@andnet.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=097159-2022. Ref n. 16054368/2020/2021/S/10. 08/22.
The consortium composed of Webuild (leader with a 90% stake) and the local partner Tancrad (10%) secured a contract worth more than EUR 1 billion to build Lot 3 of the Sibiu-Pitesti Highway in Romania. Lot 3 is the most complex part of the highway because it will cross the Carpathian Mountains between Cornetu and Tigveni for 37.4 km, of which 12.5 km will include bridges and viaducts, and the 1.7 km long Poiana twin tunnel.
The contract will be 85% financed by European Union funds and the remaining 15% by state funds. In addition to the tunnel, bridges and viaducts, Lot 3 includes the design and construction of more than 23 km of a double-lane highway, two interchanges at Valeni and Cornetu, 18 km of consolidation works, the construction of a maintenance and control centre, and work to preserve the environment. There will also be an animal crossing at Olt River. It will help reduce traffic congestion between Cornetu and Tigveni by providing an alternative route to national roads.
Contact CNAIR (Compania Naționala de Administrare a Infrastructurii Rutiere), Bucarest, tel +40 212643299, fax +40 212643298, email achizitiipublicebuget@andnet.ro. Visit https://www.webuildgroup.com/en/. Ref n. 16054368/2020/2002/S10. 19/22.