Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Greece

Greece, Wester Macedonia - gr/35

Hydropower

Open call for bids, deadline 5th September, 2007 for construction of two tunnels, one above the other approx. 80 metres apart, to reinforce the right embankment of the future Iliarion dam in Kozani. The ground is karstic geology and marble full of cavities, which need to be filled up by grouting from inside the upper and lower tunnels. The top tunnel is about 600 m long, whereof 475 metres for grouting. Its ceiling only will be concreted. The bottom tunnel is approx. 650 m long, whereof 420 metres for grouting. It will be concrete lined all around its cross-section. Their width is 4.40 m and their height 4.70 metres. The drill/blast method will be used. The contract is due to be awarded shortly after bid submission and assessment to commence work as soon as possible since these are preparatory works for the dam. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=154763-2007, OJ S 126, or contact Dimosia Epicheirisi Ilektrismoy, Athens, fax +30 2105220075. 31/07.



Permalink

Greece, Western Greece - gr/34

Water

Elter pocketed a EUR17.9 million contract from the Ministry of land planning, environment and public works to build the Achyra dam and relevant works in Aitoloakarnania prefecture. The project includes a 2,081 m water intake tunnel, 767 m of which has already been excavated and 143 m already lined under previous contracts. The tunnel section consists of a semicircular arch roof of 2.90 m diameter and orthogonal bottom of 1.20 x 2.90 m. Read details in E-News Weekly 5/2007. Visit www.elter.gr 20/07.



Permalink

Greece, Peloponnese - gr/33

Highway

The Apion Kleos consortium led by VINCI (36%) is the preferred bidder for Greece's biggest highway concession contract between Athens, Corinth, Patras, Pyrgos and Tsakona, in southwest Peloponnese. VINCI's partners are its affiliates VINCI Concessions and VINCI Construction Grands Projets, Hochtief, and Greek companies Elleniki Technodomiki, Aktor, J&P-Avax, and Athina. The project consists in the design, building, financing and operation (DBFO) of 365 kilometres, most of it along the Peloponnese's northern and western coast. The highway will run through the Rion-Antirion bridge, built and operated by VINCI.The project involves the handover of the operation of the highway from Elefsina, west of Athens, to Corinth (64 km) and the Patras ring road (18 km), and the reconstruction and rerouting of national roads into highway on the Corinth-Patras section (120 km). This stretch from Corinth to Patras includes tunnels totalling 17 km, 61 bridges and 13 flyovers. The 30-year concession contract also requires 163 km of new construction between Patras and Tsakona. Most of the project will be new highway (283.7 km) and the rest (81 km) improvements to the existing infrastructure. It is to have two or three lanes in each direction, allowing speeds of up to 120 km throughout. The EUR2.1 billion highway is to be delivered over six years. Visit www.vinci.com 07/07.The Apion Kleos consortium, led by VINCI with 36%, signed in end July the contract with the Greek government for the Athens-Tsakona motorway, the country's biggest motorway concession project. The contract has yet to be ratified by the Greek parliament. The expected start of the concession is April 2008. The other members of the consortium are Hochtief of Germany (25%) and three Greek companies, namely Elliniki Technodomiki-Aktor (18%), J&P-Avax (18%) and Athena (3%). The project calls for the financing, design, construction and/or repair of 365 km of toll motorway between Athens and Tsakona in the southwest of the Peloponnese, via Corinth and Patras. This breaks down into 82 km of existing motorway, 120 km to repair and widen, and 163 km to build. The project also calls for operating the motorway for 30 years. Visit www.vinci.com, www.hochtief-construction.de, www.etae.gr and www.jp-avax.grThe project includes nine tunnels: Xylokastro (163 m /158 m), Derveni (655 m / 645 m), Mavra Litharia (1,224 m / 1,225 m), Akrata (839 m / 305 m), Platanos (1,932 m / 1,605 m), Panagopoula (five tunnels of 338 m, 132 m, 556 m, 4,018 m and 3,182 m), Aghios Georgios (386 m / 352 m), Koliri (348 m / 296 m) and Elia (238 m / 187 m). The tunnels of less than 600 metres will be 12.75 m wide at their base and 7.5 m high to the crown. The tunnels of more than 600 metres will be 10.25 m wide at the base and 7 m high to the crown. Drilling and blasting will be used as per the NATM principles. Rock haulage will be done by trucks. Click here for more info on the tunnels. Work is scheduled to commence in September 2008. The estimated cost of the tunnels amounts to EUR203 million for civil works and EUR46 million for E&M equipment (value 2006, design and ground investigation not included). 46/07.Olympia Odos, the concession company led by VINCI Concessions (36%), in partnership with Hochtief PPP Solutions (25%) and three Greek construction companies, Aktor Concessions (18%), J&P-Avax (18%) and Athena (3%), has just completed with a consortium of 19 banks the financing arrangements for the concession contract for the Athens-Corinth-Patras-Tsakona motorway, the largest ever won by VINCI outside France. This financing agreement, in addition to the equity contributions of the partners in Olympia Odos and a subsidy from the Greek government, amounts to EUR1.6 billion, of which EUR990 million is senior debt with a 13-year maturity and EUR200 million is a loan from the European Investment Bank (EIB). The project involves the financing, construction and repair, as well as the operation over 30 years, of 365 kilometres of toll motorways linking Athens to Tsakona in the southwest of the Peloponnese, via Corinth and Patras. Of the total, 82 kilometres already exist, 120 kilometres need to be renovated and widened, and 163 kilometres of new motorway will be built over a period of six years. They include the construction of 19 kilometres of tunnels. The construction will be carried out by a consortium consisting, in particular, of VINCI Construction Grands Projets and its German and Greek partners. The total cost of the project is EUR2.8 billion. The concession came into force on 4th August, 2008. Click gr/33. 34-35/08.



Permalink

Greece, Macedonia - gr/32

Motorway

Hochtief PPP Solutions, together with partners, has been named preferred bidder by the Greek Ministry of Public Works for the Maliakos-Kleidi toll motorway project. Hochtief holds a 35% stake in the concession company, Aegean Motorway Group, and is leader of the consortium. The other partners are Vinci Concessions (13.75%) and the Greek companies Elliniki Technodomiki TEB, J&P-Avax, Aegek and Athena. Visit www.hochtief.com and www.vinci.comThe project entails planning, financing, building, operating and maintaining the toll road. The construction measures, in which Hochtief Construction as consortium leader has a stake of about 40%, comprise the building of a new 25 km section of the motorway, including 26 bridges and approx. 2 x 11 km of tunnels. The consortium will also upgrade and repair a further 205 kilometres of the existing toll route between the Maliakos Gulf and Thessaloniki. The concession has a duration of 30 years. Construction, which will last four and a half years, will cost EUR720 million (2005 price). The contract is expected to be signed by year end and work will commence immediately after.The motorway is a 230 km-long section of the most important Greek trunk road, between Athens and Thessaloniki, and is a project within the EU's Trans-European Network (TEN). The investment volume will come partly from EU-funded start-up financing, while over two-thirds of the total will be raised in the form of long-term bank loans and equity contributions from the partners. The loans and equity contributions will be recouped from toll charges and service station concessions. 37/06.



Permalink

Greece, Macedonia - gr/31

Railway

Poyry has been awarded a contract for reviewing and updating the existing feasibility study of the Hellenic Railways for the Siatista-Kozani railway segment. The contract includes the designs of all the necessary civil works and the rehabilitation of the road network. The main structures are two tunnels of 1,300 m and 650 m. This project will be executed in cooperation with two Greek consultants, Salfo & Associates and S. Liaros-Helida Engineering Consultants. Poyry's share of the contract is approximately EUR1 million. The project will be completed in 12 months. Visit www.poyry.com and www.salfo.gr 25/06.



Permalink

Greece, West Greece - gr/30

High Speed Railway

ERGOSE, a subsidiary of the Hellenic Railways, on 13th September announced that a joint venture between Aktor and Pantechniki was selected as provisional winner of a tender to build a bridge and two railway tunnels, on the Athens-Patra high speed line, worth EUR100.5 million. The two tunnels will be built in Platanos (2,293 m in length) and Trapeza (2,748 m) on the Kiato-Aegio section in west Peloponnese. The tunnels have been designed to accommodate a double-track standard gauge railway line, with a cross section of approximately 100 sq m. Each tunnel will have two escape tunnels, whose overall length will be approximately 1,000 m. The project will be financed by the EU's second Cohesion Fund (50%) and on the national budget (50%). The project is expected to be delivered in 36 months after signing of the contract. Visit www.ergose.gr, www.aktor.gr and www.pantechniki.gr 39/05.Open call for tenders, deadline 9th February, 2006 for construction of the Platanos and Trapeza single bored tunnels (2,259 m and 2,713 m) on the Kiato-Aegio section on the Athens-Patra high speed line in west Peloponnese. This is a re-bid, further to the cancellation of the contract awarded in September 2005. Click gr/30. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=241770-2005, OJ S 245, or contact Erga Ose, Athens, fax +30 2105283392. E-mail pakoukou@ergose.gr 04/06.Open call for tenders, deadline 16th February, 2006 for construction of the Aegio single bored tunnel (3,252 m) on the Athens-Patra high speed line in west Peloponnese. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=01886-2006, OJ S 1, or contact Erga Ose, Athens, fax +30 2105283392. E-mail pakoukou@ergose.gr 04/06.Open call for tenders, deadline 30th March, 2006 for construction of a 6.8 km section near Patras on the Athens-Patras high speed link, including the 1,815 m-long Melissiou tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=030139-2006, OJ S 27, or contact Erga OSE, Athens, fax +30 2105283392. E-mail pakoukou@ergose.gr 08/06.A JV of Terna, Mochlos and Aktor has secured a EUR53.6 million contract to construct the Aegio single bored tunnel (3,252 m) on the Athens-Patra high speed line in west Peloponnese. Visit www.terna.gr, www.mochlos.gr and www.aktor.gr 35/06.Michaniki signed a EUR37.7 million contract to build section Kiato-Rododafni (6.8 km) on a new double railway line, including the Melissiou tunnel (1,815.6 m) in northern Peloponnese. The project also includes the construction of an escape tunnel extending for around 298 metres. The time schedule for the completion of the project is 30 months from the signing of the contract in June. Visit www.michaniki.gr 36/06.A JV of J&P-Avax, Terna and Aktor won a EUR71.8 million contract to build the Platanos and Trapeza single bored tunnels, respectively 2,259 m and 2,713 m long, on the Kiato-Aegio section on the Athens-Patra high speed line in west Peloponnese. Visit www.jp-avax.gr, www.terna.gr and www.aktor.gr 03/07.Open call for tenders, deadline 13th March 2007 for construction of a 12.5 km-long railway section including two twin bored tunnels of 592 m and 464 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=12773-2007, OJ S 11, or contact Erga OSE, Athens, fax +30 2105283392 or 2105283149. E-mail pakoukou@ergose.gr 05/07.Michaniki is the preferred bidder for construction of the new Kiato-Rododafni double-track line, including the Derverni tunnels in Northern Peloponnese, budgeted at EUR211 million. The project includes the construction of the infrastructure of a modern double railway line which spans approximately 40 km, two railway tunnels in Derveni region of total length of 1,056.6 metres and railway bridges. The project also includes road works and relevant to the line hydraulic works. The time schedule for the completion of the project is 30 months after the official signing of the contract. Visit www.michaniki.gr 13/07.



Permalink

Periodic notice for construction of the section Aegio (Rododafni)-Psathopyrgos on a new double railway line, including the 4.8 km-long Panagopoula tunnel. Contract value EUR305 million, duration 30 months. Contact Erga OSE, Athina, tel +30 21052833-90, fax -92, e-mail pakoukou@ergose.gr. Visit www.ergose.gr. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=115665-2009. 19/09.



Permalink

Prior information notice for start of award procedure for construction of the section Aegio (Rododafni)-Psathopyrgos of a new twin-track railway line, including the 4.8 km-long Panagopoula tunnel. Contract value EUR315 million, duration 36 months. Contact Erga OSE, Athina, tel +30 21052833-90, fax -92, e-mail nintasios@ergose.gr. Specs and docs from evkanellop@ergose.gr. Visit www.ergose.gr and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=058557-2012. 08/12.



Permalink

Open invitation to tender, deadline 08.05.2012, for construction of the section Aegio (Rododafni)-Psathopyrgos of a new twin-track railway line, including the 4.8 km-long Panagopoula tunnel. Contract value EUR315 million, duration 36 months. Time limit for receipt of requests for documents or for accessing documents: 02.05.2012. Further information from Erga OSE, Athens, tel +30 2105283249, fax -392, e-mail nintasios@ergose.gr. Specs and docs from evkanellop@ergose.gr. Visit www.ergose.gr and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=077702-2012. 11/12.



Permalink

Open invitation to tender, deadline 31.12.2013, for the construction of remaining infrastructure, superstructure, signalling, telecommanding, telecommunications and electrical installations in tunnels for the new railway line Kiato to Rododafni, approximately 71 km-long. The project is part of the wider construction project of the new double-track railway line Athens (SKA)-Patras. Time limit for receipt of requests for documents or for accessing documents: 24.12.2013. Contact Erga OSE SA, att.n Nikolaos Ntasiou, Athens, tel +30 2105283249, fax +30 2105283392, e-mail nintasios@ergose.gr. For further information contact Erga OSE SA, att.n President Bids Office, Tender n. AD 715, Athens, tel+30 2105283152, fax +30 2105283149, e-mail pakoukou@ergose.gr for sending the offers. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=376592-2013. 46/13.



Permalink

Award of contract number 715, value EUR227,043,595 excluding VAT, for the construction of remaining infrastructure, superstructure, signalling, telecommanding, telecommunications and electrical installations in tunnels for the new railway line Kiato to Rododafni, approximately 71 km-long. The project is part of the wider construction project of the new double-track railway line Athens (SKA)-Patras. For further information contact Erga OSE SA, att.n President Bids Office, Tender n. AD 715, Athens, tel+30 2105283152, fax +30 2105283149, e-mail pakoukou@ergose.gr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358070-2014. 43/14.



Permalink

Greece, Central Greece - gr/29

High Speed Railway

Periodic notice for construction of a 9 km section, including the 6.5 km Orthris tunnel near Domokos some 200 km north of Athens. It will be a single or double tube, to be built with an excavator in accordance with NATM or with a TBM. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=099059-2005, OJ S 99, or contact Erga OSE, Athens, fax +30 5283392. E-mail pakoukou@ergose.gr 22/05.Restricted procedure, deadline 12th December, 2005 for construction of the 11 km Lianokladi-Domokos railway section on the Patras-Athens-Thessaloniki line, including the 2 x 6.5 km Othrios twin-tube tunnel, a 400 m twin-track tunnel and a cut-and-cover tunnel (2 x 630 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=206216-2005, OJ S 209, or contact Erga OSE, Athens, fax +30 5283392. E-mail pakoukou@ergose.gr 47/05.Open call for tenders, deadline 2nd October, 2006 for construction of the 2 x 6.5 km Orthris tunnel, including cut-and-cover extremities at each tube. The contract also includes two access adits of 900 m each and a smaller double-track single-tube tunnel of 400 m. The Orthris tunnel will be built using conventional excavators. This is a re-bid. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=164604-2006, OJ S 152, or contact Erga OSE, Athens, fax +30 2105283392 or 2105283149. E-mail pakoukou@ergose.gr 37/06.Contract 431 awarded to Malios Associates and Intecsa-Inarsa for EUR2.4 million involves the final design of tunnels SS6 (Orthris tunnel) and SS5 of the new double-track high speed railway Lianokladi-Domokos (section from Ch. 13+500 to Ch. 25+000). The project area is located in central Greece, to the west end of Orthris mountain, south of Xiniada basin and NW of Sperhios basin. The tunnels, having general direction SE-NW, are part of the new double-track railway line connecting Athens to Thessaloniki. Visit www.malios.gr and www.intecsa-inarsa.esThe geological formations of the area are distinguished in five main units depending on their lithology and engineering geological characteristics. These units, from the poorest - in terms of geomechanical behaviour - to the more optimum are alluvial deposits, schist-chert formations and flysch (semi-rock formations), breccia-conglomerate deposits, peridotites and dolerites of the ophiolite complex and limestones.Tunnel SS5 has a total length of 432.5 m, with underground excavation 370 m in length and a cut-and-cover entrance of 35.5 m long and a cut-and-cover exit of 27 m long. The excavation cross section area ranges from 116.35 sq m to 120.03 sq m when horse-shoe shaped and from 138.16 sq m to 149.44 sq m when approximately circular. The effective cross section is 78.95 sq m. NATM will be applied for the construction of SS5 and, depending on the rockmass conditions, either full face or sectional excavation will take place. The support elements are rockbolts, steel arches, shotcrete with or without fibres, fiberglass anchors for support of the tunnel face, as well as bolts and fore poling. Tunnel SS6 is a twin tunnel with total length of underground excavation of 12,780 m. Regarding the entrance area, the right branch consists of a cut-and-cover of 17.2 m long and a cut-and-cover of 14.5 m long before the underground excavation whereas the left branch consists of a cut-and-cover of 18.5 long. Regarding the exit area, there will be a cut-and-cover of 107.5 m long for each branch as well as a cut-and-cover of length 522.35 m on the right branch and 521.35 m on the left branch. The distance between the two axes of the tunnels ranges from 25 m up to 110 m.Between the two branches, there will be connecting tunnels at 500 m intervals. The excavation cross section area ranges from 36.84 sq m to 37.34 sq m when horse-shoe shaped and from 42.66 sq m to 51.37 sq m when approximately circular. The effective cross section is 20.81 sq m. NATM method will be applied for them either with full face excavation or sectional excavation. The excavation cross section area ranges from 80.5 sq to 86.7 sq m when horse-shoe shaped and from 94.84 sq m to 111.16 sq m when approximately circular. The effective cross section is 53.02 sq m. NATM will be applied for the construction of SS6. Depending on the rock mass conditions, the excavation will be either full face or sectional. The excavation will be carried out by mechanical means or drill and blast. The support categories of the tunnel are distinguished between stiff and yielding support. The former, sectionally excavated, are either approximately circular or horse-shoe shaped, with or without forepoling, whereas the approximately circular profile can be with temporary invert or not. The yielding support categories will be constructed either with full face or sectional excavation, with or without forepoling. The support for both categories (stiff and yielding) include anchors, steel arches, shotcrete with or without fibres, bolts and forepoling for the stability of the tunnel face. The project also includes the construction of two side access adits (Moschokarya tunnel and Agios Stefanos tunnel), 970 m and 750 m long respectively. The excavation cross section area ranges from 48.21 sq m to 49.79 sq m when horse-shoe shaped and from 53.4 sq m to 67.9 sq m when approximately circular. The effective cross section is 22.7 sq m. NATM method will be applied and the excavation will be either full face or sectional. The tunnel will have either horse-shoe shaped or approximately circular cross sections whereas at places yielding support will be applied. Mechanical excavation or drill and blast will be required for excavation. The support includes anchors, steel arches and shotcrete. At places, the tunnel face will also be temporarily supported and additional support may be required by means of bolts and forepoling. A prequalification tender has already started. The project is expected to start within the year 2007 and it will take four years for its completion. The estimated cost amounts to EUR324 million, including the construction of five bridges of total deck area of 24,908 sq m in addition to the afore-mentioned tunnels. Visit www.ergose.gr 39/06.Michaniki signed a EUR63.1 million contract for the construction of the Lianokladi-Domokos high speed rail line section. The project includes the construction of railway tunnels of a total length of 1,623 metres, the relevant works at the entrance and exit of the tunnels, railway bridges of a total length of 1,447 metres, road bridges of 277 metres and the relevant hydraulic works. The time schedule for completion of the project is 32 months from the signing of the contract. Visit www.michaniki.gr 06/07.Open call for tenders, deadline 26th June, 2007 for construction of a 27 km railway section, including eight single bored twin-track tunnels in Domokos, for a total length of 2.6 kilometres (137.5 m, 250 m, 537.5 m, 512.5 m, 250 m, 289 m, 342.5 m, and 312.5 m) and two cut-and-cover tunnels of 179 m and 129 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103559-2007, OJ S 84, or contact Erga OSE, Athens, fax +30 2105283392. E-mail pakoukou@ergose.gr 19/07.Erga OSE signed on 23rd April, 2007 its largest contract to date for construction from Ch. 14+000 to Ch. 25+000 on the new Lianokladi-Domokos double-track high speed line. The EUR210.7 million contract has been awarded to Aktor and includes one of the most important tunnels to be constructed under the national railway network modernization programme, namely a twin-tube single-track tunnel, each tube 6.4 km long, under Orthris Mountain. The project will be completed in four years. Visit www.ergose.gr and www.aktor.gr 19/07.



Permalink

Greece, Thessaly - gr/28

Road

Open call for tenders, deadline 17th March, 2004 for construction of the 1,470 m single-tube Gropa tunnel, 10 m in nominal diameter. Cost: EUR27 million. NATM to be used with drill/blast if necessary. Support with forepiling, steel arches and bolts. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=011505-2004, OJ S 14, or contact Ypechode, Athens, fax +30 2106450782. E-mail ggdeosye@otenet.gr 05/04.Open call for tenders, deadline 31st March, 2004 for construction of the 1,470 m single-tube Gropa tunnel, 10 m in nominal diameter. Cost: EUR27 million. NATM to be used with drill/blast if necessary. Support with forepiling, steel arches and bolts. This tender cancels and replaces the one published in January. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=022663-2004, OJ S 26, or contact Ypechode, Athens, fax +30 2106450782. E-mail ggdeosye@otenet.gr 08/04.Open call for tenders, deadline 10th March, 2005 for construction of the 1,470 m single-tube Gropa tunnel, 10 m in nominal diameter. Cost: EUR27 million. NATM to be used with drill/blast if necessary. Support with forepiling, steel arches and bolts. This is a rebid. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=012973-2005, OJ S 14, or contact Ypechode, Athens, fax +30 2106450782. E-mail ggdeosye@otenet.gr 04/05.J&P Avax's subsidiary Eteth was awarded a EUR14 million contract for the construction of the Gropa road tunnel on the Pyli-Stournareika-Mesohora secondary national road in Trikala prefecture, central Greece. The project includes a 1,470 m tunnel. The new route will divert traffic away from the Gropa mountain pass which produces several landslides and frequent traffic halts due to snowfall during the winter. The contract includes also the E&M equipment. The project is due for completion in 42 months. Visit www.jp-avax.gr 40/05.



Permalink

Greece, Sykia - gr/27

Hydro

Open call for bids, deadline 5th November, 2003 for completion of the Sykia dam. There are six grouting and drainage tunnels at three different levels totalling 2,961 m. The remaining length to build is 1,034 m, cross section 10.42 sq m. Also to build is an additional diversion tunnel, length 1,409 m, cross section 13.80 m. Mainly Cretaceous and Jurassic limestone plus flysch. Drill/blast method. Rockbolts and shotcrete as support with HEB steel supports if needed. Mucking-out with wheel loaders and dumper trucks. Design and technical consultancy by PPC / DAYE. Work supervision by EYDE and OSYE. Financing by the Greek government. Construction of the additional diversion tunnel will commence in June 2004 for completion in December 2005. The whole project will be commissioned in November 2009. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=154242-2003, OJ S 169, or contact Ypechode, fax +30 6450782. E-mail ggdeosye@otenet.gr 40/03.



Permalink

Greece, Crete - gr/26

Water

Open call for bids, deadline 24th September, 2003 for construction in the area of Prasson, western Crete of a 3,320 m-long 13 sq m tunnel for the passage of a pipeline that will transport water from the Amari dam to the plain of Rethimno for irrigation and drinking water. Also construction of a drainage tunnel, length 140 m and inner cross section 6.5 sq m, and an obstruction tunnel in the area of the Amari dam. The site of the project is 10 km south of the city of Rethimno on the northern side of Crete. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=134527-2003, OJ S 148, and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=135335-2003, OJ S 149, or contact Organization for the Development of Western Crete (Oadyk), Chania, fax +30 2821093350. E-mail oadyk@oadyk.gr 37/03.



Permalink