Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Spain

Spain, Madrid - es/128

Highway

Open call for tenders, deadline 12th January, 2006 for draft design for the construction and operation of the completion of the M-50 orbital motorway, section A-6 to M-607 between Madrid and Las Rozas. This prpject includes a very long tunnel under Mount El Pardo. Read E-News Weekly 42/2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=227163-2005, OJ S 230, or contact Consejerí­a de Transportes e Infraestructuras, Madrid, fax +34 915803140. 50-51/05.Typsa received a EUR732,800 contract for the draft design for the construction and operation of the completion of the M-50 orbital motorway, section A-6 to M-607 between Madrid and Las Rozas. This section includes a long double tunnel under Mount El Pardo. Visit www.typsa.es 10/06.



Permalink

Spain, Catalonia - es/127

Irrigation

Open call for tenders, deadline 4th October, 2005 for construction of section I of the Segarra-Garrigues canal in Lleida province. This section includes two 4.7 m-diameter tunnels: Rialb (1,207 m) and Ponts (631 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=145067-2005, OJ S 145, or contact Canal Segarra-Garrigues, Tarrega, fax +34 973310458. Also visit www.casega.es and subscribe to E-News Weekly 36/2005. 36/05.Open call for tenders, deadline 4th October, 2005 for work supervision for section I of the Segarra-Garrigues canal. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=145058-2005, OJ S 145, or contact Canal Segarra-Garrigues, Tarrega, fax +34 973310458. Also visit www.casega.es and subscribe to E-News Weekly 36/2005. 36/05.Open call for tenders, deadline 21st December, 2006 for construction of section II, subsection A of the Segarra-Garrigues canal. It includes the Oliola tunnel, 4,470 metres of which will be bored and 521 metres dug in cut-and-cover. The tender estimate amounts to EUR37.4 million and the time frame for construction is 24 months. Read E-News Weekly 36/2005. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=221597-2006, OJ S 208, or contact Canal de Segarra-Guarrigues, Tarrega, fax +34 973310458. E-mail alba@casega.es 47/06.Open call for tenders, deadline 21st December, 2006 for work control and site supervision during construction of section II, subsection A of the Segarra-Garrigues canal. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=221954-2006, OJ S 208, or contact Canal de Segarra-Guarrigues, Tarrega, fax +34 973310458. E-mail alba@casega.es 47/06.Acciona and M. y J. Gruas received a EUR30.1 million contract to build section II, subsection A of the Segarra-Garrigues canal. It includes the Oliola tunnel, 4,470 metres of which will be bored and 521 metres dug in cut and cover. Visit www.acciona.es and www.mjgruas.com 13/07.Cygsa bagged a EUR1 million contract for work control and on-site supervision during construction of section II, subsection A of the Segarra-Garrigues canal. Visit www.cygsa.com 13/07.Emap and its partner Entorn concluded a EUR110,250 deal for the environment management during construction of sections IIb and III of the Segarra-Garrigues canal. Section III includes the 2,379 m-long Tarrega tunnel, featuring an inner diameter of 4.15 metres. Read E-News Weekly 19/2007 & 36/2005. Visit www.entorn.com 29/07.Atenea received a EUR123,000 contract for health and safety consultancy for the same sections. Visit www.ateneasa.com 29/07.A consortium of Bruesa and Ploder has been awarded a EUR51.1 million construction contract for the third section of the Segarra-Garrigues canal in Lleida. The project encompasses the construction of 21 additional kilometres of this canal until the municipality of Tarrega (Urgell). It includes the construction of the 2.4 km Tarrega tunnel. Once this third phase is completed, the Segarra-Garrigues canal will stretch for 42.5 kilometres out of the planned 84.7 km length. Read E-News Weekly 36/2005. Visit www.bruesa.com and www.ploder.es 48/07.



Permalink

Fifth section of Segarra-Garrigues canal project underway, including 5 km-long x 4.1 m-diameter Bessons tunnel awarded to JV Acciona/ACSA Sorigue/Rubau. Original TBM M-949M supplied to Acciona in 2005 has been converted by Herrenknecht, from 3.5 m-diameter cutterhead with universal ring lining system to 4.1 m-diameter cutterhead for CBE honeycomb dowel system lining on this project, with facility to convert back in future. Full history of project at tunnelbuilder archive es/127. More from www.cbe-tunnels.com, www.acciona.com and www.herrenknecht.com. 32/11.



Permalink

Spain, Malaga - es/126

Highway

Open call for tenders, deadline 17th February, 2006 for concession contract for the 24.5 km toll highway AP-46 from Alto de las Pedrizas to Malaga. The highway will have two tunnels, 430 m and 1,430 m in length. The scheduled date for entry in service is 31st December, 2009. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=157809-2005, OJ S 158, or contact Ministry of public works, Madrid, fax +34 915978537 or 915978470. E-mail cpublic@mfom.es 36/05.Open call for tenders, deadline 4th October, 2005 for reports prior to the alignment and project supervision for the Malaga-Las Pedrizas toll highway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=154188-2005, OJ S 154, or contact Ministry of public works, Madrid, fax +34 915978537 or 915978470. E-mail cpublic@mfom.es 36/05.Urbaconsult and Torroja Ingenieria received a EUR1.9 million contract for the follow-up, checking and writing of reports prior to the alignment and project supervision for the Malaga-Las Pedrizas toll highway. The 24.5 km highway AP-46 from Alto de las Pedrizas to Malaga will have two tunnels (430 m and 1,430 m). Visit www.torroja.org 12/06.The Las Pedrizas toll highway AP-46 is intended to solve the saturated traffic situation on the main northern access to Malaga. The project has made a significant step forward further to the Ministry of development's decision to aprove 99% of the alignment presented by the concessionaire appointed for the construction and operation of the écheme. The concessionaire includes Itinere (70%), Sacyr (10%), respectively the infrastructure concession company and the construction firm of Sacyr Vallehermoso, and GEA 21 (20%). The approval allowed to commence the land expropriation process. The alignment and final project will be known in January and February. It is hoped that the land expropriation phase will then be ended and that the first machinery will start working. The concession will last 36 years and may be extended another four years. Visit www.gruposyv.com and www.gea21.esHighway AP-46 will link Alto de Las Pedrizas, more precisely the Villanueva de Cauche municipality, with Puerto de la Torre, where it will join with Malaga's second ring road. It is 24.5 km long and will cost EUR367.1 million. Opening to traffic is programmed befote 31st December, 2009. Starting from Villanueva de Cauche, the existing A-45 will be widened to three lanes. Then, the road stretches for two kilometres north of Casabermeja where two tunnels, 430 m and 1,430 m in length will be built to preserve the Cauche river. The second tunnel exit is in Almogí­a, from where drivers will join the future second ring road. 52/07-01/08.



Permalink

Spain, Andalusia - es/125

Highway

Open call for tenders, deadline 19th April, 2005 for project design for sinking underground road N-340 in San Pedro Alcantara near Marbella. The length is 5.95 km, starting southwest of San Pedro to end in the suburbs of Puerto Banus. Tender estimate: EUR735,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=042446-2005, OJ S 44, or contact Ministry of public works, Madrid, fax +34 915978537 or 915978470. E-mail flmenchero@mfom.es or cpublic@mfom.es 10/05.A JV formed by Imca and Narval will design the project to transfer underground road N-340 in San Pedro Alcantara near Marbella. The next stage will be the invitation to tender for construction of this 5.95 km cut-and-cover tunnel, budgeted at EUR52.9 million. Visit www.narvalingenieria.es 33-34/05.Open call for tenders, deadline 27th January, 2006 for construction of the San Pedro de Alcantara road crossing near Marbella. The route is formed by two sections. The first subsection (3.7 km) includes a 1 km-long cut-and-cover tunnel, to be built between diaphragm walls. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=05484-2006, OJ S 5, or contact Ministry of public works, fax +34 915978537 or 915978470. E-mail cpublic@mfom.es 04/06.The Ministry of public works awarded the San Pedro Alcantara underground crossing on the A-7 to OHL for a total of EUR49.9 million, which is EUR18.73 million less than the tender estimate.The 5.95 km project will start southeast of San Pedro Alcantara and end in the vicinity of Puerto Banus. It will connect with the Mediterranean highway A-7. The route, which currently follows the alignment of the old road N-340 until the outskirts of Puerto Banus, will run underground in a section of approx. 1,075 metres to avoid two of three sets of traffic lights at Marques del Duero and El Ingenio junctions. In addition, the new link will enable drivers to avoid long traffic queues through the city centre of San Pedro Alcantara during peak tourist seasons. The scheme plans two 3.5 m lanes per direction. Construction will take 30 months. Visit www.ohl.es 20/06.Open call for bids, deadline 6th October, 2006 for control and work supervision during construction of the San Pedro de Alcantara crossing, which includes a 1.1 km cut-and-cover tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=155309-2006, OJ S 144, or contact Ministry of public works, Madrid, fax +34 915978537 or 915978470. 33-34/06.Narval Ingenieria and Geocisa signed a EUR1.4 million contract for on-site control and work supervision during construction of the San Pedro de Alcantara crossing, which includes a 1.1 km cut-and-cover tunnel. Visit www.narvalingenieria.es and www.geocisa.com 14/07.



Permalink

Obrascon Huarte Lain, SA secured the EUR12.95 million contract for jacking on Guadair river, link with storm chamber 2, drainage for the San Pedro tunnel, breakwater walls and ancillary works. Conditioning of the A-7, P.K. 169.26 to 175.16. Contact Direccion General de Carreteras, Madrid, tel +34 915978341, fax +34 915978547, e-mail calgaba@fomento.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=092631-2013. 13/13.



Permalink


Open call for tenders, deadline 27/09/2022, for the periodic inspection of tunnels in zone 2 (Western Andalusia, Eastern Andalusia, Castilla La Mancha, Extremadura, Madrid and Murcia) of the State Highway Network. Click here for tender documents and here for the list of tunnels. Value of the contract is EUR 1.53 million, excluding VAT. Duration of the contract will be 36 months.  Contact  Dirección General de Carreteras, Madrid, tel +34 915978341, fax +34 915978547, email dgc.licitaciones@fomento.es.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=465673-2022. Ref.n.  230229328671. 35/22. 

 

Spain-Madrid: Consultative engineering and construction services

2022/S 164-465673

Contract notice

Services

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Dirección General de Carreteras
National registration number: S2817015G
Postal address: Paseo de la Castellana 67 - Despacho B750
Town: Madrid
NUTS code: ES300 Madrid
Postal code: 28071
Country: Spain
Contact person: Dirección General de Carreteras
E-mail: dgc.licitaciones@fomento.es
Telephone: +34 915978341
Fax: +34 915978547
Internet address(es):
Main address: http://www.fomento.es
Address of the buyer profile: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=bbqeQ9uN6YE%3D
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

30.632/22-2; AC-542/22 Inspección periódica de túneles de la zona 2 de la red de carreteras del estado, formada por la Demarcación de Carreteras en Andalucía Occidental, Andalucía Oriental, Castilla La Mancha, Extremadura, Madrid y Murcia. 3º Itinerario.

Reference number: 230229328671
II.1.2)Main CPV code
71310000 Consultative engineering and construction services
II.1.3)Type of contract
Services
II.1.5)Estimated total value
Value excluding VAT: 1 528 497.77 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ES España
II.2.6)Estimated value
Value excluding VAT: 1 528 497.77 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 36
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 27/09/2022
Local time: 19:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Spanish

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
23/08/2022




Permalink

Spain, Alicante - es/124

Jucar-Vinalopo Aqueduct

Section II 'Cuesta' will be built by OHL and Serrano Aznar Obras Publicas, for EUR41.9 million and a time frame of 34 months. Intecsa-Inarsa will be responsible for construction management and quality control, for EUR865,200. This section includes a 12.3 km tunnel. Visit www.ohl.es and www.intecsa-inarsa.esSection III 'Los Machos' has been awarded to Necso for EUR33.7 million and a time frame of 31 months. The construction management and quality control, worth EUR854,480, has been commissioned to Eptisa. This section includes a 11 km tunnel. Visit www.necso.es and www.eptisa.esThe builders ordered two new Herrenknecht hard rock TBMs, 3.5 m in diameter, to build the infrastructure which will cross Los Machos mountain and El Caroig massif. Visit www.herrenknecht.comOther minor underground works are included in section I (two raise boring jobs and some length in tunnel) and in section IV 'Navalon', which necessitates 2.5 km of cut-and-cover tunnel. Section IV has been pocketed by Ferrovial Agroman and Sedesa Obras y Servicios, for EUR23.8 million and a time frame of 29 months. Eyser and Inclam Ingenieria del Agua will be in charge of the work management and quality control, for EUR753,760. Visit www.ferrovial.com and www.eyser.comThe water transfer scheme between the Jucar and Vinalopo regions is a 67 km infrastructure for water supply to 600,000 inhabitants and watering of 40,000 hectares of land in the Vinalopo, Alacanti and Marina Baixa regions in Alicante province. The Jucar-Vinalopo aqueduct is divided in seven sections and has been designed to transfer 5.65 cu m per second. Click here and here. Visit www.aguas-jucar.es 09/05.Open call for bids, deadline 21st April, 2005 for technical management of the Jucar-Vinalopo water tunnel, sections II Cuesta, III Los Machos and IV Navalon. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=043492-2005, OJ S 45, or contact Aguas del Jíºcar, Valencia, fax +34 963940482. E-mail info@aguas-jucar.es 11/05.IZ Ingenieros Consultores secured a EUR357,000 contract for technical management of the Jucar-Vinalopo water tunnel, sections II 'Cuesta', III 'Los Machos' and IV 'Navalon'. Section II 'Cuesta' includes a 12.3 km tunnel and section III 'Los Machos' includes a 11 km tunnel, each 3.5 m in diameter. Section IV 'Navalon' includes 2.5 km of cut-and-cover tunnel. Click es/124. 25/05.Open call for bids, deadline 21st March, 2006 for design of sections A to E of the new Jucar-Vinalopo aqueduct and connection with section V on the lower course of the Jucar river. The European Commission had conditioned a EUR80 million financing for the Jucar-Vinalopo water transfer to a new revision of the project. The modified project has required or will require to cancel the contracts previously signed with the successful bidders, who will receive compensation. Click here.The new Jucar-Vinalopo route takes advantage of sections V, VI and VII of the old alignment and re-uses section I, which will generate energy. With respect to sections II, III and IV, construction had not begun and the TBMs purchased to drive the tunnels within the previous scheme will be operated to drive the tunnels of the revised aqueduct (13 km in total). Click here. The new route has been divided into five sections (A to E). It is more environmentally friendly since it reduces to the minimum the impact on protected zones and contributes to safeguard the Vinalopo aquifers. Actually, the new water line will cross only 3.2 km of protected areas listed by the EU, while the previous alignment planned to cross 44.7 km of such areas. The total budget of the Jucar-Vinalopo water transfer is EUR225.6 million. Visit www.aguas-jucar.esSections A, D and E have no tunnels. Section B includes the Sierra de Corbera tunnel (2,720 m), which begins the first gravity stretch, and the Barxeta tunnel (2,950 m). The budget amounts to EUR43.8 million. Section C requires to bore the Sierra Requena tunnel (3,540 m) and the Sierra Grossa tunnel (3,920 m). The budget totals EUR49.7 million.The bidding stipulates a 4-month time frame for the project design and 20 months for construction. Out of these 20 months, it is estimated 18 months will be necessary for the construction of each section. The new Jucar-Vinalopo aqueduct could be concluded at the end of 2008. Click es/124. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=244880-2005, OJ S 248, or contact Aguas del Jucar, Valencia, fax +34 963940482. E-mail info@aguas-jucar.es 03/06.Open call for bids, deadline 22nd May, 2006 for design and construction of section B of the new Jucar-Vinalopo water transfer scheme. Section B includes the Sierra de Corbera tunnel (2,720 m), which begins the first gravity stretch, and the Barxeta tunnel (2,950 m). Click es/124. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=043525-2006, OJ S 41, or contact Aguas del Jucar, Valencia, fax +34 963940482. E-mail info@aguas-jucar.es 11/06.OHL, Serrano Aznar Obras Publicas and Ocide Construccion secured a EUR32 million contract to design and build section B of the Jucar-Vinalopo water transfer scheme. This section includes the Sierra de Corbera tunnel (2,720 m) and the Barxeta tunnel (2,950 m). Visit www.ohl.es 33-34/06.Typsa pocketed a EUR415,000 contract for on-site supervision and quality control for section B of the Jucar-Vinalopo water transfer. Section B includes the 2,720 m-long Sierra de Corbera tunnel and the 2,950 m-long Barxeta tunnel. Click here. Visit www.typsa.es 17/07.



Permalink

Spain, Madrid - es/123

Public Transport

Notice of public works concession, deadline 14th February, 2005 for construction, maintenance and operation of a two-basement transport interchange in Principe Pio, including a 301.7 m entrance tunnel, single tube with sections of 99.84 sq m minimum and 172.8 sq m maximum, and a 192.3 m exit tunnel, single tube with section of 99.8 sq m. The inner diameter is 7.4 m including pavements. Geology: anthropic landfills of sandy nature with clayey matrix and anthropic remains, also alluvial deposits of the Manzanares river constituted by sands with scarse fine contents. The water table lies at approximately 12 m. Cut-and-cover method with covering slab. Transversal ventilation system. Work to commence in May 2005 for completion in May 2007. Tender estimate: EUR50 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=221276-2004, OJ S 255, or contact Consorcio regional de transportes de Madrid, Madrid, fax +34 915804632. 06/05. Notice of public works concession, deadline 14th February, 2005 for construction, maintenance and operation of a three-basement transport interchange in Plaza Eliptica, including an entrance and exit tunnel in Via Lusitana, 2 x 255.8 m with a section of 70 sq m and inner diameter of 8 m including pavements, a twin entrance tunnel in Avenida Princesa Juana de Austria, 143.8 m x 57.76 sq m (6 m inner diameter including pavements) and 202.3 m x 112.36 sq m (8 m inner diameter including pavements) and a twin exit tunnel of 103.4 m x 57.76 sq m (6 m inner diameter with pavements) and 208.1 m x 112.36 sq m (8 m inner diameter with pavements). Geology comprising three groups of materials: anthropic landfills, brown clay and blue plastic clay, very common in Madrid. Variable water table comprised between 5 m and 9 m in depth. Cut-and-cover method with covering slab. Longitudinal ventilation system. Work to commence in May 2005 for completion in May 2007. Tender estimate: EUR40 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=221277-2004, OJ S 255, or contact Consorcio regional de transportes de Madrid, Madrid, fax +34 915804632. 06/05.Notice of public works concession, deadline 30th March, 2005 for construction, maintenance and operation of a three-basement transport interchange in Plaza de Castilla, including a 172.9 m entrance tunnel and a 258 m exit tunnel to the M-30 distributor, single tubes featuring a 90.2 sq m section and minimum inner diameter of 6.8 m including pavements, a 174.4 m entry tunnel and a 177.4 exit tunnel to Paseo de la Castellana, each single tubes featuring a 90.2 sq m section and minimum inner diameter of 6.8 m including pavements, and a 534.5 m dual vertical tunnel in the joint area, 534.5 m in length and 148.1 sq m in section. Geology: deposits of detrital facies, constituted by heterogeneous mix of sands with clays and/or silt of medium to low plasticity. Cut-and-cover method with covering slab. Transversal ventilation system. Work to commence in May 2005 for completion in May 2007. Tender estimate: EUR120 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=025839-2005, OJ S 27, or contact Consorcio regional de transportes de Madrid, Madrid, fax +34 915804632. 07/05.Open call for bids, deadline 30th May, 2005 for inspection, monitoring as well as safety and health coordination during construction of the Principe Pio transport interchange. Click es/123. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=070546-2005, OJ S 73, or contact Consorcio regional de transportes de Madrid, Madrid, fax +34 915804632. 16/05.Open call for bids, deadline 30th May, 2005 for inspection, monitoring as well as safety and health coordination during construction of the Plaza Eliptica transport interchange. Click es/123. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=070551-2005, OJ S 73, or contact Consorcio regional de transportes de Madrid, Madrid, fax +34 915804632. 16/05.A JV formed by Vias y Construcciones, Cobra and Continental Auto, all of them affiliated to ACS, and Empresa de Blas y Cia, will build, maintain and operate Principe Pio interchange for EUR58 million. The surface of the Principe Pio transport interchange will be 27,000 sq m divided on two basements. There will be 28 bus platforms and about 500 m of tunnel to connect directly with the A-5. Visit www.vias.esA group of companies including Sacyr, Castromil and Transportes La Union bagged a EUR36.2 million contract to construct, maintain and operate Plaza Eliptica interchange. The 23,000 sq m Plaza Eliptica transport interchange will be built under Fernandez Ladreda roundabout and will be connected in tunnel to the road to Toledo and Avenida de los Poblados, eliminating daily from the streets of Madrid 2,000 buses from Getafe, Parla and Leganes. In all, there is 1,200 m of tunnel. Visit www.gruposyv.comThe objective of the new transport interchanges is to transfer below ground the stops of intercity bus services, currently located at the surface, and to allow commuters to shift transport means in Madrid. The Madrid government, who approved these contracts, predicts that the new facilities will be in service in 2007. Click es/123. 17/05.Open call for bids, deadline 13th June, 2005 for work inspection, control and health and safety coordination during construction of the Plaza de Castilla interchange. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=077813-2005, OJ S 80, or contact Consorcio regional de transportes de Madrid, Madrid, fax +34 915804632. 19/05.Dragados, Cobra, Continental Auto, Trap, Interbus and Herederos de J. Colmenarejo clinched a EUR119.3 million contract for construction, maintenance and operation of a three-basement transport interchange in Plaza de Castilla, including a 172.9 m entrance tunnel and a 258 m exit tunnel to the M-30 distributor, single tubes featuring a 90.2 sq m section and minimum inner diameter of 6.8 m including pavements, a 174.4 m entry tunnel and a 177.4 exit tunnel to Paseo de la Castellana, each single tubes featuring a 90.2 sq m section and minimum inner diameter of 6.8 m including pavements, and a 534.5 m dual vertical tunnel in the joint area, 534.5 m in length and 148.1 sq m in section. Geology: deposits of detrital facies, constituted by heterogeneous mix of sands with clays and/or silt of medium to low plasticity. Cut-and-cover method with covering slab. Transversal ventilation system. Work to commence in May 2005 for completion in May 2007. Visit www.dragados.com 41/05.Sener won a EUR1.2 million contract for work inspection and health and safety coordination during construction of the Plaza de Castilla interchange. Visit www.sener.es 41/05.Inocsa scooped a EUR744,500 contract for work inspection and health and safety coordination during construction of the Plaza Eliptica transport interchange. Visit www.inocsa.es 43/05.Idom secured a EUR739,900 contract for work inspection and health and safety coordination during construction of the Principe Pio transport interchange. Visit www.idom.es 43/05.Vias y Construcciones, Empresa de Blas y Cia, Cobra Instalaciones and Continental Auto received a EUR58 million contract to build, maintain and operate a two-basement transport interchange in Principe Pio, including a 301.7 m entrance tunnel, single tube with sections of 99.84 sq m minimum and 172.8 sq m maximum, and a 192.3 m exit tunnel, single tube with section of 99.8 sq m. The inner diameter is 7.4 m including pavements. Cut-and-cover method. Click es/123. Visit www.vias.es and www.grupocobra.com 12/06.Sacyr, Castromil and Transportes La Union received a EUR42 million contract to build, maintain and operate a three-basement transport interchange in Plaza Eliptica, including an entrance and exit tunnel in Via Lusitana, 2 x 255.8 m with a section of 70 sq m and inner diameter of 8 m including pavements, a twin entrance tunnel in Avenida Princesa Juana de Austria, 143.8 m x 57.76 sq m (6 m inner diameter including pavements) and 202.3 m x 112.36 sq m (8 m inner diameter including pavements) and a twin exit tunnel of 103.4 m x 57.76 sq m (6 m inner diameter with pavements) and 208.1 m x 112.36 sq m (8 m inner diameter with pavements). Cut-and-cover method. Click es/123. Visit www.gruposyv.com 12/06.



Permalink

Spain, Aragon - es/122

Water

Necso and Sacyr secured a EUR128.9 million contract from the Ministry of environment to design and build the Mularroya dam. The project mainly consists of a dam, with a capacity of 103 cubic hectometres to store water from the Jalon river, and a 12,816 m transfer tunnel from the Jalon to the Grio river. The time frame for construction alone is 90 months, not to mention the time necessary for design and filling of the dam after completion. Entry in service not before 2015. Visit www.necso.es and www.gruposyv.com 51-52/04.



Permalink

Prior information notice for planning the necessary actions to be able to move forward with the excavation of the hydraulic tunnel between the Grío and Jalon rivers, in those sections with high water inflows that could compromise the safety of the workers, and to ensure the water tightness of the tunnel once its excavation is completed. Estimated date of publication of contract notice: 01/09/2022. Value of the contract is EUR3.3 million, excluding VAT. Duration of the contract is 18 months. Contact Ministerio para la Transicion Ecologica y el Reto Demografico, attn Gema T. Torres Sanchez , Madrid, tel +34 915975738, fax +34 915975909,  email Bzn-licitacionessgpe@miteco.es mailto:Bzn-licitacionessgpe@miteco.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=167524-2022. Ref.n. 09.130-0166/2111. 13/22.

Spain-Madrid: Engineering works and construction works

2022/S 065-167524

Prior information notice

This notice aims at reducing time limits for receipt of tenders

Works

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Ministerio para la Transición Ecológica y el Reto Demográfico, Dirección General del Agua, Subdirección General de Programación y Gestión Económica y Presupuestaria
National registration number: S2800556I
Postal address: Plaza de San Juan de la Cruz s/n
Town: Madrid
NUTS code: ES España
Postal code: 28071
Country: Spain
Contact person: Gema T. Torres Sánchez
E-mail: Bzn-licitacionessgpe@miteco.es
Telephone: +34 915975738
Fax: +34 915975909
Internet address(es):
Main address: http://contrataciondelestado.es/wps/portal/plataforma
I.5)Main activity
Environment

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

PROYECTO DE TRATAMIENTOS ADICIONALES EN EL TUNEL HIDRAULICO JALON-GRIO TT.MM. DE MORATA DE JALON, EL FRASNO, PARACUELLOS DE LA RIBERA Y CALTAYUD

Reference number: 09.130-0166/2111
II.1.2)Main CPV code
45220000 Engineering works and construction works
II.1.3)Type of contract
Works
II.1.5)Estimated total value
Value excluding VAT: 3 305 785.12 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ES243 Zaragoza
II.2.6)Estimated value
Value excluding VAT: 3 305 785.12 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 18
II.3)Estimated date of publication of contract notice:
01/09/2022

Section IV: Procedure

IV.2)Administrative information
IV.2.5)Scheduled date for start of award procedures:

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
28/03/2022



Permalink


The Mularroya Joint Venture from Alcobendas (Madrid) have secured the EUR6.78 million contract, excluding VAT, for the additional works on the hydraulic tunnel Jalom-Grio TT.MM. in Morata de Jalon. Contact Direccion General del Agua, Madrid, tel +34 915976363, fax +34 915975909, email bzn-licitacionessgpe@miteco.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=731368-2022. Ref.n. 09.130-0166/2112. 52/22.  



Permalink

Spain, Madrid - es/121

Tramway

Open call for tenders, deadline 6th October, 2004 for construction of section 1 of the Pinar de Chamartin-Sanchinarro-Las Tablas tramway line. 70% of this 5.3 km line will travel underground, with 10 stations. Tender budget: EUR65 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=146546-2004, OJ S 170, or contact Mintra, Alcorcon, fax +34 914880098 or 914880598. 37/2004.Open call for tenders, deadline 6th October, 2004 for construction of section 2 of the Pinar de Chamartin-Sanchinarro-Las Tablas tramway line. 70% of this 5.3 km line will travel underground, with 10 stations. Tender budget: EUR77.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=146544-2004, OJ S 170, or contact Mintra, Alcorcon, fax +34 914880098 or 914880598. 37/2004.Open call for bids, deadline 22nd October, 2004 for quality management during construction of the infrastructure of the new tram line Pinar de Chamartin-Sanchinarro-Las Tablas, section 1. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=157384-2004, OJ S 184, or contact Mintra, Alcorcon, fax +34 914880598. 40/04.Open call for bids, deadline 21st October, 2004 for work inspection and monitoring during construction of the infrastructure of the new tram line Pinar de Chamartin-Sanchinarro-Las Tablas, section 1. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=157385-2004, OJ S 184, or contact Mintra, Alcorcon, fax +34 914880598. 40/04.Open call for bids, deadline 22nd October, 2004 for quality management during construction of the infrastructure of the new tram line Pinar de Chamartin-Sanchinarro-Las Tablas, section 2. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=157387-2004, OJ S 184, or contact Mintra, Alcorcon, fax +34 914880598. 40/04.Open call for bids, deadline 21st October, 2004 for work inspection and monitoring during construction of the infraestructure of the new tram line Pinar de Chamartin-Sanchinarro-Las Tablas, tramo 2. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=157390-2004, OJ S 184, or contact Mintra, Alcorcon, fax +34 914880598. 40/04.



Permalink

Spain, Canary Islands - es/120

Highway

Open call for bids, deadline 10th September, 2004 for design of the outer bypass in the Santa Cruz de Tenerife metropolitan area. A 850 m twin-tube tunnel is planned to cross the Terremoto mountain, a second twin bored tunnel, 300 m in length, will run below the airport runway and two cut-and-cover tunnels, accomodating two or three lanes and totalling 1 km, will also be required. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123122-2004, OJ S 143, or contact Autonomous Community of the Canary Islands, Santa Cruz de Tenerife, fax +34 922475088. 33-34/04.Estudio 7, Teno Ingenieros and Intecsa-Inarsa secured a EUR1 million contract for design of the outer bypass in the Santa Cruz de Tenerife metropolitan area, including a 850 m twin-tube tunnel to cross the Terremoto mountain, a second twin bored tunnel, 300 m in length, below the airport runway and two cut-and-cover tunnels, to carry two or three lanes, spanning 1 km. Visit www.estudio7.es and www.intecsa-inarsa.es 06/05.Open call for tenders, deadline 17th November, 2006 for design of the El Tanque-Santiago del Teide section to close the Tenerife ring road. The section is a bypass of road C-820 and includes a 2 x 5 km tunnel. The tunnel will be 7 m wide, with 1 m-wide pavements on each side. It will carry two lanes but only one lane will be used in each tube, the second lane being reserved for emergency until when the highway is completed and operated as a real highway according to traffic needs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=195621-2006, OJ S 184, or contact Autonomous community of Canaries, Santa Cruz de Tenerife, tel. +34 922475244. 45/06.Open call for tenders, deadline 20th November, 2006 for design of the north ring road of the Santa Cruz de Tenerife metropolitan area to La Laguna. The section includes six wide single bored tunnels, each carrying four lanes per tube (approx. lengths: 300 m, 300 m, 400 m, 300 m, 300 m and 200 m). There is also a 2 x 800 m tunnel, with two lanes per tube. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=196581-2006, OJ S 185, or contact Autonomous community of Canaries, Santa Cruz de Tenerife, tel. +34 922475244. 45/06.Tecamac secured a EUR2.2 million contract to design the El Tanque-Santiago del Teide section to close the Tenerife ring road. The section is a bypass of road C-820 and includes a 2 x 5 km tunnel. The tunnel will be 7 m wide, with 1 m-wide pavements on each side. It will carry two lanes but only one lane will be used in each tube, the second lane being reserved for emergency until when the highway is completed and operated as a real highway according to traffic needs. Visit www.tecamacsa.com 12/07.Open call for tenders, deadline 16th July, 2007 for construction of the Icod de los Vinos-El Tanque section on the new Icod de los Vinos-Santiago del Teide highway, the so-called insular ring north of Tenerife Island. This 12 km two-lane dual carriageway is budgeted at EUR164.9 million and will take 48 months to build. In Valle de Icod, there will be eight cut-and-cover tunnels and the 1,217 m-long La Vega tunnel. There will be also three cross passages with exit to the nearby cliff and wide lay-bys. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=117706-2007, OJ S 96, or contact Autonomous community of Canaries, Santa Cruz de Tenerife, fax +34 922246274. 22/07.A joint venture formed by Acciona Infraestructuras, Ferrovial Agromí¡n, Bruesa Construccií³n, Mejí­as y Rodrí­guez, and VVO has been entrusted with the construction of the new road link from Icod de Los Vinos to El Tanque. The contract is worth EUR120.9 million and construction will take 31 months. This 12 km section forms part of Tenerife Island's ring road. From Icod de los Vinos to Santiago del Teide, the existing C-820 road is very sinuous, narrow, dangerous and does not meet mobility needs. The new road will serve Buen Paso, where a short cut-and-cover tunnel will be built. In the Icod valley, the road will pass through eight twin cut-and-cover tunnels. To cross the escarpment that closes the Icod valley to the west and protect the landscape of La Culata cliffs, a 1,217 m twin bore tunnel will be constructed in La Vega. The La Vega tunnels will be connected by three cross-passages with exits to the nearby cliffs and will be equipped with widened lay-bys. Visit www.acciona-infraestructuras.es, www.ferrovial.es and www.bruesa.com 21/08.Applus Norcontrol and Tecamac signed a EUR3.4 million contract for construction management of the Icod de los Vinos-El Tanque section, including nine cut-and-cover tunnels and the 1,217 m La Vega tunnel. Visit www.appluscorp.com and www.tecamacsa.com 21/08.



Permalink

The JV Teno Ingenieros, S.L./Geocontrol, S.A. (Santa Cruz de Tenerife) secured the EUR390,113 contract for the construction design of the second tube of El Bicho tunnel (1,320 m) on the Santiago del Tiede-Adeje new road. For more on the project click here. Contact Bienvenido Crespo at Autonomous community of Canaries in Santa Cruz de Tenerife, tel +34 922475-179, fax -088. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=025950-2010. 06/10.



Permalink

The JV FCC Construccion, El Silbo Construcciones y Obras and Syocsa-Inarsa from  Las Palmas de Gran Canaria secured the EUR225.70 million contract, excluding VAT,  for the last 11.3km section from El Tanque to Santiago del Teide of the Tenerife’s motorway ring road. The new section will include the 5km Erjos tunnel. Contact Consejeria de Obras Publicas y Transportes del Gobierno de Canarias,  Las Palmas de Gran Canaria, tel +034 922924916, fax +034 922924891, email srvconadm.copt@gobiernodecanarias.org. for tender information please click here

Ref.n. OP-06/2018. 48/19.



Permalink


The JV Anillo Insular from Santander, composed of WSP SPAIN-APIA Sau and ESTUDIO  7 SL secured the EUR 4.31 million contract, excluding VAT,  for control and supervision services during the construction of the last 11.3km section from El Tanque to Santiago del Teide part of Tenerife’s motorway ring road. The new section will include the 5.1km Erjos twin-tube tunnel. Contact Consejeria de Obras Publicas y Transportes del Gobierno de Canarias,  Las Palmas de Gran Canaria, tel +034 922924916, fax +034 922924891, email srvconadm.copt@gobiernodecanarias.org. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=675294-2021. Ref.n. 201902TFDISE. 01/22.



Permalink

Spain, Gibraltar Strait - es/119

Railway

Open invitation to tender, deadline 5th September, 2004 for execution of seven boreholes for geological investigation totalling 1,750 m in length at a maximum water depth of 300 m and with maximum penetration of 350 m below the seabed. These boreholes are part of the planned fixed link in tunnel across the Gibraltar Strait between Spain and Morocco. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107796-2004, OJ S 127, or contact Seceg, Madrid, fax +34 915796086. E-mail correo@secegsa.com 29/04.Qualification system, deadline 19th January, 2006 for preliminary design and environment impact study for the Gibraltar fixed link between Spain and Morocco. Click here and read E-News Weekly 30/2005 & 5/2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=232324-2005, OJ S 235, or contact SECEG, Madrid, fax +34 915796086. E-mail froca@secegsa.com 02/06.A JV of Typsa, Lombardi, Ingema and Geodata has won the contract for the preliminary design and environment impact study for the 40 km railway tunnel between Europe and Africa running under the Strait of Gibraltar. Typsa leads and manages the JV and is responsible for the EIS while Lombardi is the leader for the technical project. The JV has one year to draw up the plans for one of the most complex projects of its kind ever. Preliminary studies should be finished by 2008. If the project goes ahead, it will be a close cousin of the Eurotunnel that runs under the Channel between France and Britain. Running at depths of 300 to 600 metres, it will connect Tarifa in Spain to Tangiers in Morocco. A 4.8 m-wide service tunnel will be built first. This tube should help the engineers figure how much water might leak into the tunnel. The pressure on the tunnel will be huge, approximately 500 tonnes per square metre, so powerful pumps will be needed to avoid it filling up with water. Another problem is the risk of earthquakes in an active seismological zone. Read E-News Weekly 30/2005 & 5/2005. Click here. Visit www.typsa.es, www.lombardi.ch, www.ingema.co.ma and www.geodata.it 41/06.Open invitation to tender, deadline 30th June, 2008 on the technical and financial aspects related to the long horizontal (approx. 5,000 m) and/or vertical geological and geotechnical exploratory boreholes of the deep zone (300 m of water, maximum penetration of 250 m and extraction of samples of about 100 mm in diameter) along the path of the planned tunnel under Gibraltar Strait. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=144954-2008, OJ S 108, or contact SECEG, Madrid, tel. +34 915720088. E-mail rdzoido@secegsa.com 24/08.



Permalink