Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Brenner - it/103

High Speed Railway

Open call for bids, deadline 3rd June, 2004 for nine vertical and inclined core drills, 400 to 1,200 m long, and tests between the Val di Vizze in Italy and the Italian-Austrian border as part of the Brenner base tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=076894-2004, OJ S 96, or contact Brenner Basistunnel EWIV, Innsbruck, fax +43 5124030110. E-mail heimo.krassnitzer@bbt-ewiv.com 22/04.Negotiated procedure, deadline 31st January, 2005 for checking of the final design project for the Brenner base tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=205187-2004, OJ S 238, or contact Brenner Basistunnel, Innsbruck, fax +43 5124030110. E-mail heimo.krassnitzer@bbt-ewiv.com 51-52/04.The BBT JV set up by Foralith, Plankel, and Grund- Pfahl- und Sonderbau secured a EUR11.8 million contract for nine vertical and inclined core drills, at depths of 400 to 1,200 m, and tests between the Val di Vizze in Italy and the Italian-Austrian border as part of the Brenner base tunnel. Visit www.foralith.ch, www.plankel.at and www.gps-bau.com/home.htm 12/05.Open call for tenders, deadline 22nd June, 2005 for detailed geotechnical and geomechanical mapping in the zone of the Brenner base tunnel between Fortezza, Aica and Innsbruck. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=098897-2005, OJ S 99, or contact BBT SE, Innsbruck, fax +43 5124030110. E-mail heimo.krassnitzer@bbt-se.com 22/05.ILF, TAE and EUT secured a EUR2.8 million contract for the final design of the Fortezza area of the Brenner base tunnel. The contract covers the 4.2 km section from the south portal to the Aica fork; the 4.8 km Aica service tunnel; bypasses to the existing line and connections; and redevelopment of Fortezza station. Visit www.ilf.com and www.eut.bz.it 38/05.Geoprojekt secured a EUR152,250 contract for detailed geotechnical and geomechanical mapping in the zone of the Brenner base tunnel, calibration and interpretation of the data by means of data derived from samples and achievement of geological and geomechanical modelling to characterise the rock mass. The contract also includes a 3D modelling of the stress fields of the entire corridor area. 45/05.The execution of geotechnical and geomechanical tests in laboratory on rocks and soils as well as geological tests in laboratory on surface rock samples or sample pieces has been commissioned to GD Test for EUR304,000. The most important tests are the geomechanical tests carried out on sample pieces selected from about 25,000 m of samples taken from the zone of the Brenner base tunnel project between Innsbruck and Fortezza. Visit www.gdtest.it 49/05.Checking the final projects of the Brenner base tunnel has been commissioned to Rabbit Rina Arsenal Brenner Basistunnel, a joint venture between Genoa-based Rina and í–sterreichisches Forschungs- und Prüfzentrum Arsenal from Vienna. Final projects means the environmental impact statement and the technical project for the Austrian section and the final project for the Italian section. Visit www.rina.org and www.arsenal.ac.at 49/05.Open call for tenders, deadline 15th February, 2007 for construction of a 10.4 km pilot tunnel between Aica and Mules in Bolzano province, south Tyrol, a 1.8 km access adit in Mules, a 400 m connecting tunnel between Aica / Unterplattner and Riga valley and processing and management of the excavated material. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=255287-2006, OJ S 239, or contact Galleria di Base del Brennero, Innsbruck, fax +43 5124030110. E-mail ava@bbt-se.com 51-52/06.Open call for tenders, deadline 2nd May, 2007 for on-site supervision and work management during construction of the 10.4 km pilot bore from Naz-Sciaves to chainage 10+400 in Bolzano province, the 1.8 km Mules access adit, a 400 m connecting tunnel between Aica and Riga valley, and preparation and management of excavated materials. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=69178-2007, OJ S 56, or contact Galleria di base del Brennero / Brenner basistunnel BBT, Innsbruck, fax +43 5124030110. E-mail ava@bbt-se.com 13/07.Open call for tenders, deadline 16th May, 2007 for environmental monitoring for the 10.4 km Aica-Mules pilot tunnel and its access adits in Bolzano province. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=90382-2007, OJ S 74, or contact Galleria di Base del Brennero / Brenner Basistunnel BBT, Innsbruck, fax +43 512 4030110. E-mail ava@bbt-se.com 17/07.Consortium ATB headed by Pizzarotti signed a EUR78.9 million contract to build a 10.4 km pilot tunnel between Aica and Mules in Bolzano province, south Tyrol, a 1.8 km access adit in Mules, a 400 m connecting tunnel between Aica / Unterplattner and Riga valley and processing and management of the excavated material, as part of the Brenner base tunnel project. Click here. Visit www.pizzarotti.it and www.bbt-ewiv.com 30/07.Consortium ATB, whose members are Pizzarotti, Condotte, SELI, Collini, Bilfinger Berger, Alpine Mayreder, Jaeger Bau and Beton- und Monierbau, has been awarded the contract to build the Aica-Mules access adit to the Brenner base tunnel and commissioned its construction to SELI using a TBM. SELI will supply the TBM and ancillary equipment, bore the tunnel and install the support. The excavated diameter is 6.3 m (31 sq m) and the finished inner diameter is 5.6 m. The main underground structure is the Mules access adit, 35 sq m in cross-section, 10% gradient and length of 1,800 m. This first lot will mainly cross the Bressanone granite, a hard rock formation generally of good quality. The high cover and the presence of faults and fractured zones could make tunnelling critical at certain spots. The consortium already owns the TBM (a Wirth machine previously used for the San Francisco project in Ecuador by Odebrecht) and is modifying its diameter and revising it in its facilities. Click ec/18 and here. The supply includes the a double shield rock TBM with back-up and conveyor belt for rock haulage. It is planned to install both precast concrete segments and traditional supports (bolts, wire mesh, steel arches and shotcrete). The rock haulage will be performed by means of a new conveyor belt supplied by Marti Technik. Tunnelling is programmed to commence in April 2008. Visit www.pizzarotti.it, www.condotte.it, www.impresacollini.it, www.selitunnel.com, www.bilfingerberger.de, www.alpine-bau.de, www.jaegerbau.com, www.bemo.net, www.wirth-europe.com and www.martitechnik.ch 46/07.Concer & Partners signed a EUR2.4 million deal for on-site supervision and work management during construction of the 10.4 km pilot bore from Naz-Sciaves to chainage 10+400 in Bolzano province, the 1.8 km Mules access adit, a 400 m connecting tunnel between Aica and Riga valley, and preparation and management of excavated materials. Visit www.concerepartners.it 50-51/07.The joint venture Wasserwirtschaftliche Beweissicherung Brenner Basistunnel and ILF Beratende Ingenieure ZT GmbH has secured the contract for monitoring water Phase IIA of the Brenner Base Tunnel. Contract value EUR1,675,865, duration 31 months. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=082648-2009, OJ S 58 and www.ilf.com. For more contact BBT SE, Dr. Kathrin Eberle in Innsbruck, tel +43 5124030, fax +43 5124030-110, e-mail ava@bbt-se.com. 15/09. Invitation to tender, deadline 10.09.2009, for the measurement of emissions before and during the construction exploration tunnels Innsbruck-Steinach-Ahrental and Wolf. Time limit 03.09.2009 for receipt of requests for documents or for accessing documents. Contract duration 60 days. Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200483-2009. 31/09.Invitation to tender, deadline 08.09.2009, for noise measurement, traffic surveys and site inspections before, during and after the construction of exploration tunnels Innsbruck-Steinach-Ahrental and Wolf. Time limit 01.09.2009 for receipt of requests for documents or for accessing documents. Contract duration 60 days. Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200484 -2009. 31/09.Invitation to tender, deadline 09.09.2009, for detection and monitoring of vibration and secondary airborne noise before and during construction of the Innsbruck-Ahrental and Steinach-Wolf sections. Time limit 02.09.2009 for receipt of requests for documents or for accessing documents. Contract duration 60 days. Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200485-2009 31/09.Invitation to tender, deadline 11.09.2009, to perform buildings certification and measurements of geodetic control (with technical assistance from a geologist) before, during and after construction work in Innsbruck-Ahrental and Steinach-Wolf sections. Time limit 04.09.2009 for receipt of requests for documents or for accessing documents. Contract duration 60 days. Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200486-2009. 31/09.First postponement of open invitation to tender for the management and geological documentation of Innsbruck-Ahrental running tunnel, part of Brenner base tunnel. Deadline now 25.08.2009. Time limit 18.08.2009 for receipt of requests for documents or for accessing documents. Contact Dr Johann Hager at BBT SE in Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com to whom tenders or requests to participate should be sent. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=217303-2009. 33/09.The JV Plankel/GPS/Tiefbohr of Gewerbepark 70, A-9710 Pöllan secured the contract n. B0041, value EUR1.1 million, for 23 short exploratory boreholes at the Austrian Brenner Base Tunnel section, Lot 1. Visit www.plankel.at, www.gps-bau.com and www.tiefbohr-robier.at. Geotec SpA.of Via G. Barbato 20, I-86100 Campobasso secured the contract n. B0051, value EUR1.1 million, for 22 short exploratory boreholes at the Italian Brenner Base Tunnel section, Lot 2. Visit www.geotecspa.com.For more information contact Dr Johann Hager, Galleria di Base del Brennero Brenner Basistunnel BBT SE, Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=295478-2009. 44/09.NUA Umweltanalytik GMBH, Südstadtzentrum 4, A-2344 Maria Enzersdorf secured the EUR730,000 contract for the measurement of emissions before and during the construction of exploration tunnels Innsbruck-Ahrental and Steinach-Wolf. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=335983-2009 and www.nua.co.at.JV Bernard/Gebauer/Intergeo, Bahnhofstrasse 19, A-6060 Hall in Tirol secured the EUR2,435,682 million contract for the management and geological documentation of Innsbruck-Ahrental running tunnel, part of Brenner base tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=335984-2009.IC Consulenten Ziviltechniker GesmbH, Schönbrunner Strasse 297, A-1020 Vienna, secured the EUR241,588 contract for detection and monitoring of vibration and secondary airborne noise before and during construction of the Innsbruck-Ahrental and Steinach-Wolf sections. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=336038-2009 and www.ic-group.org.JV Bernard/Speckbacher/Trigonos, Bahnhofstrasse 19, A-6060 Hall in Tirol secured the EUR606,597 contract to perform buildings certification and measurements of geodetic control (with technical assistance from a geologist) before, during and after construction work in Innsbruck-Ahrental and Steinach-Wolf sections. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=341874-2009.Contact for the above Brenner awards is Dr Johann Hager at BBT SE in Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com. 51/09.Award of contract, value EUR63,227,727 excluding VAT, for establishment of Ahrental access tunnel (2.42 km); Ahrental exploration adit (2.515 km); and continuous miner tunnels Innsbruck (2.815 km) and Sillschlucht (290 m) and associated works, to Arbeitsgemeinschaft Erkundungsstollen Brenner Nord of 1100 Wien. More from Dr Johann Hager at BBT SE in Innsbruck, tel +43 5124030, fax +43 5124030-110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=020235-2010. 04/10.AVD-AI JV of Dornbirn, Austria secured the EUR960,699 contract for geotechnical distortion measurements and geodetic control of Innsbruck-Ahrental running tunnel, part of Brenner base tunnel. Contact Dr Johann Hager at BBT SE in Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=022676-2010. 06/10.Vicenzetto Srl of Villa Estense have secured the EUR587,987 contract for test drilling and boring work in Brenner Base tunnel. Contact Johann Hager at BBT SE in Innsbruck, tel +43 5124030, fax +43 5124030-110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062301-2010 and www.vicenzetto.it. 10/10.



Permalink

Open invitation to tender, deadline 31.05.2011, for work supervision of the exploratory tunnel Periadriatica and preparatory field work. Contract value EUR3.8 million excluding VAT, duration 30+6 months. Time limit for accessing documents: 24.05.2011. For more contact Dr Johann Hager, BBT, Innsbruck, tel +43 51240-30, fax -30110, e-mail ava@bbt-se.com. Visit http://www.bbt-se.com/index.php?option=com_content&task=view&id=294&Itemid=225. Bid code AP119. 17/11.



Permalink

Open invitation to tender, deadline 21.06.2011, for construction of Brenner base tunnel exploratory drive in Periadriatic seam and preparatory works for construction of main buildings at adit mouth. Contract duration 890 days. Time limit for accessing documents 01.06.2011. Further information, specs and docs from Dr Johann Hager at BBT in Innsbruck, tel +43 51240-30, fax -30110, e-mail ava@bbt-se.com to whom tenders or requests to participate must be sent. Time limit for4 accessing documents 15.06.2011. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=136261-2011. Bid Code AP118. 18/11.



Permalink

Open invitation to tender, deadline 27.07.2011, for environmental monitoring during construction of Brenner base tunnel exploratory drive in Periadriatic seam, and preparatory works for construction of main buildings at Mules adit. Contract value EUR1,323,000 excluding VAT, duration 43 months. Further information, specs and docs from Dr Johann Hager at BBT in Innsbruck, tel +43 51240-30, fax -30110, e-mail ava@bbt-se.com to whom tenders or requests to participate must be sent. Time limit for accessing documents 20.07.2011. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=176307-2011. Bid Code AP121. 23/11.



Permalink

Deadline postponed to 14.07.2011 for open invitation to tender for construction of Brenner base tunnel exploratory drive in Periadriatic seam and preparatory works for construction of main buildings at adit mouth. Contract duration 890 days. Further information, specs and docs from Dr Johann Hager at BBT in Innsbruck, tel +43 51240-30, fax -30110, e-mail ava@bbt-se.com to whom tenders or requests to participate must be sent. Time limit for accessing documents 08.07.2011. Bid Code AP118. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=183824-2011. 24/11.



Permalink

Open invitation to tender, deadline 02.08.2011, for engineering support in design of works at the Italian Brenner Base Tunnel section. Contract value EUR350,000 excluding VAT duration 24 months. Time limit for receipt of requests for documents or for accessing documents26.7.2011.Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=191806-2011. Bid Code AP-132. 25/11.



Permalink

Award of contract, value EUR53,088,909 excluding VAT, to Consorzio Brennero 2011 of Bolzano for construction of Brenner base tunnel exploratory drive in Periadriatic seam and preparatory works for construction of main buildings at adit mouth. Contract duration 890 days. Further information from Dr Johann Hager at BBT in Innsbruck, tel +43 51240-30, fax -30110, e-mail ava@bbt-se.com. Bid Code AP118. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=325084-2011. 42/11.



Permalink

Award of contract, value EUR3,085,682 excluding VAT, to Consorzio Brennero Ingegneria of Bressanone for supervision work during the construction of Brenner base tunnel exploratory drive in Periadriatic seam and preparatory works for construction of main buildings at adit mouth. Contact Dr Johann Hager at BBT in Innsbruck, tel +43 51240-30, fax -30110, e-mail ava@bbt-se.com. Bid Code AP119. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=325400-2011. 43/11.



Permalink

The JV Pasquali Rausa Engineering Srl/Barbera e ingegneri medical associati secured the contract, value EUR155, 896 excluding VAT, for engineering support in design of works at the Italian Brenner Base Tunnel section. Moe from Dr Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=356040-2011. Bid Code AP-132. 47/11.



Permalink

Poyry Infra GmbH (Salzburg) secured the EUR843,963 contract, excluding VAT, for laboratory geological and geotechnical testing of rock and soil samples from the construction of the Brenner Base Tunnel. Contact Galleria di Base del Brennero Brenner Basistunnel BBT SE, attn Dr Johann Hager, Innsbruck, tel +43 5124030, fax +43 5124030110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=021653-2012 . 05/12.



Permalink

Open invitation to tender, deadline 25.07.2012, for design and engineering services for lots Mules II and Mules III of the Brenner Base Tunnel.

Contract duration 270 days, estimated value EUR28 million excluding VAT. Time limit for accessing documents 24.07.2012. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://www.bbt-se.com/it/tools/bandi-di-gara/?tx_wcausschreibung_pi1%5BshowUid%5D=52. Bid code AP/139. 17/12.



Permalink

Open invitation to tender, deadline 15.06.2012, for a framework agreement for engineering services supporting project preparation and development of numerical modeling for the design of underground and geotechnical structures in the Brenner base tunnel, Italian side, where the tunnel exploratory drive in Periadriatic seam is ongoing along with preparatory works for construction of main buildings at Mules adit. Contract value EUR300,000 excluding VAT, duration 36 months. Time limit for accessing documents 14.06.2012. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbt-se.com. Visit http://www.bbt-se.com/it/tools/bandi-digara/?tx_wcausschreibung_pi1%5BshowUid%5D=51. Bid Code AP/141. 17/12.



Permalink

Prior information notice for the project management service for Isarco underground crossing in Brenner Base tunnel. Two lots: n.1 for preliminary works, n.2 for main works. Value contract EUR8.5 million, excluding VAT, duration 78 months after award. Contact BBT SE, att.n Angelo Lombardi, Bolzano, tel +39 0471062210, fax +39 0471062211, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=352569-2012. 46/12.



Permalink

Open invitation to tender, deadline 20.02.2013, for project management of Isarco underground crossing in Brenner Base tunnel. Contract value EUR9 million, excluding VAT, duration 108 months after award. Time limit for receipt of requests for documents or for accessing documents 19.2.2013. Contact Avv. Arturo Piero Mazzucato, BBT SE, Bolzano, tel +39 0471062210, fax +39 0471062211, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=395453-2012. 50/12.



Permalink

Open invitation to tender, deadline 21.02.2013, for auditing services for the final design of Italian side lots of Brenner base tunnel. The services to be provided are divided into packets of certain and optional services. Contract value EUR1.5 million, excluding VAT, duration 84 months. Time limit for receipt of requests for documents or for accessing documents: 20.02.2013. Contact Brenner Basistunnel BBT SE, att.n Avv. Arturo Piero Mazzucato, Bolzano, tel +39 04710622-10, fax +39 04710622-11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=411315-2012. Bid Code n. AP158. 01/13. 



Permalink

Open invitation to tender, deadline 05.03.2013, for main control surveys services in Austrian design zone I of Brenner base tunnel. Contract value EUR368,000 excluding VAT, duration 72 months. Time limit for accessing documents: 28.02.2013. Contact Brenner Basistunnel BBT SE, att.n Arturo Piero Mazzucato, Bolzano, tel +39 04710622-10, fax +39 04710622-11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=035955-2013. Bid Code n. AP162. 06/13.



Permalink

The RTP led by Pro Iter srl (Milan) secured the EUR 9.87 million contract, excluding VAT, for design and engineering services for lots Mules II and Mules III of the Brenner Base Tunnel. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=172613-2013. Bid code AP/139. 22/13.



Permalink

Periodic indicative notice without call for competition for design and construction of Underpassing of Isarco River for Brenner Basis Tunnel. Three sub-lots for a total amount of EUR370 million, excluding VAT. Contact Brenner Basis Tunnel BBT SE, att.n Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471062210, fax +39 0471062211, e-mail ava@bbt-se.com.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=259861-2013. 32/13. 



Permalink

R.T.P. headed by Italferr SPA of Rome secured the EUR 7,690,500 contract, excluding VAT, for project management of Isarco underground crossing in Brenner Base tunnel. Contact Avv. Arturo Piero Mazzucato, BBT SE, Bolzano, tel +39 0471062210, fax +39 0471062211, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=298269-2013. 36/13.



Permalink

Open invitation to tender, deadline 07.01.2014, for design and construction of Underpassing of Isarco River for Brenner Basis Tunnel. Three sub-lots for a total amount of EUR365.3 million, excluding VAT. Time limit for receipt of requests for documents, or for accessing documents: 06.01.2014. Contact Brenner Basis Tunnel BBT SE, att.n Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471062210, fax +39 0471062211, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=328631-2013. Ref. n. AP174. 40/13.



Permalink

Italcertifer SpA of Florence secured the EUR433,500, excluding VAT, for auditing services for the final design of Italian side lots of Brenner base tunnel. The services to be provided are divided into packets of certain and optional services. Contact Brenner Basistunnel BBT SE, att.n Avv. Arturo Piero Mazzucato, Bolzano, tel +39 04710622-10, fax +39 04710622-11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=408926-2013. Bid Code n. AP158. 49/13.



Permalink

Open invitation to tender, deadline 01.09.2014, for geological and geotechnical laboratory testing. Contact Brenner Basis Tunnel BBT SE, att.n Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471062210 , fax +39 0471062211, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231772-2014. Ref. n. AP187. 28/14.



Permalink

The RTI Salini Impregilo SpA/Strabag AG-Strabag SpA/Consorzio Cooperative Costruzioni CCC Societa Cooperativa/Collini Lavori at Milan secured the EUR301,308,880 contract, excluding VAT, for design and construction of underpassing of Isarco River for Brenner Basis Tunnel. Three sub-lots. Contact Brenner Basis Tunnel BBT SE, att.n Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471062210, fax +39 0471062211, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=263148-2014. Ref. n. AP174. 32/14.



Permalink

Deadline postponed from 01.09.2014 to 22.09.2014 for the open invitation to tender for geological and geotechnical laboratory testing. Time limit for receipt of requests for documents, or for accessing documents: 21.09.2014. Duration of contract 48 months from award, value EUR1.5 million, excluding VAT. Contact Brenner Basis Tunnel BBT SE, att.n Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471062210 , fax +39 0471062211, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=279361-2014. Ref. n. AP187. 38/14.



Permalink

Open invitation to tender, deadline 10.12.2014, for the maintenance of the piezometric shafts installed by BBT SE and for the groundwater pollution monitoring along the new Brenner railway tunnel alignment. Value of contract EUR260,000, excluding VAT, duration 36 months from award. Time limit for receipt of requests for documents or for accessing documents: 09.12.2014. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 04710622-10, fax 39 04710622-11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=389802-2014. Ref.n. AP206. 49/14.



Permalink

The JV Poyry Infra Gmbh/Gdtest Srl of Salzburg secured the EUR764,619.40 contract, excluding VAT, for geological and geotechnical laboratory testing. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471062210, fax +39 0471062211, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=416095-2014. Ref. n. AP187. 49/14.



Permalink

Open invitation to tender, deadline 02.02.2015, for geological test drilling for the new Brenner railway tunnel. Value of contract EUR3.46 million, excluding VAT, duration 365 days from award. Time limit for receipt of requests for documents or for accessing documents: 01.02.2015. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 04710622-10, fax 39 04710622-11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=434978-2014. Ref.n. AP213. 01/15.



Permalink

The awarding procedure for the maintenance of the piezometric shafts installed by BBT SE and for the groundwater pollution monitoring along the new Brenner railway tunnel alignment has been declared unsuccessful. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 04710622-10, fax 39 04710622-11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=36934-2015. Ref.n. AP206. 06/15.



Permalink

The JV Ambiente Societa Cooperativa/Landi di Stefano Chiarugi & C. Sas of Carrara secured the EUR2,764,064.22 contract, excluding VAT, for geological test drilling for the new Brenner railway tunnel. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 04710622-10, fax 39 04710622-11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=74981-2015. Ref.n. AP213. 10/15.



Permalink

Periodic indicative notice (PIN) without call for competition for construction for Lot Mules 2-3 of the Brenner Base Tunnel. Contract duration 3,285 days from award, estimated value EUR1.35-1.45 billion excluding VAT. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=156356-2015. Ref.n. AP209. 19/15.



Permalink

Open invitation to tender, deadline 06.08.2015, for environmental monitoring during construction works in the area of Isarco River underpass for the new Brenner railway tunnel. Value of contract EUR1.42 million excluding VAT, duration 90 months from award. Time limit for receipt of requests for documents or for accessing documents: 05.08.2015. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 04710622-10, fax 39 04710622-11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=205786-2015. Ref.n. AP221. 25/15.



Permalink


Open invitation to tender, deadline 26.11.2015, for construction for Lot Mules 2-3 of the Brenner Base Tunnel. Contract duration 109 months from award, estimated value EUR1.37 billion, excluding VAT. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=274287-2015. Ref.n. AP209. 32/15.




Permalink


Invitation to tender, deadline 19.11.2015, for measurements (KTM) for distortions control and laser scanner reliefs (TSC) to control the correct construction of the cross sections of underground works in the Brenner Base tunnel, the lot is the Isarco underground crossing. The time limit is 18.11.2015 for receipt of requests for documents or for accessing documents. Contract duration will be 71 months from the award. Value contract EUR 2.46 million, excluding VAT. Contact Galleria di Base del Brennero, att.n avv. Arturo Piero Mazzucato, Bolzano, tel +39 047106-22/10, fax +39 047106-22/11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358321-2015. Ref.n. AP223. 42/15.




Permalink


Open invitation to tender, deadline 08.02.2016, for technical and inspection services for the Brenner Base Tunnel. Documents can be accessed up until 07.02.2016. The contract duration is 108 months from the award, the estimated value is EUR1.3 million, excluding VAT. Contact  Brenner Basis Tunnel BBT SE, attn Eng Alessandro Marottoli,  Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=440382-2015. Ref.n. AP237. 51/15.




Permalink


Open invitation to tender, deadline 26.02.2016, for environmental monitoring during  construction for Lot Mules 2-3 of the Brenner Base Tunnel. Time limit for accessing documents is up until 25.02.2016. Contract duration is 106 months from award, the estimated value is EUR7.19 billion, excluding VAT. Contact Brenner Basis Tunnel BBT SE, attn Avv. Alessandro Marottoli, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=462209-2015. Ref.n. AP236. 01/16.




Permalink


The temporary group composed of Multiproject Srl (mandataria), Veolia Water Technologies Italia SpA, Bioprogramm sc, Studio associate professionisti Geoconsulting int. and Site Srl at Gorizia have secured the EUR703,827 contract, excluding VAT, for environmental monitoring during construction works in the area of the Isarco River underpass for the new Brenner railway tunnel. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 04710622-10, fax 39 04710622-11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=463772-2016. Ref.n. AP221. 01/16.




Permalink


Geotec SpA from Campobasso secured the EUR1.88 million contract, excluding VAT, to measure (KTM) for distortion and to do laser scanner reliefs (TSC) to enable the correct construction of the cross sections of underground works in the Brenner Base tunnel, the lot is the Isarco underground crossing. Contact Galleria di Base del Brennero, att.n Arturo Piero Mazzucato, Bolzano, tel +39 047106-22/10, fax +39 047106-22/11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=4455-2016. Ref.n. AP223. 02/16.




Permalink


Open invitation to tender, deadline 04.04.2016, for static testing of the Brenner Base Tunnel for Lot Mules 2-3. Time limit for accessing documents is up until 03.04.2016. Contract duration is 108 months from the award, the estimated value is EUR560,000, excluding VAT. Contact Brenner Basis Tunnel BBT SE, attn Avv. Alessandro Marottoli, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=54136-2016 . Ref.n. AP241. 07/16.




Permalink


The joint venture of Astaldi spa, Ghella spa, Oberosler Cav Pietro, Cogeis spa and  PAC have been named  as the companies to be awarded  Lot Mules 2-3 for the Brenner Base Tunnel. As yet it cannot be confirmed until all the legal checks and requirements have been made and met. The joint venture offered EUR 992,934,000 for the project . For further information visit http://www.bbt-se.com/it/informazione/news-ed-eventi/detail/id/vorlaeufiges-ergebnis-der-ausschreibung-baulos-mauls-2-3/. 10/16.




Permalink


Open invitation to tender, deadline 26.04.2016, for the geotechnical measurements and laser scanner surveys for Lot Mules 2-3 of the Brenner Base Tunnel. The time limit for accessing the documents is up until the 25.04.2016. The contract duration is 42 months from award, the estimated value is EUR4.32 billion, excluding VAT. Contact Brenner Basis Tunnel BBT SE, attn Avv. Alessandro Marottoli, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=85905-2016. Ref.n. AP238. 11/16.




Permalink


Open invitation to tender, deadline 15.06.2016, for environmental services during  construction for Lot Mules 2-3 of the Brenner Base Tunnel. Time limit for accessing documents is up until the 14.06.2016. Contract duration is 84 months from award, the estimated value is EUR351,324.89, excluding VAT. Contact Brenner Basis Tunnel BBT SE, attn Avv. Alessandro Marottoli, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=143025-2016. Ref.n. AP242. 17/16.




Permalink


Open invitation to tender, deadline 15.01.2016, for safety coordination in the executive phase of Brenner Base Tunnel construction, Lot Mules 2-3. Time limit for receipt of requests for documents or for accessing documents: 14.01.2016. Duration contract 108 months from award. Value contract EUR5 million, excluding VAT. Contact Brenner Basis Tunnel, att.n Eng. Alessandro Marottoli, Bolzano, tel +39 0471062210, fax +39 0471062211, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=395008-2015. Ref.n. AP229. 46/15.




Permalink


The JV Sintel Engineering Srl (leader), Industrial Engineering Consultans, 3TI Progetti Italia — Ingegneria Integrata SpA, MC Engineering Srl from Rome secured the EUR 3.34 million contract, excluding VAT, for safety coordination in the executive phase of Brenner Base Tunnel construction, Lot Mules 2-3. Contact Brenner Base Tunnel, att.n Eng. Alessandro Marottoli, Bolzano, tel +39 0471062210, fax +39 0471062211, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=144743-2016. Ref.n. AP229. 17/16.




Permalink


Astaldi SpA — Ghella SpA — Oberosler Cav. Pietro Srl — Cogeis SpA — P.A.C. SpA from Rome secured the EUR 992.93 million contract, excluding VAT, for the construction of Lot Mules 2-3 of the Brenner Base Tunnel. Please contact Brenner Base Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=176243-2016. Ref.n. AP209. 21/16.




Permalink


Studio di Ingegneria Fragiacomo from Bolzano secured the EUR 222,000 contract, excluding VAT, for static testing of the Brenner Base Tunnel for Lot Mules 2-3. For further information contact Brenner Base Tunnel BBT SE, attn Avv. Alessandro Marottoli, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=179620-2016. Ref.n. AP241. 21/16.




Permalink


The joint venture of Multiproject Srl (leader), Studio associato professionisti Geoconsulting int., Bioprogramm sc, Veolia Water Technologies Italia SpA and Site Srl at Gorizia have secured the EUR 2.39 million contract, excluding VAT,  for environmental monitoring during  the construction for Lot Mules 2-3 of the Brenner Base Tunnel. Contact Brenner Base Tunnel BBT SE, attn Avv. Alessandro Marottoli, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=189893-2016. Ref.n. AP236. 23/16.




Permalink


No award made as there were no suitable offers for the open invitation to tender, deadline 08.02.2016, for technical and inspection services for the Brenner Base Tunnel. Contact  Brenner Basis Tunnel BBT SE, attn Eng Alessandro Marottoli,  Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visithttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=313567-2016. Ref.n. AP237. 37/16.




Permalink

ECO-TER Servizi Integrati per Ecologia and Territorio Srl from Pianoro secured the EUR207,650 contract, excluding VAT, for environmental services during  construction for the Brenner Base Tunnel lot mules 2-3. For further information please contact the Brenner Base Tunnel BBT SE, and ask for Avv. Alessandro Marottoli, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=315544-2016. Ref.n. AP242. 37/16.



Permalink

Abruzzo Test Srl from Sulmona secured the EUR498,120 contract, excluding VAT, for a laboratory and on-site testing on building materials to be used in the Isarco underground crossing lot for the Brenner Base tunnel. Contact BBT, att.n Arturo Piero Mazzucato, Bolzano, tel +39 047106-22/10, fax +39 047106-22/11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=409453-2016. Ref.n. AP227. 47/16.



Permalink

The joint venture of dott. ing. Angelo Pezzati (Mandatario) — dott. ing. Stefano Caldini — dott. ing. Michael Pfeifer from Florence secured the EUR1 million contract, excluding VAT, for the technical administrative testing (while in progress), for the construction works of lot Mules 2-3. For further information please contact Brenner Base Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471 0622-10, fax -11, e-mail ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=181138-2017. Ref.n. AP258. 20/17.



Permalink

The joint venture of Gruenenfelder und Partner AG - Studio Meier SA - Trigonos ZT GmbH - TOPOTEC GmbH from Domat/Ems secured the EUR1.07 million contract, excluding VAT, for Topographic Surveillance and surface measurements of part of the Brenner Base Tunnel. For further information please contact Brenner Base Tunnel BBT SE, attn eng. Alessandro Marottoli, Bolzano, tel +39 0471 0622-10, fax -11, email ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=378146-2017. Ref.n. AP251. 39/17.



Permalink

JV ILF Consulting Engineers Austria GmbH (mandataria) — ARGE Umwelt-Hygiene Ges.m.b.H. — Geoconsulting int. — Geo.zt GmbH–Poscher Beratende Geologen — EUT GmbH / Srl at Rum/Innsbruck secured the EUR9.26 million contract, excluding VAT, for the monitoring of water resources during the phase III of the Brenner Base Tunnel. The Phase III includes the construction of the main tunnels and the remaining sections of the exploratory tunnels leading the main tubes. Contact Brenner Base Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471 062210, fax 39 0471 062211, email ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=429434-2017.

Ref.n. AP268. 46/17.



Permalink

Open invitation to tender, deadline 10.04.2018, for  permanent fire protection during the construction phase of Brenner Base Tunnel construction, Lot Mules 2-3. Time limit for receipt of requests for documents or for accessing documents: 09.04.2018. Duration of the contract will be 62 months from award. Value of the contract is  EUR4.92 million, excluding VAT. Contact Brenner Base Tunnel, att.n Eng. Alessandro Marottoli, Bolzano, tel +39 0471062210, fax +39 0471062211, email ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=091038-2018.

Ref.n. AP284. 11/18.



Permalink

Open invitation to tender, deadline 22.07.2019, for geodetic monitoring in Val di Vizze. The contract concerns the completion of the installation and the subsequent management of a permanent and automated monitoring system with GNSS receivers and total robotic stations aimed at identifying possible surface movements in the Val di Vizze area affected by the underground excavation of the Brenner Base Tunnel (lot Mules 2-3. Duration of the contract will be 48 months. Value of the contract is  EUR750,000, excluding VAT. For bid documents https://www.bandi-altoadige.it where tenders must be sent. Contact Brenner Base Tunnel, Bolzano, tel +39 0471062210, fax +39 0471062211, email ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=285657-2019.

Ref.n. AP307. 26/19.



Permalink

Cae Spa from San Lazzaro di Savena (BO) secured the EUR524,250 contract, excluding VAT, for geodetic monitoring in Val di Vizze. The contract concerns the completion of the installation and the subsequent management of a permanent and automated monitoring system with GNSS receivers and total robotic stations aimed at identifying possible surface movements in the Val di Vizze area affected by the underground excavation of the Brenner Base Tunnel (lot Mules 2-3. Contact Brenner Base Tunnel, attn Eng Alessandro Marottoli, Bolzano, tel +39 0471062210, fax +39 0471062211, email ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=521245-2019 . Ref.n. AP307. 45/19.y



Permalink

Open invitation to tender, deadline 29/04/2020, for the geotechnical measurements and laser scanner surveys for Lot Mules 2-3 (Lot2) of the Brenner Base Tunnel. The contract duration is 36 months from award, the estimated value is EUR3,304,900.00 excluding VAT. Contact Brenner Basis Tunnel BBT SE, email bbt@bbt-se.com.  For tender information please click here Ref.n. AP321. 11/20.



Permalink

Postponed from 29/04/2020 to 15/06/2020 the deadline of the open invitation to tender  for the geotechnical measurements and laser scanner surveys for Lot Mules 2-3 (Lot2) of the Brenner Base Tunnel. The contract duration is 36 months from award, the estimated value is EUR3,304,900.00 excluding VAT. Contact Brenner Basis Tunnel BBT SE, email bbt@bbt-se.com. For tender information please click here Ref.n. AP321. 20/20.




Permalink


The contract for the geotechnical measurements and laser scanner surveys for Lot Mules 2-3 (Lot2) of the Brenner Base Tunnel is not awarded. Contact Brenner Basis Tunnel BBT SE, email bbt@bbt-se.com.  For tender information please click here.  Ref.n. AP321. 53/20. 

 




Permalink


e-Geos SpA from Matera (MT) secured the EUR319,000 contract, excluding VAT, for the monitoring  by satellite radar interferometry of the Val di Vizze-Brenner border section affected by the underground excavation of the Brenner Base Tunnel (lot Mules 2-3). Contact Brenner Base Tunnel, Bolzano, email bbt@bbt-se.com. For further on the tender, please click here. Ref.n. AP308. 05/21. 

 




Permalink


The consortium Pini Swiss Engineers Srl from Lomazzo, Pini Swiss Engineers SA di Lugano, Sintel Engineering Srl from Rome, TIB consulting engineering GmbH from Bressanone and Geologia Applicata Studio Associato from Mezzocorona secured the EUR 599,908 contract, excluding VAT, for engineering services to support the internal structures of BBT SE in civil works and safety design and in the development of geological, geomorphological and hydrogeological studies for soil characterization. Contact Galleria di Base del Brennero, Bolzano, email ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=452582-2021. Ref.n. AP344. 36/21. 



Italy-Bolzano: Engineering services

2021/S 173-452582

Contract award notice – utilities

Results of the procurement procedure

Services

Legal Basis:

Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses

Official name: Brenner Basistunnel BBT SE
Postal address: Bahnhofplatz 1
Town: Bozen
NUTS code: ITH10 Bolzano-Bozen
Country: Italy
E-mail: ava@bbt-se.com
Internet address(es):
Main address: www.bandi-altoadige.it
Address of the buyer profile: www.bbt-se.com

I.6)Main activity

Other activity: Engineering

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

AP344 - RAHMENVEREINBARUNG FÜR DIE UNTERSTÜTZUNG BEI DER PLANUNG

II.1.2)Main CPV code

71300000 Engineering services

II.1.3)Type of contract

Services

II.1.6)Information about lots

This contract is divided into lots: no

II.1.7)Total value of the procurement (excluding VAT) (Agree to publish? yes)

Value excluding VAT: 346 566.85 EUR

II.2)Description

II.2.2)Additional CPV code(s)

71300000 Engineering services

II.2.3)Place of performance

NUTS code: ITH10 Bolzano-Bozen

Section IV: Procedure

IV.2)Administrative information

IV.2.1)Previous publication concerning this procedure

Notice number in the OJ S: 2021/S 072-184690

Section V: Award of contract

Lot No: 1

Title:

AP344 - RAHMENVEREINBARUNG FÜR DIE UNTERSTÜTZUNG BEI DER PLANUNG

A contract/lot is awarded: yes

V.2)Award of contract

V.2.1)Date of conclusion of the contract:

26/08/2021

V.2.2)Information about tenders

Number of tenders received: 5

The contract has been awarded to a group of economic operators: yes

V.2.3)Name and address of the contractor

Official name: PINI SWISS ENGINEERS S.R.L.
Postal address: Bahnhofplatz 1
Town: Lomazzo (CO)
NUTS code: ITC42 Como
Postal code: 22074
Country: Italy

The contractor is an SME: yes

V.2.3)Name and address of the contractor

Official name: PINI SWISS ENGINEERS S.A.
Postal address: Bahnhofplatz 1
Town: Lugano
NUTS code: CH0 Schweiz / Suisse / Svizzera
Postal code: 6900
Country: Switzerland

The contractor is an SME: yes

V.2.3)Name and address of the contractor

Official name: SINTEL ENGINEERING S.R.L.
Postal address: Bahnhofplatz 1
Town: Roma
NUTS code: ITI43 Roma
Postal code: 00198
Country: Italy

The contractor is an SME: yes

V.2.3)Name and address of the contractor

Official name: TIB consulting engineering GmbH
Postal address: Bahnhofplatz 1
Town: Brixen
NUTS code: ITH10 Bolzano-Bozen
Postal code: 39042
Country: Italy

The contractor is an SME: yes

V.2.3)Name and address of the contractor

Official name: GEOLOGIA APPLICATA Studio Associato
Postal address: Bahnhofplatz 1
Town: Mezzocorona
NUTS code: ITH20 Trento
Postal code: 38016
Country: Italy

The contractor is an SME: yes

V.2.4)Information on value of the contract/lot (excluding VAT) (Agree to publish? yes)

Initial estimated total value of the contract/lot: 599 908.00 EUR

Total value of the contract/lot: 346 566.85 EUR

V.2.5)Information about subcontracting

Section VI: Complementary information

VI.5)Date of dispatch of this notice:

02/09/2021



Permalink


S.I.A. Servizi per Ingegneria e Ambiente srl from Sant'agata de' goti (BN) secured the EUR 245,271.27 contract, excluding VAT, for short geognostic surveys, with a 50 m maximum depth, to be carried out in various construction sites for the Brenner Base Tunnel - Italian section. Contact Brenner Base Tunnel, Bolzano, email bbt@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=009826-2022. Ref.n. AP316. 01/22.



Permalink

 

Restricted invitation to tender, deadline 18/07/2022, for the engineering services for the railway equipment in the Brenner Base Tunnel infrastructure project. The engineering services relate to planning services for the railway equipment and also include supporting activities in the installation phase of the facilities up to their operational launch. The railway equipment therefore includes all technical facilities and installations for future railway operations. After completion of the civil engineering works, the necessary technical equipment will be installed. This includes, among others, ballast less track, railway traction power supply, telecommunication and radiocommunication systems, signal boxes for command, control and train protection systems, modern control engineering, ventilation equipment and safety equipment. For tender documents please click here, where tenders must be sent. The contract duration is 10 years, the estimated value is EUR51.39 million excluding VAT. Contact Brenner Basis Tunnel BBT SE, email ava@bbt-se.com.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=303170-2022.  Ref.n. AP257. 24/22.

 




Permalink


The restricted invitation to tender for the engineering services for the railway equipment in the Brenner Base Tunnel infrastructure project has been discontinued and the contract was NOT AWARDED. For further information please click here and contact Brenner Basis Tunnel BBT SE, email ava@bbt-se.com.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=643852-2022.  Ref.n. AP257. 47/22.





Permalink

Italy, South Tyrol - it/102

Road

Open call for bids, deadline 25th May, 2004 for construction of a 1,215 m single-tube 14 m-diameter tunnel on the Faver bypass to road SS 612 in Val di Cembra. Drill/blast method. Support with shotcrete, 5 m-long Super Swellex bolts, lattice girders or steel arches every metre. 50 cm-thick reinforced concrete layer as final lining. Work start in February 2005 for completion in May 2006. Estimated cost: EUR24.6 million financed by Trento autonomous region. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=052763-2004, OJ S 62, or contact Provincia Autonoma di Trento, Trento, fax +39 0461496460. E-mail paolo.fontana@provincia.tn.it 18/04.Cossi Costruzioni secured a EUR20.3 million contract to build the 1,620 m Faver bypass on road SS 612 in Cembra valley, Trento province. The project mostly runs underground, in a 1,215 m-long 9.8 m-wide two-lane tunnel featuring a minimum headroom of 4.75 m. The bored length is 1,190.84 m, the remaining length being cut-and-cover portals. Drill/blast method with shotcrete, 5 m-long Super Swellex bolts, lattice girders or steel arches every metre for support and 50 cm-thick reinforced concrete layer for final lining. The bypass includes two north and south slip roads. Estimated time frame for construction: 1,250 days. Visit www.cossi.com 19/05.



Permalink

Italy, Calabria - it/101

Road

Accelerated restricted procedure, deadline 5th May, 2004 for construction of lots IV and IV bis of the Trasversale delle Serre in Catanzaro province including 2.5 km of tunnel, whereof three two-way single bore tunnels totalling 1,242 m and seven cut-and-cover tunnels for the remaining length. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=055457-2004, OJ S 65, or contact ANAS, Rome, fax +39 064454956. Visit www.stradeanas.it 16/04.Technital, 3TI Progetti and Alpina have pocketed a contract for the detailed design and environment impact study as part of the upgrading of road SS 106 Jonica, section Squillace-Simeri Cricchi, lots 1 to 5, and the extension to road SS 280 Due Mari. The 22.4 km road, whereof 17.2 km for SS 106 and 5.2 km for SS 280, includes 11 tunnels and will cost EUR740 million to build. Visit www.technital-spa.com, www.3tiprogetti.it and www.alpina-spa.it 27/04.Condotte secured a nearly EUR84 million contract to build section 2 of the Palizzi bypass on trunk road SS 106 Jonica in Catanzaro province. The job requires four twin bored tunnels in Palizzi (427.71 m / 387.4 m), Ambusena (111.7 m / 67 m), Peristeri (969.4 m / 993.5 m) and San Antonino (632.6 m / 629.4 m). Support with steel-reinforced shotcrete combined with Swellex bolts, steel arches, and fore piling. Subscribe to E-News Weekly 27/2004. Visit www.condottespa.it 51-52/04. Accelerated restricted procedure, deadline 30th March, 2005 for construction of the 4.1 km Marina di Gioiosa Jonica outer bypass on SS 106. It is a dual carriageway carrying two 3.75 m-wide lanes and two shoulders (1.75 m and 0.5 m) in each sense. The project includes three bored tunnels: Pantalogna (470 m / 461 m), Schiavo 1 (210 m / 170 m) and Schiavo 2 (503 m / 479 m) and the 216 m Romano cut-and-cover tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=037332-2005, OJ S 39, or contact ANAS, Rome, fax +39 064454956. 11/05.Torno Internazionale, its affiliate Rabbiosi, SIG and Tecnovese clinched a EUR124 million deal to build contracts IV and IV bis of the Trasversale delle Serre in Catanzaro province including 2.5 km of tunnel, whereof three two-way single bore tunnels totalling 1,242 m and seven cut-and-cover tunnels for the remaining length. Visit www.torno.com 15/05.A consortium of Via Ingegneria, Cooprogetti and Girpa for the design and Immobilgi Federici Stirling, DE.MO.TER. and Fondazioni Speciali-Sicos for the civil works has been awarded a EUR76 million contract to build the 3.5 km Marina di Gioiosa Jonica bypass, including three twin bored tunnels: Pantalogna (460 m / 461 m), Schiavo 1 (210 m / 170 m) and Schiavo 2 (503 m / 479 m), and the Romano false tunnel (216 m). The bored tunnels will be dug in clay and marls, using an excavator equipped with hydraulic breaker and ripper. Canopies of steel pipes will previously be drilled around the tunnel contour by forepoling. The tunnel face will be supported by fibre glass nails, steel arches (double IPN 180) and fibre-reinforced shotcrete. Wire mesh will be installed at the portals. Click here. Visit www.immobilgi.com, www.demoter.net, www.fondazioni-speciali.com, www.cooprogetti.it and www.girpa.it 39/06.Anas, the operator of roads and motorways in Italy, has approved the construction project of the second mega lot of the new trunk road SS 106 on the Ionian coast, in Catanzaro province. The project consists in constructing a total of 22.4 km, namely the Squillace-Simeri Crichi section (17.2 km) and a new section on trunk road SS 280 "dei Due Mari" (5.2 km). The green light to the construction project means that the worksites will be opened in the next few weeks. A total of 11 tunnels will be built. The project has a total cost of EUR652.4 million. The final design and construction has been awarded to a JV of Astaldi and Nino Ferrari, who formed a company for the project named CO.MERI. Click here. Visit www.astaldi.com 50/06.



Permalink

Invitation to tender by restricted procedure, deadline postponed from 08.07.09 to 22.07.09, for the design and construction of Nova Siri bypass, 5.3 km, on SS 106 Ionica in municipalities of Nova Siri and Rotondella (MT) and Rocca Imperiale (CS). Duration of works 840 days, of which 120 days for design. Contract value EUR62.8 million, of which EUR12.2 million for underground works. Send tenders to Anas SpA, Direzione Generale, att.n Protocollo Generale, Rome, tel +39 0644464445, fax +39 0644462009/4456224. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=182517-2009 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=150182-2009 29/09.



Permalink

Restricted call for tenders, deadline 03.02.2012, for completing lot 2 of the Palizzi bypass on trunk road SS 106 Jonica in Catanzaro province, from Km 49+485 to Km 51+750. Contract value EUR90.3 million, of which EUR59.8 million for tunnelling (category OG4). Duration 950 days.Contact Anas SpA, Eng Sergio Serafino Lagrotteria, Rome, tel +39 06 490326, fax: +39 06 44462009, e-mail p.angiari@stradeanas.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=401177-2011. Bid Code n. CZ 09/11. 01/12.



Permalink

The JV Astaldi SpA (60%)/Impregilo SpA (40%) secured the EUR791 million contract for Mega lot 3 of SS 106 Jonica which comprises updating of 38 km of SS 106 from SS 534 to Roseto Capo Spulico, of which 13 km in tunnel. Contract duration 7 years and 8 months, of which 15 months for design. Visit www.astaldi.it and www.impregilo.it. 02/12.



Permalink

Open invitation to tender, deadline 15.12.2013, for structural and equipment upgrading in the 943 m-long bi-tube Sansinato tunnel on the SS 280 Dei Due Mari. Contract value EUR6.13 million, excluding VAT. Contact Anas SpA, Road Dept Calabria, att.n Eng. Angelo Gemelli, Catanzaro, tel +39 0961531039, fax +39 0961701121, e-mail p.gentile@stradeanas.it. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid= 356113-2013. Bid Code n. CZLAV015-13. 43/13.



Permalink

Postponed from 15.12.2013 to 28.01.2014 the deadline of the open invitation to tender for structural and equipment upgrading in the 943 m-long bi-tube Sansinato tunnel on the SS 280 Dei Due Mari. Contract value EUR6.13 million, excluding VAT. Contact Anas SpA, Road Dept Calabria, att.n Eng. Angelo Gemelli, Catanzaro, tel +39 0961531039, fax +39 0961701121, e-mail p.gentile@stradeanas.it. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=418320-2013. Bid Code n. CZLAV015-13. 50/13.



Permalink

De Nisi Tommaso of Filadelfia (VV) secured the EUR2.81 million contract, excluding VAT, for structural and equipment upgrading in the 943 m-long bi-tube Sansinato tunnel on the SS 280 Dei Due Mari. Contact Anas SpA, Road Dept Calabria, att.n Eng. Angelo Gemelli, Catanzaro, tel +39 0961531039, fax +39 0961701121, e-mail p.gentile@stradeanas.it. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=318570-2014. Ref. n. CZLAV015-13. 39/14.



Permalink

Open invitation to tender, deadline 20.05.09, for extraordinary maintenance of lighting equipment  in 1,420 m-long Castelsilano tunnel, on SS 107, in Cosenza province. Value contract EUR1,254,000. Duration contract 150 days. Contact Anas SpA, Calabria Road Dept, Bids & Contracts Office, Catanzaro,  tel 39 0961 531011, fax +39 0961 725106, e-mail CZ-GareContr@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/69150. Bid code n. LAV038-14. 06/15.



Permalink

The joint venture group, consisting of Pagano & Ascolillo SpA (Rome) / Eurowork Srl (Reggio Calabria) / Visco Daniele and Raffaele Snc (Prignano Cilento) has been awarded the contract, for the extraordinary maintenance work for road tunnel technology facilities. These facilities will be on the road network of ANAS SpA, Maintenance Centers 3-4 and SS 107 Silana-Crotonese and SS 280 of the Two Marines, Calabrian Traffic Compartment. Contact ANAS SpA, Rome, tel. +39 06490326, fax +39 064456224, email v.dambrosio@stradeanas.it. Connect to http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=432330-2017, GU S209. Rif.n. CZ 04/16. 47/17.



Permalink

Italy, Calabria - it/100

Railway

Restricted procedure, deadline 22nd March, 2004 for design and build contract for single-track bypass line between Lamezia Terme and Catanzaro Lido, section Settingiano-Catanzaro Lido. Includes three single-track tunnels in Planicello, Chiana Munda and Monaci. The Planicello tunnel is 336 m in length, whereof 208 m will be bored. Average cross section: 64 sq m. Full-face excavation with hydraulic hammer or bucket. Support with fibre-reinforced shotcrete. Reinforcement of the face and possibly the contours with fiberglass anchors. The Chiana Munda tunnel is 1,106 m in length, whereof 1,037.5 m will be bored. The Monaci tunnel is 1,415 m in length, whereof 1,325 m will be bored. Both feature a 59.4 sq m cross section and will be driven using an EPB TBM. Pliocene terrain consisting of clay and slow sands, excavation possibly under water table, and Miocene ground consisting of clay and conglomerates. 25 m overburden for TBM-driven tunnels (10 m at portals). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=030046-2004, OJ S 34, or contact Italferr, Rome, fax +39 0649752445. E-mail a.putaturo@mail.italferr.it 11/04.Maire Engineering, SELI and Maire Lavori pocketed a EUR97 million contract to design and build a single-track bypass line between Malezia Terme and Catanzaro Lido, section Settingiano-Catanzaro Lido. The section includes three single-track tunnels in Planicello (336 m), Chiana Munda (1,106 m ) and Monaci (1,415 m). Click it/100. Visit www.fiatengineering.com and www.selitunnel.com 08/05.



Permalink

Italy, Emilia Romagna-Liguria - it/99

Railway

Restricted procedure, deadline 22nd March, 2004 for design and build contract for dualling of the Parma-La Spezia railway between Solignano station and Osteriazza switch tower. Includes a 4,425 m-long single-tube dual-track tunnel, whereof 4,120 m will be bored. Height to crown is 5.2 m. Two drives using hydraulic hammers. No access adits or escape exits, the topography not permitting. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=029640-2004, OJ S 34, or contact Italferr, Rome, fax +39 0649752445. E-mail s.spositi@mail.italferr.it 11/04.Astaldi is the preferred contractor for the dualling of the Solignano-Osteriazza section on the Parma-La Spezia line, also known as Pontremolese. The EUR165 million contract requires the planning, construction and equipment of a 12 km section, including a 4.2 km twin-track tunnel and two cut-and-cover tunnels (160 m and 243 m) under Parma-La Spezia highway. Visit www.astaldi.com 14/05.



Permalink

Italy, South Tyrol - it/98

Road

Strabag won a EUR5.94 million contract to build the 2,150 m-long 5 m-wide pilot bore of the Faè tunnel between Cles and Mostizzolo in Trento province. This exploratory tunnel is to be driven parallel to the future tunnel and will be used as a service and escape gallery when the main tunnel opens. Strabag will use an open type hard rock TBM, already owned by the company, either an Atlas Copco MK15 or a Wirth. The safety coordination has been assigned to Ing. Piero Paolo Susano for EUR115,680. Tunnelling to start end of 2004. Time frame: 400 days. Read E-News Weekly 33/2003. Visit www.bauholding.at 10/04.



Permalink

Open invitation to tender, deadline 31.07.2012, for design and construction of Cles bypass on SS 43. Contract value EUR43 million. Contact Provincia autonoma di Trento, attn Rita Pancher, Trento, tel +39 04614964-44, fax -22, e-mail agenziaperiservizi@provincia.tn.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=101855-2012. 14/12.



Permalink

The JV Oberosler cav. Pietro (leader), Consorzio Cooperative Costruzioni, Collini Lavori, Consorzio Lavoro Ambiente, Covi Costruzioni, Misconel, and Tassullo Materiali secured the contract for design and construction of Cles bypass on SS 43. Contact Provincia autonoma di Trento, attn Rita Pancher, Trento, tel +39 04614964-44, fax -22, e-mail agenziaperiservizi@provincia.tn.it. Visit http://www.uffstampa.provincia.tn.it/csw/c_stampa.nsf?Open#comunicato&id=229F7CBE450287F7C1257B5F0050E778. 19/13.



Permalink

Italy, Veneto - it/97

Road

Open call for bids, deadline 5th April, 2004 for final design of a section of the Longarone bypass on road SS51 Di Alemagna. Includes the 1,813 m-long Castellavazzo tunnel, a single bored tunnel with two 3.75 m-wide lanes. Maximum width at the extrados: 10.25 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=024110-2004, OJ S 27, or contact Region of Veneto, Venice, fax +39 0412792259. E-mail trasporti@regione.veneto.it 10/04.Spea Ingegneria, Studio Zollet, Studio Modena Ingegneria and Studio Associato di Geologia Fenti have won a EUR215,670 contract for the final design of a section of the Longarone bypass on road SS51 Di Alemagna. This section includes the 1,813 m-long 10.25 m-wide Castellavazzo tunnel, a single bored tunnel with two 3.75 m-wide lanes. Visit www.spea-autostrade.it 38/04.



Permalink

Ivitation to tender using restricted procedure, deadline 05.10.2009, for design and construction of Lot 1 La Sega-Rindola of the Vittorio Veneto bypass on SS51 di Alemagna, Treviso province. Contract value EUR52 million, duration 1,215 days of which 120 days for design. The section, 2,350 m length, includes the rock tunnel Sant'Augusta (1,498 m) and the cut & cover tunnel Via Carso. For the alignment click here. For more information contact Dr Ing Nicola Prisco, Responsabile del Procedimento, ANAS, Rome, tel +39 (0)6490326, fax +39 (0)644462009/4456224, e-mail r.memoli@stradeanas.it. Send bids to ANAS, Servizio Gare, Direzione Generale Protocollo Generale, Via Monzambano 10, 00185 Rome. Bid code VE 13/09. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=219563-2009. 35/09.



Permalink

Open invitation to tender, deadline 04.03.2011, for painting and signalling renewal in 1,257.60 m Rucorvo-Macchietto tunnel (Lot 2), part of Castellavazzo-Macchietto section refurbishment on SS51 Alemagna. Contract value EUR130,483.46. For more contact Anas SpA, Veneto road dept, bid and contract unit, Venezia Mestre, tel +33 041 2911411, fax +33 041 5317321, e-mail ve-garecontr@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/34871. Bid code: VELAV12-11. 05/11.



Permalink

The JV Eureca Consorzio Stabile/Accisa/So.Co.Gen secured the contract for design and construction of Lot 1 La Sega-Rindola of the Vittorio Veneto bypass on SS51 di Alemagna in Treviso province. The 2.35 km-long section includes the rock tunnel Sant'Augusta (1,498 m) and the cut/cover tunnel Via Carso. Bid code VE 13/09. Visit www.stradeanas.it/index.php?/sala_stampa/comunicati_stampa/dettaglio/arg/comunicati/id/5110. 08/11.



Permalink

Open invitation to tender, deadline 25.03.2013, for the design of urgent safety improvement works, with vault consolidation and equipment updating in the 1,343m Col di Caralte tunnel on SS 51. Value contract EUR40,000. Contact Anas SpA, Venezia Department, Mestre, tel +39 (0)41 2911411, fax +39 (0)41 5317321. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/54427.  Bid Code n. 07-13. 12/13.



Permalink

Bolina Ingegneria SpA secured the EUR40,000 contract for the design of urgent safety improvement works, with vault consolidation and equipment updating, in the 1,343 m-long Col di Caralte tunnel on SS 51. Contact Anas SpA, Venezia Department, Mestre, tel +39 (0)41 2911411, fax +39 (0)41 5317321. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/56445. Bid Code n. 07-13. 21/13.



Permalink

The RT Esposito Mario/Cadore Asfalti Srl secured the EUR3,033,598 contract for safety improvement works, with vault consolidation and waterproofing in the 1,343 m-long Col di Caralte tunnel on SS 51. Contact Anas SpA, Venezia Department, Mestre, tel +39 (0)41 2911440, fax +39 (0)41 2911407, email ve-gare.contr@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/61877. Bid Code n. 43/2013. 49/13.



Permalink

Open invitation to tender, deadline 05.02.2015, for the last part of urgent safety improvement works, with consolidation and waterproofing of vault in the 1,343 m-long Col di Caralte tunnel on SS 51 (II Part). Value of contract EUR2,555,881.55, excluding VAT, duration 160 days. Contact Anas SpA, Veneto Roads Dept, Mestre, tel +39 041 2911400, fax +39 041 2911407, e-mail ve-garecontr@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/69492.  Bid Code n. 59-14. 06/15.



Permalink

Open invitation to tender, deadline 12.02.2015, for  extraordinary maintenance of equipment in tunnels on SS 51 Alemagna and SS 52 Carnica. Value of contract EUR1,020,000, excluding VAT, duration 120 days. Contact Anas SpA, Veneto Roads Dept, Mestre, tel +39 041 2911400, fax +39 041 2911407, e-mail ve-garecontr@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/69493.  Bid Code n. 60-14. 06/15.



Permalink

Italy, Piedmont - it/96

Road

Preinformation notice for construction of the 6,382 m-long Cossato-Vallemosso bypass to road SS 232 Panoramica Zegna, including five bored tunnels: La Volpe (122 m), Miola (187 m), Miola 2 (604 m), Ferrere (195 m) and Berchelle (897 m) and four short cut-and-cover tunnels: Ardemo (35 m), Ronco (61 m), Bassoleja (48 m) and Molina (120 m). All single tubes. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=009725-2004, OJ S 12, or contact Agenzia regionale delle strade del Piemonte, Turin, fax +39 0114323570. E-mail segretaria.generale@ares.piemonte.it 05/04.



Permalink

Italy, Modena-Lucca - it/95

Highway

Accelerated restricted procedure, deadline 25th February, 2004 for feasibility study for the Modena-Lucca highway between Emilia Romagna and Tuscany regions. The 115 km highway would cross the Appennines, starting in Campogalliano, crossing the Torrente Silico and Serchio valleys to link up with Ponte a Moriano in Tuscany. A total of 68 km of tunnels would be required. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=010873-2004, OJ S 13, or contact ANAS, Rome, fax +39 064454956. Visit www.stradeanas.it. Read E-News Weekly 38/2003. 05/04.Bonifica and CSST have secured a EUR200,000 contract for the feasibility study for the 115 km Modena-Lucca highway, which would need the building of some 68 km of tunnels. Visit www.bonifica.it 44/04.



Permalink

Italy, Sardinia - it/94

Road

Accelerated restricted procedure, deadline 13th January, 2004 for construction of the new SS 125 road Orientale Sarda, section Terra Mala-Capo Boi, Lot 1. Includes three bored tunnels: Arcu Sa Porta (2,635 m), Bruncu Su Campu (624 m) and Is Canaledus (290 m). Drill/blast method anticipated. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=217031-2003, OJ S 244, or contact ANAS, Rome, fax +39 06490326. Also visit www.stradeanas.it 02/04.Safab, Della Morte and GE.CO.PRE won a EUR49.5 million to build lot 1 of section Terra Mala-Capo Boi on road SS 125 Orientale Sarda in Sardinia. The 8.8 km-long 10.5 m-wide road includes three bored single-tube dual-lane tunnels: Arcu Sa Porta (2,635 m), Bruncu Su Campu (624 m) and Is Canaledus (290 m). Radius: 5.25 m. Tunnelling with a three-boom Atlas Copco jumbo. Visit www.safab.it, www.gecopre.it and www.atlascopco.com 04/05.Baldassini Tognozzi-Pontello secured a EUR20.8 million contract to build the third section, first and second stretches (3,547 m) between the Cardedu tunnel and south Barisardo on the east coast road SS 125 between Cagliari and Tortoli, subsection Tertenia-Tortoli. The project includes a 1.6 km single-tube tunnel, excavated section of 90 sq m. The geology is entirely composed of granitic rock with variable consistency. Drilling and blasting will be used on one drive with an Atlas Copco jumbo. The type of machine has yet to be decided. Forepoling support will be employed at the portals (300 metres in all). Since the rock is little weathered, Swellex type bolts are expected to be used, when necessary. Mucking-out with a loader and dumpers. Work to start in July 2006. Visit www.baldassinitognozzi.it, www.atlascopco.com and www.swellex.com 20/06.Further south, on subsection Terra Mala-Capo Boi, a JV of SAFAB, Della Morte and GE.CO.PRE. is building the first section (8,789 m) for EUR72.2 million. There are three single bored tunnels for a total length of approx. 3,500 m. The longest tunnel spans 2.7 km. The excavated section is 90 sq m. A 12 sq m parallel escape tunnel is envisaged although it was not planned in the original project. The geology is entirely granitic rock with variable consistency. To date, 250 metres of tunnel has been driven using a computerized Atlas Copco Boomer 353 for drilling prior to subsequent blasting. There is one drive and a second one is being discussed. Forepoling support at portals. The rock is much better than expected so that expansion shell anchored rockbolts and/or steel beams will be used in the worst situations. For mucking-out, a Cat 330 excavator and Volvo dumpers are used. Click it/94. Visit www.safab.it, www.gecopre.it, www.atlascopco.com and www.cat.com 20/06.Accelerated restricted procedure, deadline 28th December, 2007 for construction of the second lot on the Capo Boi-Terra Mala trunk section to substitute the so-called Orientale sarda road SS 125. This 6.6 km section includes three tunnels and a parallel safety tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=288230-2007, OJ S 237, or contact ANAS, Rome, fax +39 064456224 or 0644462009. E-mail r.memoli@stradeanas.it 52/07-01/08.Todini won the tender for the construction of the second lot of the Capo Boi-Terra Mala section on the bypass to road SS 125 along eartern Sardegna, between the Geremeas and Terra Mala junctions, in the province of Cagliari. The contract is worth EUR107.8 million, whereof EUR79.8 million (VAT not included). The section will provide a bypass to the existing route, particularly sinuous and difficult, to join the tourist resorts in the southeast of the island. Further to the notice to proceed from the owner, the company will move to the executive phase of the project (120 days), to be followed by approval from the owner (90 days). Construction will then commence, with targeted end in 2011. The project is financed by the region of Sardegna. Visit www.todini.itThis 6 km section includes mainly seven viaducts and three single tube tunnels: Marapintau (1,290 m), Murtineddu (2,590.5 m) and Is Stellas (212.5 m), with a cross-section of 112-124 square metres. Parallel to the Marapintau and Murtineddu tunnels, emergency galleries will also be built, stretching a total of 3,900 metres. Cross-passages will connect the main tunnels with the parallel emergency bores. The Marapiantau and Murtineddu tunnels will be bored from two drives (one after the other for Marapiantau and simultaneous for Murtineddu). The Is Stellas tunnel will be driven from one side.The tunnel route crosses predominantly a granitoid bedrock intercepting, at the portals, shallow layers of granite turned to sand as a result to weathering and a colluvial cover. The granitoid bedrock is interrupted by acid, basic dyke deposits.Excavation will take place mostly by means of hydraulic hammers as well as jumbos and explosives according to the nature of the ground at the face and a TBM for the parallel safety tunnels. For the main tunnels, it is planned to use full-face tunnel driving at each drive, with CAT 330 excavator equipped with Rammer G 90 hydraulic hammer and Krupp HM 2300 Marathon working tool as well as a two-boom Robodrill Pantofore 337 drill rig. The mucking-out will be performed by a CAT 950 wheeled loader and Iveco trucks. Different supports will be adopted according to the type of cross-section. At the portals, forepoles of 101.6 m-diameter 12 m-long steel pipes, steel arches HEA 180 and shotcreting will provide pre-support to the crown. Other pre-support to the crown when excavation has moved forward will consist of 32 mm-diameter 4 m-long grouted steel bars at 30-35-40 cm intervals (cross-section A3). Reinforcement will be achieved with 6 m SuperSwellex bolts (cross-section A1), fibre-reinforced shotcrete (cross-sections A1, A2 and A3) and steel arches HEA 180 (cross-sections A2 and A3). For waterproofing, a PVC liner and geotextile will be installed. The safety tunnels will be built by a 3.9 m-diameter TBM and supported with 2.5 m Swellex bolts, steel arches HEA 100 and shotcrete. Visit www.cat.com, www.robodrill-sa.com and www.swellex.comTodini proposed the following safety systems: reversible semi-transverse ventilation, lighting and emergency lighting, ventilation of the safety tunnel, pressurization of filter housings, fire fighting devices and VES (Voice Emergency System). 27/08.



Permalink

Open procedure invitation to tender, deadline 05.05.2009, for tunnel equipment and roads maintenance on SS125/130/131/131DCN/195/389/554 and new SS554 in Cagliari, Oristano and Nuoro provinces. Contract value EUR349,933, duration 300 days after award. Contact ANAS, Sardegna Department, Bids Office, Via Biasi 27, 09131 Cagliari, tel +39 (0)705297-1, fax -268. Visit www.stradeanas.it. Bid Code n. 26A2009. For history of road projects in Sardinia visit tunnelbuilder archive it/94. 17/09.



Permalink

Open invitation to tender, deadline 12.04.2010, for the equipment in the 1.7 km Genna Ortiga tunnel on the SS 125, subsection Tertenia-Tortoli, third lot, first and second stretches. Time limit for receipt of requests for documents or for accessing documents: 2.4.2010 - 12:00. Contract duration 90 days, value EUR6 million. Contact Mrs Irma Zolfino at Anas SpA bid and contract office in Cagliari, tel +39 (0)70 5297-1, fax -268, e-mail i.zolfino@stradeanas.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=053841-2010 and www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/16738. Bid Code 2A2010. 09/10.



Permalink

Siei Srl (Vi) secured the EUR2.8 million contract for the equipment in the 1.7 km Genna Ortiga tunnel on the SS 125, subsection Tertenia-Tortoli, third lot, first and second stretches. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=292645-2010 and http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/28282. Bid Code 2A2010. 40/10.



Permalink

Open invitation to tender, deadline 24.01.2011, for tunnel equipment and roads maintenance on SS125/131/131DCN/291/NSA268 in Cagliari, Oristano and Nuoro provinces. Contract value EUR218,000, duration 300 days. Contact ANAS, Sardegna Department, Bids Office, Via Biasi 27, 09131 Cagliari, tel +39 (0)705297-1, fax -268. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/32699. Bid Code n. 33A2010. 51/10.Open invitation to tender, deadline 24.01.2011, for tunnel equipment and roads maintenance on SS125/130/131/131DCN/195/389/554 and new SS554 in Cagliari, Oristano and Nuoro provinces. Contract value EUR329,922.64, duration 300 days after award. Contact ANAS, Sardegna Department, Bids Office, Via Biasi 27, 09131 Cagliari, tel +39 (0)705297-1, fax -268. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/32698. Bid Code n. 32A2010. 51/10.



Permalink

Eurotek Group Srl (Cagliari) secured the EUR159,226.50 contract for tunnel equipment and roads maintenance on SS125/131/131DCN/291/NSA268 in Cagliari, Oristano and Nuoro provinces. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/34583 and www.euroteckgroup.com. Bid Code n. 33A2010. 05/11.Comet Srl (Nocera Inferiore) secured the EUR241,021.89 contract for tunnel equipment and roads maintenance on SS125/130/131/131DCN/195/389/554 and new SS554 in Cagliari, Oristano and Nuoro provinces. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/34582. Bid Code n. 32A2010. 05/11.



Permalink

Open invitation to tender, deadline 10.02.2015, for tunnel equipment and roads maintenance on SS125var/130/131DCN/195/389/554/554 bis  in Cagliari province. Contract value EUR399,997.23, excluding VAT, duration 365 days. Contact ANAS, Sardegna Department, Bids Office, Cagliari, tel +39 070 52971, fax +39 070 5297268, e-mail anas.sardegna@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/69100. Bid Code n. 32A2014. 06/15.



Permalink

Open invitation to tender, deadline 24.02.2015, for tunnel equipment and roads maintenance on SS125var/131DCN/NSA268/291var in Cagliari and Olbia-Tempio provinces. Value of contract EUR249,997.84, excluding VAT, duration 365 days. Contact ANAS, Sardegna Department, Bids Office, Cagliari, tel +39 070 52971, fax +39 070 5297268, e-mail anas.sardegna@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/69102. Bid Code n. 2A2015. 06/15.



Permalink

Stacchio Impanti Srl of Pollenza (MC) secured the EUR171,450.81 contract, excluding VAT, for tunnel equipment and roads maintenance on SS125var/131DCN/NSA268/291var in Cagliari and Olbia-Tempio provinces. Contact ANAS, Sardegna Department, Bids Office, Cagliari, tel +39 070 52971, fax +39 070 5297268, e-mail anas.sardegna@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/71465. Bid Code n. 2A2015. 16/15.



Permalink

Di Bella Costruzioni Srl from Catania and Almar Elettrotecnica Srl from Como secured the EUR 7 million contract, excluding VAT, for maintenance in road tunnels belonging to the Sardinia Department, which includes providing maintenance for centers A and C and on the SS131DCN. For further information contact Anas, Rome, tel +39 06490326, fax +39 064456224, e-mail v.dambrosio@stradeanas.it.. Visit a http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=367984-2017. Bid Code n. CA 03/16. 38/17.



Permalink