Click to visit the CIFA website

THE ONLY “FULL LINE” COMPANY FROM FORMWORK TO SPRAYED CONCRETE

To be “full line” means to know, better than anyone else, about the way concrete behaves and the technological characteristics of the machines used to process the concrete. The term expresses the ability to handle the overall management of the complete process: from production to distribution, from pumping to installation. CIFA is a “full line” company because it has unparalleled knowhow which ranges across the entire application spectrum of concrete: an expertise that translates into an immediate and clear understanding of the problems and of the expectations of users and in the research and development of highly efficient, reliable products. Modern construction sites, tunnel, bridge, dam and port view CIFA technology as a leader in performance and versatility

CIFA, A LEADING COMPANY IN ITALY ONE OF THE LEADING COMPANIES WORLDWIDE

CIFA's machines and resources have played an important role and continue to be a fundamental factor on major international construction sites. CIFA is present wherever the management of concrete technology is an essential component of the operation and the operating economy of the construction site. The most authoritative engineering teams operating in the sectors of tunnels, bridges, dams and ports, have attested to CIFA's excellence. Its supremacy ranges from vehicles working in the field and extends up to the professional quality of its service. From the dam on the Yangtze river to high-speed European railway lines, from the Dallas underground system to the Angostura Hydroelectric Project in Costa Rica, from the extension of the Milan underground system to the Manapouri project in New Zealand, CIFA is a major player in large construction sites throughout the world.

SEGMENT MOULD FORMWORK WITH CAROUSELTYPE SYSTEM

The steel moulds for segments are mounted on special trolleys that travel along production lines with fixed operating stations in forced curing areas inside tunnels on several lines subject to a controlled temperature. The trolleys travel along the operating line at a speed of approximately 10 minutes where operations to dismantle, clean, lay the reinforced iron bars, position the inserts, jet spray and surface finish are performed. The supply can be integrated with a concrete mixing plant complete with jet spray system, preparation and positioning structure for the reinforced iron bar cages and a final line to mark the segment moulds and assemble the seals.

Tunnelling Reference

Croatia

Polycentric formwork with anchorages at the bases for road tunnels, part of the Sveti Rok Tunnel project.
Czech Republic

Czech Republic

¾ lane Polycentric mechanical self-reacting formwork for ring road tunnel, Prague

Ethiopia

Polycentric formwork with anchorage type crapaud + tyred traveller for Gibe III, Addis Ababa
Germany

Germany

Polycentric formwork with anchorage type crapaud + re-bar carrier for railway tunnel – Hoppstadten - Weiserbach

India

Circular formwork with crapaud anchorages, part of tha Harchan Wangtoo H.E.. project
UK

UK

Artificial formwork + re-bar carrier, Inverness - Scotland.
Italy

Italy

Mechanical self-reacting formwork for highway A3 Sa-Rc, Calabria

Italy

Mechanical self-reacting formwork for S.S. 106 Catanzaro, Calabria

Russia

Segment moulds and plier of gaskets clamping for Cable Tunnel, Moscow.
Spain

Spain

Polycentric and circularformwork with anchorages La Cabrera-Bunol Valencia.

South Africa

Dumper-mounted mixers 5/6 m3

Sweden

Circular formwork with anchorages at the bases and by-pass, Malmo.

Contact Us

CIFA SpA
Via Stati Uniti d'America, 26 20030
Senago (MI), I
Tel. +39.02.990131
Fax. +39.02.9981157
cifa@cifa.com
www.cifa.com