Thames Water has appointed Swiss banking group UBS to raise the EUR5 billion required to fund the Thames Tideway sewer project, designed to end the dumping of raw effluent into the River Thames. The 7-year project is scheduled to start in 2015. More from
uk/54 and
www.thameswater.co.uk/2528.htm?q=thames+tideway. 43/12.