Eight Terratec 6.52 m-diameter EPBs are at work on Delhi Metro Phase 3. During the last two months, four significant breakthroughs have been recorded, and another 14 will be accomplished during the coming year. Read the press release and visit http://terratec.co/NewsInfos/detail/19. 45/14.
07.05.2024 Poland
07.05.2024 Switzerland
13.05.2024 India
15.05.2024 Macedonia
15.05.2024 Czech Republic
16.05.2024 Finland
17.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
15.12.2024 Austria