The 6.8m Robbins Single Shield TBM Nora has started boring for the Delaware Aqueduct Repair (DAR). The TBM, operated by contractor Kiewit-Shea Constructors (KSC), will bore a 3.8 km long tunnel beneath the Hudson River. Click here for Nora’s underground assembly, here and us/117 for tunnelbuilder archive. Visit http://www.therobbinscompany.com/. 07/18.
http://www.therobbinscompany.com/=>http://www.therobbinscompany.com/projects/delaware-aqueduct-repair/
25.04.2024 Austria
30.04.2024 Germany
07.05.2024 Poland
07.05.2024 Switzerland
13.05.2024 India
15.05.2024 Czech Republic
15.05.2024 Macedonia
16.05.2024 Finland
17.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
15.12.2024 Austria