NFM Technologies has received an order for a 6.6 m-diameter earth pressure balance TBM to drive a section of the second circular line of Moscow metro. The alignment of the twin-tube tunnel is in geology consisting mainly of limestone, clay and sand.
Read the press release and visit
www.nfm-technologies.com. 26/12.