On 09.08.2012 Cipa SpA broke through the 402 m south carriageway of Limbia tunnel, lot DG22 of SS106 Jonica, awarded to the general contractor Astaldi SpA. The tunnel has a 5.95 m ID and a 6.95 m OD. For more click
here, here and
it/101. Visit
www.cipaspa.it. 33/12.