Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

Track Projects

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website
  • NFM
  • Terratec
  • Robbins
  • PPS
  • CBE
  • Daetwyler
  • Geodata
  • Creg TBM
  • Normet
  • Seli Overseas

Recent Awards

Italy

Motorway, Piedmont - it/166

The awarding procedure for the ventilation system in the second tube of the Frejus road tunnel (lot 4) has been interrupted. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=047648-2018.

Ref.n. DTE/AOR/TUN/16-16. 06/18.



Permalink Permalink

France

Highway, Rhone - Alps - fr/47

The awarding procedure for the ventilation system in the second tube of the Frejus road tunnel (lot 4) has been interrupted. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=047648-2018.

Ref.n. DTE/AOR/TUN/16-16. 06/18.



Permalink Permalink

France

Grand Paris Express, Paris - fr/127

SARL Cigma Ouest Saint Brieuc from Saint Brieuc secured the project management assistance to the contractual management for works and equipment for the Grand Paris Express. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=047084-2018.

Ref. n. 2017PN005. 06/18.



Permalink Permalink

Italy

High Speed Railway, Lyon-Turin - it/80

The Group Pini Swiss Engineers SA/Pini Swiss Engineers SARL from Lugano secured the EUR580,294 contract, excluding VAT, for the preparation of the project. The project management of the works for the digging out of the places to pass and the inner layout of the Maddalena tunnel, for the transport and the depositing of the excavated materials as well as for support to the police. Contact TELT SAS, Le Bourget du Lac, , tel +33 479444240, fax +33 479685683, email fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=024386-2018.06/18.



Permalink Permalink

France

High Speed Railway, Rhone-Alps - fr/11

TELT secured to 13 European engineering companies for the general management during the construction of the French section of the base tunnel of Moncenisio on new rail link Lyon-Turin. Value contract EUR 90 million. The contract is composed of  three lots including the tunnel between Italy-France border and the adit at Villard-Clement in Saint-Julien-Montdenis municipality.

Lot 1: the JV ALLTI (Alliance Lyon Turin Ingenierie) composed of Arcadis and BG Ingenieurs Conseils, Neosia (ex Tecnimont Civil Construction), Lombardi Ingenierie and Amberg secured the 24 km section from the Villerodin-Bouget/Modane survey gallery to be built by 2 TBMs. Duration contract 10 years. Value EUR40 millions, excluding VAT.

Lot 2 : The JV Setec TPI (leader) with Systra, Italferr and Pini Swiss Engineers secured the 21 km section between the La Praz and Saint-Martin-la-Porte survey tunnels to be built by 3 TBMs. Duration contract 10 years. Value EUR37 millions, excluding VAT.

Lot 3 :  the JV Inalpage, composed of Egis (leader) with Ingerop, Alpina and Geodata secured the 5 km section from Villard-Clement adit., to be built with NATM method. Duration contract 4.5 years. Value EUR13.7 millions, excluding VAT.

Contact TELT sas, attn Geraldine Decarre, Le Bourget-du-Lac, tel +33 479685679, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://www.telt-sas.com/it/contratti-direzione-lavori-francia/. 05/18.



Permalink Permalink

France

Road , Provence - Alps - French Riviera - fr/69

The Group Satelec/Jean Graniou-Citéos at Mouans Sartoux secured the EUR5 million contract, excluding VAT, for extension works and for maintenance of electrical equipment on road department tunnels. Contact Alpes-Maritimes  Departement  Nice, tel +33 497186368, email marches@departement06.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=043366-2018. Ref.n. 17S0134. 05/18.



Permalink Permalink

Italy

High Speed Railway, Liguria-Lombardy-Piedmont - it/208

The JV Toto Costruzioni Generali (58%) and Seli Overseas (42%) secured the EUR190 million contract for civil works and associated works from km  19+700.00 to km 27+455.00 of the Terzo Valico dei Giovi project on the  Milan-Genoa high-capacity, high-speed railway line, Lot Valico (Radimero).

The contract includes the construction with 2 TBM EPB of a 7.7km bitube tunnel with a 8.66 m inner diameter. The previewed duration is 33 months.  For further information click here. Contact COCIV (Consorzio Collegamenti Integrati Veloci), attn ing. Marcos Montevecchi, Genova, tel +39 0104218715, email RUP@COCIV.POSTECERT.IT. Visit http://totospa.it/  and http://www.selioverseas.com/.

and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=055984-2018.

Ref.n. F81H92000000008. 05/18.



Permalink Permalink

Brazil

Metro Line 5, Sao Paulo - br/23

The Via Mobilidade Consortium formed by group CCR (83,4%) and by RuasInvest(16,6%) won  the concession of lines 5-Lilas and 17-Gold of the Sao Paulo subway system. The consortium offered EUR141.75 million (BRL 553.8 million) for the operation of services for 20 years.

The 20 km line 5-Lilas should have, when established, 17 stations, connecting districts from the Sao Paulo South Side, from Capao Redondo to Chacara Klabin.

The 7.7km elevated Line 17 is a monorail that will connect, through 10 stations, the district Morumbi to Congonhas airport. Visit http://www.saopaulo.sp.gov.br and http://www.metro.sp.gov.br/obras/linha-5-lilas/index.aspx. 05/18.

http://www.saopaulo.sp.gov.br/sala-de-imprensa/release/consorcio-via-mobilidade-vence-leilao-de-concessao-das-linhas-5-e-17-do-metro/



Permalink Permalink

France

Metro Line 4, Paris - fr/44

Samex from  Clamart secured the contract for heating, ventilation, air conditioning and smoke extraction works on the metro Line 4 extension (lot S3) at Bagneux. The duration of the contract is 44 months after the award. For further information https://ratp.bravosolution.com/web/login.html.Contact RATP, Paris, tel +33 158769920, email cecile.migeon@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=040076-2018.

Bid Code n. DHA_2017MOP10922. 05/18.



Permalink Permalink

Germany

Railway, Baden-Wurttemberg - de/144

Siemens AG  of Braunschweig (D) secured the contract for the electrical signalling equipment, part of the refurbishment of the Pforzheimer twin-track tunnel on the Karlsruhe-Muehlacker line. Contact DB AG, attn Harald Rohrbach, Stuttgart, tel +49 89130849334, email harald.rohrbach@deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=040598-2018.

Ref.n. 0016/463/92258427. 05/18.



Permalink Permalink

Page:

Advertise your company here
Advertise your company here
Advertise your company here