Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website
  • NFM
  • Terratec
  • Robbins
  • PPS
  • CBE
  • Jennmar
  • Robit
  • Sandvik
  • Normet
  • BASF

Archive Search

Saudi Arabia

Saudi Arabia, Riyadh - sa/13

Metro

Closing Date: 26.06.2012 (Tender Closed)

Arriyadh Development Authority (ADA) invites international consortia to prequalify, deadline 20.06.2012, for a turnkey contract to design, build and equip Phase 1 of the Riyadh light metro, with an option to maintain the three-lines 92 km-long network. Design has so far only been completed for lines 1 and 2, which have an estimated cost of EUR3.6 billion.

Companies that prequalify will be invited to bid on 20.07.2012, with submissions due by end-October. ADA plans to award the contract in mid-January 2013, and the first section of the light metro must open by the end of 2016. The metro will include a mixture of underground, at grade and elevated construction. Line 1 will be 24 km-long, Line 2 will be 26 km-long, and Line 3 will be 42 km-long. Phase 2 will add another three lines to the network, but their alignment has not yet been defined. Prequalification application forms available by e-mail from metro@arriyadh.net. Visit www.arriyadh.net. 24/12.



Browse Countries

subscribe to our e-alerts view our advertising rates view our jobs
subscribe to our e-alerts view our advertising rates view our jobs