Feasibility study completed by Itochu Corporation and NKK for 15 km-long, $4 bn Cavite-Bataan underwater tunnel as part of proposed Trans-Manila Bay Crossing for Subic Bay Metropolitan Authority financed by JBIC. Visit www.itochu.com 33/01.
Permalink
For Currency Converter click HERE
19.04.2024 France
23.04.2024 Austria
23.04.2024 Slovenia
25.04.2024 Austria
30.04.2024 Germany
07.05.2024 Switzerland
07.05.2024 Poland
13.05.2024 India
15.05.2024 Czech Republic
15.05.2024 Macedonia
16.05.2024 Finland
17.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
15.12.2024 Austria
tunnelbuilder.com is an online news source for tunnelling projects and tunnelling news worldwide. It provides information on tenders and awards as well as providing information of what’s happening in the tunnelling industry.
Access to front page tunnelling news, the buyer’s guide, product promotion and jobs is FREE.