City of Monterrey plans to build 19 km drainage system of 6 m to 8 m diameter tunnels at depths to 40 m to reduce flooding. Estimated cost $265 million. February 1997.
Permalink
For Currency Converter click HERE
02.04.2024 Czech Republic
02.04.2024 Netherlands
02.04.2024 Bosnia and Herzegovina
08.04.2024 Denmark
19.04.2024 France
23.04.2024 Austria
23.04.2024 Slovenia
25.04.2024 Austria
07.05.2024 Switzerland
13.05.2024 India
07.06.2024 Canada
15.12.2024 Austria
tunnelbuilder.com is an online news source for tunnelling projects and tunnelling news worldwide. It provides information on tenders and awards as well as providing information of what’s happening in the tunnelling industry.
Access to front page tunnelling news, the buyer’s guide, product promotion and jobs is FREE.