Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

Track Projects

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website
  • Terratec
  • Tunelmak
  • Robbins
  • PPS
  • CBE
  • Daetwyler
  • Geodata
  • Creg TBM
  • Normet
  • Seli Overseas

Archive Search

Italy

Italy, Lyon-Turin - it/80

High Speed Railway

Restricted invitation to tender, deadline 14th February, 2003 for core drilling for the 12 km-long Bussoleno tunnel. Lot 1 is for eight vertical boreholes in alluvial ground spread out on a length of 580 m with a maximum depth of 150 m, or ten vertical boreholes on a length of 840 m, maximum depth 200 m. Lot 2 is for six vertical boreholes in rock, length of execution 2,140 m and maximum depth 540 m, or seven vertical boreholes, length 2,720 m and maximum depth 580 m. Lot 3 is for five vertical boreholes in rock on a length of 2,530 m at a maximum depth of 870 m, or four vertical boreholes, maximum depth 950 m, plus one 400 m horizontal borehole, to be executed on a length of 3,100 m. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=202642-2002, OJ S 252, or contact Lyon Turin Ferroviaire, Chambéry, tel. +33 479685666 or 67 and +39 0115579221. E-mail pierre.dhe@ltf-sas.com, franco.gallara@ltf-sas.com and xavier.dermendrail@ltf-sas.com 02/03.Restricted call for bids, deadline 4th July, 2003 for geophysical investigation for the 52 km base tunnel and the 12 km Bussoleno tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=099075-2003, OJ S 110, or contact Lyon Turin Ferroviaire, Chambéry, fax +33 479609704. E-mail pierre.dhe@ltf-sas.com and nathalie.monon@ltf-sas.com 25/03.Open call for bids, deadline 24th July, 2003 for aeraulics study as part of the draft design of the 12 km Bussoleno tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=099055-2003, OJ S 110, or contact Lyon Turin Ferroviaire, Chambéry, fax +33 479686097 or 5675. E-mail pierre.dhe@ltf-sas.com and eddy.verbesselt@ltf-sas.com 25/03.Restricted procedure, deadline 29th September, 2003 for construction of the 7 km-long 6 m-diameter Venaus exploratory tunnel, with option for three more kilometres. Overburden of 2 km and 2.5 km for the optional 3 km. To be driven mainly using a hard rock gripper TBM. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=150092-2003 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=150093-2003, OJ S 163, or contact Lyon Turin Ferroviaire, Chambéry, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com and lorenzo.brino@ltf-sas.com 37/03.Two contracts have been awarded for core drills for the 12 km-long Bussoleno tunnel in Italy. RCT won contract 1 for eight vertical boreholes in alluvial ground spread out on a length of 580 m with a maximum depth of 150 m, or ten vertical boreholes on a length of 840 m, maximum depth 200 m. Amount: €323,200. More from rct@mi.nettimo.it. Contract 2 is for six vertical boreholes in rock, length of execution 2,140 m and maximum depth 540 m, or seven vertical boreholes, length 2,720 m and maximum depth 580 m. It is won by Geotecno for €1.9 million. More from mfo@geotecnosrl.it. Contract 3 has been declared void for failing to attract bids within the client's budget. This contract is for five vertical boreholes in rock on a length of 2,530 m at a maximum depth of 870 m, or four vertical boreholes, maximum depth 950 m, plus one 400 m horizontal borehole, to be executed on a length of 3,100 m. Visit www.ltf-sas.com 42/03.Restricted call for bids, deadline 21st November, 2003 for core drilling and exploratory boring for the Bussoleno tunnel (12 km). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=180607-2003, OJ S 200, or contact Lyon Turin Ferroviaire, Chambéry, fax +33 479685683. E-mail pierre.dhe@ltf-sas.com or xavier.darmendrail@ltf-sas.com 44/03.A JV between Scetauroute and Metropolitana Milanese has secured a €108,700 contract to conduct an aeraulics study as part of the draft design of the 12 km Bussoleno tunnel. Visit www.scetauroute.fr and www.metropolitanamilanese.it 44/03.Restricted invitation to tender, deadline 8th December, 2003 for environmental measurements for the Venaus exploratory tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=185215-2003, OJ S 205, or contact Lyon Turin Ferroviaire, Chambéry, fax +33 479685683 and +39 0122641052. E-mail pierre.dhe@ltf-sas.com and piergiuseppe.gilli@ltf-sas.com 45/03.Open invitation to tender, deadline 5th January, 2004 for a 500 m vertical or inclined core drill. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=192010-2003, OJ S 213, or contact Lyon Turin Ferroviaire, Chambéry, fax +33 479685683. E-mail sgt.dde-isere@equipement.gouv.fr 46/03.Geophysik GGD won a €191,720 contract for preparing seismic profiles from core drills F65 and F75 for the base tunnel, a €184,460 contract for preparing seismic profiles from core drills S42, S49 and S8 for the Bussoleno tunnel, and a €55,260 contract for evaluation of the depth of the vertical faults for the base tunnel. Visit www.geophysik-ggd.com 51/03.Geoexpert won a €42,700 contract for two hybrid seismic profiles, 1 km and 600 m in length, for the base tunnel. Visit www.geoexpert.ch 51/03.Geoinvest won a €33,600 contract for electrical profiles for the Bussoleno tunnel. Visit www.geoinvest.it and www.ltf-sas.com 51/03.Open invitation to tender, deadline 14th April, 2004 for project construction management for the Venaus exploratory tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=026791-2004, OJ S 30, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com 10/04.Negotiated procedure, deadline 2nd July, 2004 for assistance to the client for the reference draft design, the detail design of the Italian part and the public inquiry in France and Italy. Contract 5 deals with tunnels. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=087067-2004, OJ S 106, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com or lorenzo.brino@ltf-sas.com 25/04.Negotiated procedure, deadline 19th July, 2004 for assistance to the client for the reference draft design for the international section of the base tunnel between Saint-Jean-de-Maurienne, France and Bruzolo, Italy. The reference draft design is an intermediate stage between the conceptual design and the detail design. There are seven contracts. Contract 0 is for general coordination. Contract A1 deals with operation and maintenance, contract A2 with safety, contract B1 with civil engineering, contract B2 with geology, contract B3 with railway and non-railway equipment and contract B4 with environment. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=094328-2004, OJ S 112, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com or geraldine.berthier@ltf-sas.com 25/04.Negotiated procedure, deadline 28th June, 2004 for making compatible urbanism documents (land use plan, development plan, maps, etc.) between Saint-Jean-de-Maurienne and the Italian border as part of the public inquiry. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=094345-2004, OJ S 112, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com, jacques-ricard@ltf-sas.com, geraldine.berthier@ltf-sas.com or nicole.delbe@ltf-sas.com 25/04.Information meetings will be held in Paris on 17th June and in Rome on 18th June. Visit www.ltf-sas.com/fr/couponreponseapr.pdf for registration to these meetings. 25/04.Qualification procedure for safety studies as part of the reference draft design for the international section of the base tunnel between Saint-Jean-de-Maurienne, France and Bruzolo, Italy. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=095916-2004, OJ S 114, or contact LTF, Chambery, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com, stephane.bouquier@ltf-sas.com, geraldine.berthier@ltf-sas.com or nicole.delbe@ltf-sas.com 26/04.Negotiated procedure, deadline 15th September, 2004 for compliance control of the reference draft design of the French-Italian section between Saint-Jean-de-Maurienne and Bruzolo. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107876-2004, OJ S 127, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. E-mail vincenzo.degregorio@ltf-sas.com, lorenzo.brino@ltf-sas.com, geraldine.berthier@ltf-sas.com or nicole.delbe@ltf-sas.com 29/04.Negotiated procedure, deadline 1st September, 2004 for construction by means of a TBM of the 7 km Venaus exploratory tunnel with a cover of 2 km, with option for three more kilometres with a cover of 2.5 km. This is a re-tender as the previous tender process has been declared void. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=129218-2004, OJ S 149, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. 35/04.The construction of the 6 m-diameter Venaus investigatory tunnel under the Ambin massif near Susa has been commissioned to a JV headed by CMC and including Strabag, Bentini Costruzioni, Cogeis and Geotecna for EUR84.3 million. The contract awarded by Lyon Turin Ferroviaire (LTF) is for a 7 km tunnel, with option for a further 3 km. Cover above the tunnel of approximately 2,000 m (2,500 m for the optional three kilometres). A hard rock Gripper TBM will be used. Work to commence next spring to last three years. Visit www.ltf-sas.com, www.cmcra.it, www.strabag.at and www.cogeis.it 07/05.Geodata, SNCF Ingenierie and Systra secured a contract estimated at EUR2.9 million for project construction management for the Venaus exploratory tunnel and the follow-up of measurements and tests. This is a 7 km-long 6 m-diameter Venaus exploratory tunnel, with option for three more kilometres. Visit www.geodata.it and www.systra.com 21/05.Socotec secured a EUR1.4 million contract for the compliance control of the reference draft design of the French-Italian section between Saint-Jean-de-Maurienne and Bruzolo. Visit www.socotec.fr 42/05.Geos and D'Appolonia secured a EUR509,000 contract for safety studies as part of the reference draft design for the international section of the base tunnel between Saint-Jean-de-Maurienne, France and Bruzolo, Italy. Visit www.geos.tm.fr and www.dappolonia.it 43/05.Negotiated procedure, deadline 14th June, 2006 for geological surveying, measurements and mapping in several areas of the international section of the Lyon-Turin base tunnel. Read E-News Weekly 2/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=110595-2006, OJ S 103, or contact LTF, Chambery, fax +33 479685683. E-mail geraldine.decarre@ltf-sas.com 24/06.Negotiated procedure, deadline 22nd September, 2006 for environmental impact study on the Italian part of the Lyon-Turin base tunnel from the border to the portal of the Gravio tunnel in Borgone. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=162449-2006, OJ S 150, or contact Lyon Turin Ferroviaire, Chambery, fax +33 479685683. E-mail delphine.croizer@ltf-sas.com 33-34/06.A consortium of Golder EEIG, AI Engineering, TEMI, and TEI has been contracted to undertake the environmental impact study on the Italian part of the Lyon-Turin base tunnel from the border to the portal of the Gravio tunnel in Borgone. The contract is estimated at EUR950,000. Visit www.golder.it, www.temiambiente.it and www.tei.it 11/07.Negotiated call for tenders, deadline 10th September, 2007 for engineering services for the approx. 80 km international cross-border section between Saint-Jean-de-Maurienne in France and Susa valley in Italy. The 53 km base tunnel is the major challenge on that section. The studies deal with operation and maintenance (lot 1), safety (lot 2), civil engineering, geology and environment (lot 3), railway technology and other equipment (lot 4), construction follow-up (lot 5), specialised consultancy (lot 6), economic and socio-economic studies (lot 7), geodesy and topography (lot 8), soil and rock exploration and surface exploration (lot 10). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=194966-2007, OJ S 156, or contact LTF, Chambery, fax +33 479685683. E-mail michel.bogacz@ltf-sas.com 34/07.Negotiated procedure, deadline 01.12.2008, for contract to review project studies for the joint working party of the Lyon-Turin railway. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=285629-2008, OJ S 214, or contact Stéphanie Nicoud at Lyon Turin Ferroviaire, Chambery, fax +33 4 79 68 56 83, e-mail stephanie.nicoud@ltf-sas.com 45/08.

NEED QUALIFIED PERSONNEL?



France- Rhone-Alps - fr/11 & Italy Lyon-Turin - it/80

The awarding procedure for the invitation to tender by negotiated procedure for two lots of exploration work involving underground test drilling and tunnelling for Saint-Martin la Porte in Val de Maurienne has been discontinued. Contact Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax -83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=367332-2011. 48/11.

NEED QUALIFIED PERSONNEL?



Invitation to tender by negotiated procedure, deadline 16.09.2013, for framework agreement for site preparation work at Bussoleno-Susa site (phase 1) for the new rail link Lyon-Turin. The framework agreement, with 25 maximum participants, will run for 48 months after award, value EUR24-85 million. The contract comprises four lots. Further information, specs and docs from Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Time limit for accessing documents 09.09.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=242506-2013. Framework agreement n.14. 30/13.

NEED QUALIFIED PERSONNEL?



Invitation to tender by restricted procedure, deadline 16.09.2013, for framework agreement covering procedures, studies, construction management, control compliance/validation studies, coordination of safety and health protection, technical-administrative, static and functional control during construction, environmental supervision for site preparation work at Bussoleno-Susa site (phase 1) for the new rail link Lyon-Turin. The framework agreement, with 25 maximum participants, will run for 48 months after award, value EUR13-47 million. The contract comprises seven lots. Further information, specs and docs from Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Time limit for accessing documents 09.09.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=242641-2013. Framework agreement n.13. 30/13.

NEED QUALIFIED PERSONNEL?



Invitation to tender by restricted procedure, deadline 14.02.2014, for framework agreement covering financial studies for the cross border section for the new rail link Lyon-Turin and for the associates assistance to LTF and Commission Intergouvernementale (CIG). The framework agreement will run for 45 months, value EUR200-600,000, excluding VAT. Further information, specs and docs from Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Time limit for accessing documents 07.02.2014. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 437907-2013. 52/13.

NEED QUALIFIED PERSONNEL?



Invitation to tender by restricted procedure, deadline 16.04.2014, for framework agreement covering assistance to the project management for traffic, economic and socio-economic studies for the new Lyon-Turin rail link. The framework agreement will run for 42 months, value EUR150,000, excluding VAT. Further information, specs and docs from Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Time limit for accessing documents 09.04.2014. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=100073-2014. 14/14.

NEED QUALIFIED PERSONNEL?



Negotiated procedure, deadline 29.08.2014, for the certification of the project costs for the cross border section for the new rail link Lyon-Turin. Duration of contract 24  months, value EUR150,000-350,000, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 22.08.2014. Contact Stephanie Nicoud at Lyon Turin Ferroviaire, Chambery, tel +33 479685669, fax +33 479685683, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=250362-2014. 30/14.

NEED QUALIFIED PERSONNEL?



Invitation to tender using negotiated procedure, deadline 15.09.2014, for framework agreement covering construction-site supervision services for the new Lyon-Turin rail link. Contract duration 48 months from award, value EUR1,310,000-6,450,000, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 08.09.2014.Contact Stephanie Nicoud at LTF Sas in Chambery, tel +33 479685669, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 255999-2014. 31/14.

NEED QUALIFIED PERSONNEL?



Invitation to tender by restricted procedure, deadline 01.09.2014, for environmental coordination of geological works from Saint-Martin-la-Porte, during the construction period of the new Lyon-Turin rail link. Value of contract EUR160-750,000, excluding VAT, duration 120 days from award. Time limit for accessing documents 25.08.2014. Contact Stephanie Nicoud at LTF Sas in Chambery, tel +33 479685669, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=255994-2014. 32/14.

NEED QUALIFIED PERSONNEL?



SEA Coop/EG Team (Turin) secured the EUR187,111.50 contract, excluding VAT, for auscultation of water resources on the Italian side of the new Lyon-Turin rail link. Contact Stephanie Nicoud at LTF Sas in Chambery, tel +33 479685669, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=256018-2014. Ref. n. C14098. 32/14

NEED QUALIFIED PERSONNEL?



Finance Consult of Paris secured the EUR350,000 contract, excluding VAT, for framework agreement covering financial studies for the cross border section for the new rail link Lyon-Turin and for the associates assistance to LTF and Commission Intergouvernementale (CIG). Contact Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 313671-2014. Ref. n.C14122. 38/14.

NEED QUALIFIED PERSONNEL?



Awarded the contract for framework agreement covering procedures, studies, construction management, control compliance/validation studies, coordination of safety and health protection, technical-administrative, static and functional control during construction, environmental supervision for site preparation work at Bussoleno-Susa site (phase 1) for the new rail link Lyon-Turin. Contact Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=318296-2014. Framework agreement n.13. 39/14.

NEED QUALIFIED PERSONNEL?




Fenice Spa of Cascine Vica (Rivoli, TO) secured the contract for environmental controls for Maddalena survey tunnel and its storage site. Contact Lyon Turin Ferroviaire SAS, att.n Stephanie Nicoud, Chambery, tel +33 479685669, fax +33 479685683, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=348846-2014


NEED QUALIFIED PERSONNEL?



Awarded the AC19 framework agreement covering test drilling, engineering, environmental, geological and geophysical consultancy services to complete dossier for the new Lyon-Turin rail link between Saint-Jean-de-Maurienne and Bussoleno. Contact Stephanie Nicoud at LTF-SAS in Chambery, tel +33 4796856-69, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=418039-2014. 52/14.

NEED QUALIFIED PERSONNEL?



The Group Tractebel Engineering SA/TUC Rail of Bruxelles secured the EUR350,000 contract, excluding VAT, for the certification of the project costs for the cross border section for the new rail link Lyon-Turin. Contact Stephanie Nicoud at Lyon Turin Ferroviaire, Chambery, tel +33 479685669, fax +33 479685683, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=64122-2015. 09/15.

NEED QUALIFIED PERSONNEL?



Artelia Ville & Transport of Lentilly secured the EUR750,000 contract, excluding VAT, for environmental coordination of geological works from Saint-Martin-la-Porte during construction of the new Lyon-Turin rail link. Contact Stephanie Nicoud at LTF Sas in Chambery, tel +33 479685669, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=34665-2015. 09/15.

NEED QUALIFIED PERSONNEL?



Fama has signed with the JV Spie Batignolles, Ghella, Cogeis, CMC Ravenna, Eiffage TP, which has as project director Florent Martin, the contract for the supply of the production segments and their accessories for the construction of the New Transalpine Railway Turin-Lyon as far as Saint Martin La Porte. Visit http://www.famaspa.it/en/News/44/Firma-del-contratto-per-la-realizzazione-della-Nuova-Linea-Ferroviaria-Transalpina-Torino---Lione/ and http://tunnelbuilder.com/suppliers/FAMA/. 21/15.

NEED QUALIFIED PERSONNEL?




The awarding procedure for framework agreement covering construction-site supervision services for the new Lyon-Turin rail link has been discontinued. Contact Stephanie Nicoud at LTF Sas in Chambery, tel +33 479685669, fax –83, e-mail fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=224170-2015. 27/15.


NEED QUALIFIED PERSONNEL?



Negotiated invitation to tender, deadline 03.07.2017, for general management during the construction of the tunnel, Italian side, for the new Lyon-Turin rail link. Value of the contract is EUR19.5 million, excuding VAT, for a 129 months duration. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479684240, fax

+33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215900-2017 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215897-2017. Ref. n. S29 . 24/17.

NEED QUALIFIED PERSONNEL?



Open invitation to tender, deadline 04.09.2017, for providing safety coordination (CSE) during  the preparation for the construction of railway trusses and maintenance of the Maddalena exploratory tunnel in Chiomonte (To). The duration of the contract is  12 months.  Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=297866-2017. Ref. n. TEN-T-2014-EU-TM.0401.M. 31/17.

NEED QUALIFIED PERSONNEL?




Open invitation to tender, deadline 06.10.2017, for the monitoring of water resources 2018-2020, on the Italian side, before the main works of the cross-border section for the new Lyon-Turin rail link. Value of the contract is EUR400,000, excluding VAT, duration of the contract is for 36 months. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479684240, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=361081-2017. Ref. n. S29 . Ref.n. TENT-T-2014-EU-TM.0401.M. 37/17.


NEED QUALIFIED PERSONNEL?



The contract for safety coordination (CSE) during  the preparation, construction of railway trusses and maintenance of Maddalena exploratory tunnel in Chiomonte (To) has not been awarded.  Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=443364-2017.

NEED QUALIFIED PERSONNEL?



Open invitation to tender, deadline 26.02.2018, for works of protection and maintenance of the TELT worksites for the Logistic support to the Forces of the Order (FF.O) in Italy. The contract is composed of 3 parts. Duration of the contract is for 24 months. Contact Tunnel Euralpin Lyon Turin SAS, attn Marjorie Chevelard, Le Bourget du Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=019184-2018

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=019177-2018.

Ref.n. TEN-T 2014-EU-TM.0401.M. 03/18.

NEED QUALIFIED PERSONNEL?



Negotiated invitation to tender, deadline 23.03.2018, for the assistance to the contracting authority and for studies during the construction of the transborder section for the new Lyon-Turin rail link. Value of the contract is EUR25 million, excuding VAT, for 168 months duration.  Contact TELT sas, Le Bourget du Lac, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=038092-2018 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=038078-2018. 05/18.

NEED QUALIFIED PERSONNEL?



The Group Pini Swiss Engineers SA/Pini Swiss Engineers SARL from Lugano secured the EUR580,294 contract, excluding VAT, for the preparation of the project. The project management of the works for the digging out of the places to pass and the inner layout of the Maddalena tunnel, for the transport and the depositing of the excavated materials as well as for support to the police. Contact TELT SAS, Le Bourget du Lac, , tel +33 479444240, fax +33 479685683, email fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=024386-2018.06/18.

NEED QUALIFIED PERSONNEL?



Negotiated invitation to tender, deadline 19.03.2018, for the construction of intersections and reversal of trains. Also for the equipment inside the Maddalena tunnel, the transport and the depositing of the excavated materials at Chiomonte (Italy) for the new Lyon-Turin rail link. Value of the contract is EUR52million, excuding VAT, the  contracts duration will be for 24 months.  Contact TELT sas, Le Bourget du Lac, fax +33 479685683, email fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=061721-2018 and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=061730-2018.

07/18.

NEED QUALIFIED PERSONNEL?



Additional information for the negotiated invitation to tender, deadline 19.03.2018, for the construction of intersections and reversal of trains.

Also for the equipment inside the Maddalena tunnel, the transport and the depositing of the excavated materials at Chiomonte (Italy) for the new Lyon-Turin rail link. Value of the contract is EUR52million, excluding VAT, the  contracts duration will be for 24 months.  Contact TELT sas, Le Bourget du Lac, fax +33 479685683, email fonction.marches@ltf-sas.com.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=081453-2018. 08/18.

NEED QUALIFIED PERSONNEL?



Negotiated invitation to tender, deadline 26.03.2018, for works management, for the management and development of the excavation materials on the Italian side of the cross-border section of the Turin-Lyon railway project (operational site n. 10). The value of the contract is EUR8.84 million, excluding VAT, duration for 112 months from this  autumn.  Contact TELT sas, Le Bourget du Lac, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=079321-2018.

Ref.n. 2014-EU-TM-0401-M. 08/18.

NEED QUALIFIED PERSONNEL?



Open invitation to tender, deadline 04.04.2018, for  the ante-operam environmental monitoring (duration 12 months before the construction site beginning as defined by Italian legislation) concerning the construction of the railway junction and the Torrazza Piemonte storage site, for the new Lyon-Turin rail link. Duration of the contract is 16 months.  Contact TELT sas, Le Bourget du Lac, fax +33 479685683, email fonction.marches@ltf-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104181-2018 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104177-2018. 10/18.

NEED QUALIFIED PERSONNEL?



Postponed from 04.04.2018 to 09.04.2018 the deadline of the open invitation to tender(before the start of the construction work)  for  the environmental monitoring (duration 12 months before the construction site beginning as defined by Italian legislation). With regards to the construction of the railway junction and the Torrazza Piemonte storage site, for the new Lyon-Turin rail link.

Duration of the contract is 16 months.  Contact TELT sas, Le Bourget du Lac, fax +33 479685683, email fonction.marches@ltf-sas.com. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=138415-2018

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=138421-2018.

13/18.

NEED QUALIFIED PERSONNEL?



Postponed from 11.06.2018 to 21.06.2018 the deadline of the open invitation to tender for the design and management of the environmental monitoring plan (PMA) for the construction of the works of the future Turin-Lyon rail link, Italian side. The value of the contract is EUR920.000, excluding VAT, duration for 156 months. Contact TELT sas, Le Bourget du Lac, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=229676-2018.

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=238355-2018Ref.n. S34. 22/18.

NEED QUALIFIED PERSONNEL?



The joint venture between Effedue Srl,  BBE Srl from Susa, Piemonte Disgaggi Opere Speciali Srl from Avigliana, Ghiggia Ingegneria d’Impianti Srl from Scarmagno (Turin), EMMEVI SRL from Ravenna and Geotecna Srl from Milan have been awarded the EUR3 million contract for the maintenance works at Chiomonte site by TELT, the duration will be 24 months. Visit http://www.telt-sas.com/it/affidato-appalto-mantenimento-chiomonte/.23/18.

NEED QUALIFIED PERSONNEL?



Postponed from 21.06.2018 to 03.07.2018 the deadline of the open invitation to tender for the design and management of the environmental monitoring plan (PMA) for the construction of the works of the future Turin-Lyon rail link, Italian side. The value of the contract is EUR920.000, excluding VAT, duration of the contract is for 156 months. Contact TELT sas, Le Bourget du Lac, email fonction.contrats@telt-sas.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=262724-2018. Ref.n. S34. 22/18.

NEED QUALIFIED PERSONNEL?



Browse Countries

Advertise your company here
Advertise your company here
Beakaert Maccaferri: bm-underground.com