Denmark, Copenhagen - dk/12

Metro

COMET jv driving 3.5 km of tunnels using NFM TBMs; 1 km NATM; and 500 m cut-and-cover. March 1999.NFM reports its two 5.71 m-diameter EPBs have recorded best day of 53 m, best week of 154 m, and best month of 567 m on 5 day/week production. Visit www.framatome.fr October 2000.Negotiated procedure, deadline 4th December, 2006 for engineering related to multi-disciplinary civil works (MCW) and multi-disciplinary transportation systems (MTS) for the Copenhagen metro's Circle Line. These two notices to prequalify for the two main consultancy assignments mark the commencement of preparatory actions handled by Orestad Development. Six teams of consultants are expected to be prequalified for each assignment before Christmas. They will then be asked to submit tenders by February 2007 and consultancy contracts are expected to be completed by July for immediate commencement of the work. At the same time the legal acts behind the Circle Line project are being processed by the Danish Parliament. The present planning basis for the project is the preliminary studies completed and reported by May 2005, which are made public by the Ministry of Transport and Energy. The reports can be downloaded (in Danish) from www.m.dk under "Om metro", "Cityring", "Hent materiale".Both consultants will be the owner's consultant through the design and procurement phases including design follow-up during construction. The MCW consultant will act on civil works, building works and related road works, i.e. all tunnel and stations. The MTS consultant will act on all railway system facilities, the rolling stock and the control and maintenance centre (CMC).The Circle Line is 15.5 km long, all underground double tunnel plus 1 km connection tunnel to the CMC, also double tube. The diameter is expected to be 4.9 m identical to the present Copenhagen metro tunnel diameter. There will be 17 stations, all underground. Tunnelling will be, to the possible extent, within the Copenhagen limestone, but it will have to pass areas of different geology at some sections. TBMs are anticipated for tunnelling. Precast concrete segments were applied for the present metro tunnel within the same type of geology. Contractors are expected to be invited to prequalify in late 2008. The planned construction start is scheduled by 2010, for service by 2018. Approved budget is DKK15 billion with a 50% probability. For the MCW engineering contract, visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=213057-2006, OJ S 200, or contact Orestadsselskabet, Copenhagen, fax +45 33112301 or 39661060. For the MTS engineering contract, visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=213058-2006, OJ S 200, or contact Orestadsselskabet, Copenhagen, fax +45 33112301 or 39661060. E-mail asj@orestad.dk or pba@orestad.dk. Read E-News Weekly 49/2004. 44/06.Negotiated procedure, deadline 24th November, 2006 for a series of deep borings for sampling of geotechnical information along the alignment and at station and shaft locations. The programme considers 150-200 borings down to 50 m. Pumping tests will be made from a number of these borings. A further 50-100 borings down to 10 m will focus on sampling of environmental information. The programme shall be executed during 2007 and reported in two stages in geotechnical data reports which will be made available to the consultants for the Circle Line project. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=219804-2006, OJ S 206, or contact Orestadsselskabet, Copenhagen, fax +45 33112301 or 39661060. E-mail asj@orestad.dk or pba@hifab.dk. Read E-News Weekly 49/2004. 45/06.The five prequalified consortia for the civil works engineering for the City ring line, Copenhagen metro's Circle Line, are: City Ring Consultants including Carl Bro, FaberMaunsell, and Niras; Cowi, Arup, and Systra; LSI Metro Group including ISC, ILF, and Setec; Parsons Brinckerhoff, teaming with Sweco, DE-Conscult, Erik K. Jí¸rgensen, Al-Gruppen, and Skaarup & Jespersen; and Rambí¸ll allied with Atkins.The five prequalified consortia for the transportation systems engineering are City Ring Consultants including Carl Bro, FaberMaunsell, and Niras; Cowi, Arup, and Systra; MottMacDonald, ISC, Hansen & Hennberg, Setec, and Interfleet; Parsons Brinckerhoff, teaming with Sweco, DE-Consult, Erik K. Jí¸rgensen, Al-Gruppen, and Skaarup & Jespersen; and Rambí¸ll allied with Atkins.Bids will be submitted on 20th March, 2007. Contract awards are expected in June 2007. Click dk/12. Read E-News Weekly 49/2004. Visit www.m.dk/en/construction/future.htm 07/07.GEO and Per Aarsleff have been contracted to undertake a series of deep borings for sampling of geotechnical information along the alignment and at station and shaft locations of the planned Circle Line. The programme considers 150-200 borings down to 50 m. Pumping tests will be made from a number of these borings. A further 50-100 borings down to 10 m will focus on sampling of environmental information. The programme shall be executed during 2007 and reported in two stages in geotechnical data reports which will be made available to the consultants for the Circle Line project. Plans for the City Circle Line were approved by the Danish Parliament on 1st June, 2007. Then the project will move to the project basis and conceptual design stage with tenders planned in two years and construction with tenders scheduled in three years. Read E-News Weekly 50/2005 & 49/2004. Visit www.m.dk/om_metro/anlaeg/etape4/geoteknik.htm, www.geo.dk and www.aarsleff.com 35/07.A joint venture of COWI, Arup and Systra won the engineering contract for the multi-disciplinary civil works (MCW) for the circle line in Copenhagen. A joint venture of Ramboll, Atkins Denmark and Atkins UK pocketed the engineering contract for multi-disciplinary transportation systems (MTS) for the same line. The total amount of these two contracts over a 10-year period is in the DKK400-600 million range. Read E-News Weekly 49/2004. Visit www.cowi.dk, www.arup.com, www.systra.com, www.ramboll.dk, www.atkinsglobal.com and www.m.dk 43/07.Metroselskabet has signed a contract with LE34 for surveying for the circle line project in Copenhagen. Visit www.le34.dk 23/08.

NEED QUALIFIED PERSONNEL?



Contract award, value EUR1.7 billion, to Copenhagen Metro Team JV comprising Salini Costruttori SpA/Tecnimont/Seli for construction of Copenhagen Cityringen metro comprising twin 17.4 km tunnels and 17 stations at 30 m depth. More information from Salini, tel +39 0667762-78, fax -24. Works commence immediately for completion 2018 using four EPB TBMs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028236-2011. 04/11.

NEED QUALIFIED PERSONNEL?



Invitation to tender using negotiated procedure, deadline 26.03.2012, for design of Nordhavnen metro as a branch of Cityringen with first 1.9 km in twin bored tunnel followed by 350 m-long ramp in cut/cover. Includes one underground station and one surface station. Contract duration 84 months. Further information from www.hifab.dk/aktuelle_udbud. Specs and docs from Carsten Larsen in Soeborg, tel +45 39661014, e-mail hifab@hifab.dk, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=063522-2012. 09/12.

 

NEED QUALIFIED PERSONNEL?



Award of contract value EUR2.47 million to Ramboll/Arup JV of Copenhagen for design of Nordhavnen metro as a branch of Cityringen with first 1.9 km in twin bored tunnel followed by 350 m-long ramp in cut/cover. Includes one underground station and one surface station. Further information from www.hifab.dk/aktuelle_udbud and aec@ramboll.dk, tel +45 51611000. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=271078-2012. NUTS code DK01. 35/12.

NEED QUALIFIED PERSONNEL?



Invitation to tender using negotiated procedure, deadline 15.02.2013, for supply of two TBMs and boring of 2 x 1.8 km-long tunnels of internal diameter 4.9 m between Nordhavnen and the bifurcation chamber at Cityringen located under Sortedams Soe. Contract duration 36 months. Information about procurement process from http://www.bascon.dk/da/unbud. Further information, specs and docs from Carsten Larsen at Bascon A/S in Hellerup, tel +45 39661014, e-mail cla@bascon.dk, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=401851-2012. 51/12.

NEED QUALIFIED PERSONNEL?



Additional information on TBMs diameter, to be delivered after award of the negotiated procedure, deadline 15.02.2013. The two TBMs will bore 2 x 1.8 km-long tunnels of internal diameter 4.9 m between Nordhavnen and the bifurcation chamber at Cityringen located under Sortedams Soe. Contact Mikkel Kjaer Jensen at Metroselskabet I/S, Copenhagen, tel +45 72424572, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=036012-2013. 06/13.

NEED QUALIFIED PERSONNEL?



The awarding procedure for supply of two TBMs and boring of 2 x 1.8 km-long tunnels of internal diameter 4.9 m between Nordhavnen and the bifurcation chamber at Cityringen located under Sortedams Soe has been discontinued. Contact Mikkel Kjær Jensen, Metroselskabet I/S, Metrovej 5, Copenaghen, tel +45 72424572, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=089589-2013. 12/13.

NEED QUALIFIED PERSONNEL?



Invitation to tender using negotiated procedure, deadline 13.05.2013, for contract CRNH1 & 2 tunnelling and underground civil works including boring of 2 x 1.8 km-long tunnels of internal diameter 4.9 m between Nordhavnen and the bifurcation chamber at Cityringen located under Sortedams Soe and associated works. Contract duration 60 months. Information about procurement process from http://www.bascon.dk/da/unbud. Further information from Mikkel Kjaer Larsen, e-mail mkj@m.dk. Specs and docs from Carsten Larsen at Bascon A/S in Hellerup, tel +45 39661014, e-mail cla@bascon.dk, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=092759-2013. NUTS code DK011. 12/13.

NEED QUALIFIED PERSONNEL?



Invitation to tender using negotiated procedure, deadline 22.04.2013, for architectural finishes at 17 underground stations on Cityringen. Contract value EUR70 million, duration 62 months. Information about procurement process from http://www.bascon.dk/da/unbud. Further information from Tom Kai Christensen, e-mail tkc@m.dk. Specs and docs from Carsten Larsen at Bascon A/S in Hellerup, tel +45 39661014, e-mail cla@bascon.dk, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=096253-2013. 13/13.

NEED QUALIFIED PERSONNEL?



Invitation to tender using negotiated procedure, deadline 15.05.2013, for contract CRNH4 concerning transportation systems works for Cityringen branch off to Nordhavnen. The design and built contract includes permanent way, traction power and power supply. Contract duration 60 months. Information about procurement process from http://www.bascon.dk/da/unbud. Further information from Mikkel Kjaer Jensen, e-mail mkj@m.dk. Specs and docs from Carsten Larsen at Bascon A/S in Hellerup, tel +45 39661014, e-mail cla@bascon.dk, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=092627-2013. 13/13.

NEED QUALIFIED PERSONNEL?



Additional information about languages to be used for invitation to tender using negotiated procedure, deadline 15.05.2013, for contract CRNH4 concerning transportation systems works for Cityringen branch off to Nordhavnen. Contact Metroselskabet I/S, Metrovej 5, att.n Mikkel Kjaer Jensen in Copenhagen, tel +45 724245772, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=135418-2013. 17/13.

NEED QUALIFIED PERSONNEL?



Additional information about languages to be used for invitation to tender using negotiated procedure, deadline 13.05.2013, for contract CRNH1 & 2 tunnelling and underground civil works including boring of 2 x 1.8 km-long tunnels of internal diameter 4.9 m between Nordhavnen and the bifurcation chamber at Cityringen located under Sortedams Soe and associated works. Contact Metroselskabet I/S, Metrovej 5, att.n Mikkel Kjaer Jensen in Copenhagen, tel +45 724245772, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=135441-2013. 17/13.

NEED QUALIFIED PERSONNEL?



Systemair has been selected by CMT Company (Copenhagen Metro Team) for the supply of the tunnel fans and allied equipment for the emergency ventilation system for the new metro line in Copenhagen, the Cityringen. Value of contract approximately EUR 4.5 million. The new line will consist of a twin tube tunnel 17.4 km in length, with 17 new stations located 30 m below ground level. The line will be fully automated and run 24 h/day. Read the press release. Visit http://www.systemair.com/it/Italia/Soluzioni/Tunnel-and-Metro/. 37/13.

NEED QUALIFIED PERSONNEL?



The Danish public transportation company Metroselskabet I/S awarded to JV Zublin A/S (60 percent)/Hochtief (40 percent) the EUR150 million contract for Copenhagen’s new metro line between Ostersogade and the new Nordhavn metro station, part of the City Circle Line in the Danish capital. The contract involves the design and construction of twin TBM tunnels, lengths 1,800 m and 1,600 m,  the 80 m Nordhavn subway station, a small tunnel, a ramp structure, a service shaft/emergency exit and a pedestrian transfer tunnel to the existing S-train urban rail station Nordhavn. The contract includes the installation works. The design of the project will start immediately; the first construction works will begin in late 2014. Final handover to Metroselskabet will be in 2019. Visit http://www.zueblin.de and http://www.hochtief.com. 24/14.

NEED QUALIFIED PERSONNEL?



Award of contract CRNH12 to MetNord (a JV of Zueblin A/S and Hochtief Solution AG) of Trige, Denmark for tunnelling and underground civil works including boring of 2 x 1.8 km-long tunnels of internal diameter 4.9 m between Nordhavnen and the bifurcation chamber at Cityringen located under Sortedams Soe and associated works. Contract duration 60 months. Further information from Mikkel Kjaer Larsen, tel +45 72424572, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=219864-2014. NUTS code DK011. 27/14.

NEED QUALIFIED PERSONNEL?



Invitation to tender using negotiated procedure, deadline 18.08.2014, for consultancy services in relation to Cityringen - branch off to Ny Ellebjerg via Sydhavnen. The new section will include a 3.5 km-long bored tunnel, a cut/cover tunnel and five stations, perhaps all underground. Contract duration 96 months from award. Time limit for receipt of requests for documents or for accessing documents: 17.08.2014. Further information, specs and docs from Carsten Larsen at Bascon A/S in Hellerup, tel +45 39661014, e-mail cla@bascon.dk, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=223329-2014.Ref.n. 2014072111. 27/14.

NEED QUALIFIED PERSONNEL?



Award of contract CRNH4 to Ansaldo STS spA of Rome, Italy, for transport systems works from bifurcation chamber at Cityringen, located under Lake Sortedams Soe, to the Orient Kaj station. Further information from Mikkel Kjaer Larsen, tel +45 72424572, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=279294-2014. NUTS code DK011. 33/14.

NEED QUALIFIED PERSONNEL?



JV Cowi/Systra of Kongens Lyngby secured the contract for consultancy services in relation to Cityringen - branch off to Ny Ellebjerg via Sydhavnen. The new section will include a 3.5 km-long bored tunnel, a cut/cover tunnel and five stations, perhaps all underground. Contact Metroselskabet I/S, attn Mikkel Kjaer Jensen, Copenhagen, tel +45 72424572, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=008607-2015. Ref.n. 2014072111. 03/15.

NEED QUALIFIED PERSONNEL?




Zublin A/S from Trige secured contract T4 2which is for the transfer tunnel from the Osterport Station on the City Circle Line (Cityringen) to the existing Osterport Station at Copenhagen. For further information please contact Metroselskabet I/S at Copenhagen, email procurement@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=056971-2017. 07/17.


NEED QUALIFIED PERSONNEL?



NCC Danmark A/S from Soborg secured contract T6 for the transfer tunnel from the Kongens Nytorv  Station on the City Circle Line (Cityringen) to the existing Kongens Nytorv Station at Copenhagen. For further information please contact Metroselskabet I/S, attn Johan Storgaard, Copenhagen, email procurement@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=056971-2017. 07/17.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=056342-2017. 22/17.